Loading...
13-105529 0 0 Mechanical City of Federal Way FILE Community&Econ:Dev.Services Permit #: 13-105529-00-ME 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: SLONE Project Address: 32416 12TH AVE SW Parcel.Number: 926494 0080 Project Description: Replace existing gas furnace 1110 \ Owner Applicant Contractor DENNIS H SLONE JAIMIE HOW BRENNAN HEATING&A/C LLC PAULA J SLONE BRENNAN HEATING&A/C (GENERAL) 32416 12TH AVE SW 4601 S 134TH PL BRENNHA971R9(12/29/15) FEDERAL WAY WA 98023-4914 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional permit Information Is this an Online or O.T.C.application? Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Tuesday, June 10, 2014 Permit Issued on Thursday, December 12, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ON 1.I N E Date: TITS CARD IS TO MAIN ON-SITE CITY OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-105529-00-ME Address: 32416 12TH AVE SW Project: DENNIS H SLONE FEDERAL WAY, WA 98023-4914 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) `13 Gas Piping(4125) E Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By ' i7 Date 12--(2p 13 0 Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date