Loading...
13-1035541W City Of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Ab Building = Single Family Permit #: 13 -103554 -01 -SF Inspection Request Line: (253) 835-3050 Project Name: NGONEVOLALATH Project Address: 106 S 293RD ST Parcel Number: 720250 0120 Project Description: NEW - Construction of a 2,205 square foot single family residence with a 1,048 square foot lower floor garage and an 814 square foot deck. Includes plumbing & mechanical. **3 bedrooms; $550,000 estimated selling price** REVISION: Convert 520 square feet of crawl space/garage to habitable space. Owner Applicant Contractor Lender THIP & NICOLE DEONTOLOGY DESIGN & BUILD OWNER IS CONTRACTOR WASHINGTON FEDERAL SAVINGS NGONEVOLALATH LLC Plumbing Work Valuation?....................................10000 2206 S 320TH ST 2002 62ND ST SE 114 ALASKAN WAY S SUITE 200 Plumbing to be Included?.......................................Yes FEDERAL WAY WA 98003 AUBURN WA 98092 SEATTLE WA 98104 family) Census Category: 101 - New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: V - B Floor Areas . ft. 2,725 0 0 0 Additional Permit Information New / Additional Sq. Feet - 1 st Floor....................1993 New / Additional Sq. Feet - 3rd Floor....................0 New / Additional Sq. Feet - Basement...................0 No Occupancy #I - Construction Type ........................Type V - B New / Additional Sq. Feet - Garage .......................528 Plumbing Work Valuation?....................................10000 Occupancy # 1 - Class.............................................R-3 Plumbing to be Included?.......................................Yes 4067 Occupancy # 1 -Use ............................................... Residence (1 or 2 family) lJ New / Additional Sq. Feet - 2nd Floor...................212 Occupancy #I - Area (Sq. Feet).............................2725 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck .......................... 814 Mechanical to be Included?....................................Yes Mechanical Work Valuation?.................................10000 New / Additional Sq. Feet - Other ..........................520 New / Additional Sq. Feet - Total .......................... 4067 Zoning Designation................................................RS 9.6 No Fixtures Associated With This Permit H CONDITIONS: 1. Due to erosion concerns, all earthwork activities (clearing, grading, excavations, etc) shall NOT occur before April 30, nor after October 1 (dates defined as the 'wet season' in Western Washington), unless specifically authorized by Public Works. 2. All erosion control measures shall be maintained for the life of the project, until such time as the site is completely stabilized. 3. A City Right of Way (ROW) Permit is required for the storm drain connection into the catch basin on 1st Ave S. The ROW Permit shall be finalled, prior to final Building Permit sign -off and/or C. of O. Contact Kathleen Messinger at (253) 835-2725 for the ROW Permit requirements. 4. All utility service connections shall be underground - no overhead allowed. 5. Retaining walls shall not exceed a maximum height of six feet. 6. Eaves, awnings and similar elements of a structure that customarily extend beyond the exterior walls of a structure may extend up to 18 inches into any required yard. PERMIT EXPIRES Saturday, October 22, 2016 Permit Issued on Monday, April 25, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: City of Federal Way Certificate of Occupancy Date' This Certificate, issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: NGONEVOLALATH Address: 106 S 293RD ST Permit #: 13 -103554 -01 -SF Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: Floor Area (sq. ft.) 2,725 0 0 0 Owner Name: THIP & NICOLE NGONEVOLALATH THIP & NICOLE NGONEVOLALATH Owner Name: Owner Address: 2002 62ND ST SE AUBURN WA 98092 04&j Ida- � ri Building Official ate The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most sevedy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner /occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which itis situated. Such compliance is the responsibility of the owner and/or occupant of the premises. AM City & Federal Way C;ornmunity & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: NGONEVOLALATH Project Address: 106 S 293RD ST Building - Singh Fawi'3T Permit #: 13 03554-00=S F Inspection Request Line: (253) 835-3050 Parcel Number: 720250 0120 Project Description: NEW - Construction of a 2,205 square foot single family residence with a 1,048 square foot lower floor garage and an 814 square foot deck. Includes plumbing & mechanical. **3 bedrooms; $550,000 estimated selling price** Owner Applicant Contractor Lender , THIP & NICHOLE DEONTOLOGY DESIGN & BUILD OWNER IS CONTRACTOR WASHINGTON FEDERAL SAVINGS NGONEVOLALATH LLC 0 2206 S 320TH ST 2002 62ND ST SE 114 ALASKAN WAY S SUITE 200 814 FEDERAL WAY WA 98003 AUBURN WA 98092 SEATTLE WA 98104 Yes New / Additional Sq. Feet - Other ..........................0 Census Category: 101 - New Single Family House Includes: #1 42 #3 44 Occupancy Class: Construction Type: Occupancy Load: Floor Areas . ft.) 0 0 0 0 No Fixtures Associated With This Permit II CONDITIONS: 1. Due to erosion concerns, all earthwork activities (clearing, grading, excavations, etc) shall NOT occur before April 30, nor after October 1 (dates defined as the 'wet season' in Western Washington), unless specifically authorized by Public Works. 2. All erosion control measures shall be maintained for the life of the project, until such time as the site is completely stabilized. 3. A City Right of Way (ROW) Permit is required for the storm drain connection into the catch basin on 1st Ave S. The ROW Permit shall be finalled, prior to final Building Permit sign -off and/or C. of O. Contact Kathleen Messinger at (253) 835-2725 for the ROW Permit requirements. 4. All utility service connections shall be underground - no overhead allowed. 5. Retaining walls shall not exceed a maximum height of six feet. 6. Eaves, awnings and similar elements of ;a structure that customarily extend beyond the exterior walls of a structure may extend up to 18 inches into any required yard. �G t -W oS W fl > Additional Permit Information New / Additional Sq. Feet - 1 st Floor....................1993 New /Additional Sq. Feet - 2nd Floor ................... 212 New / Additional Sq. Feet - 3rd Floor....................0 New'/ Additional Sq. Feet - Basement ................... 0 Basic Plan?........................................................... No New / Additional Sq. Feet - Deck......................... 814 New / Additional Sq. Feet - Garage .......................1048 Mechanical to be Included? ...................................... Yes New / Additional Sq. Feet - Other ..........................0 Plumbing to be Included? ....................................... Yes New / Additional Sq. Feet - Total .......................... 4067 Zoning Designation ................................................ RS 9.6 No Fixtures Associated With This Permit II CONDITIONS: 1. Due to erosion concerns, all earthwork activities (clearing, grading, excavations, etc) shall NOT occur before April 30, nor after October 1 (dates defined as the 'wet season' in Western Washington), unless specifically authorized by Public Works. 2. All erosion control measures shall be maintained for the life of the project, until such time as the site is completely stabilized. 3. A City Right of Way (ROW) Permit is required for the storm drain connection into the catch basin on 1st Ave S. The ROW Permit shall be finalled, prior to final Building Permit sign -off and/or C. of O. Contact Kathleen Messinger at (253) 835-2725 for the ROW Permit requirements. 4. All utility service connections shall be underground - no overhead allowed. 5. Retaining walls shall not exceed a maximum height of six feet. 6. Eaves, awnings and similar elements of ;a structure that customarily extend beyond the exterior walls of a structure may extend up to 18 inches into any required yard. �G t -W oS W fl > PERMIT EXPIRES Monday, October 19, 2015 Permit Issued on Wednesday, April 22, 2015 I hereby certify that the abov information is correct and that the construction on the above described property and the occupancy and the us ill be c rdance with the laws, rules and regulations of the State of Washington and e City of Federal Way. Zd 7'zlt Owner or agent: t Date: City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: NGONEVOLALATH Address: 106 S 293RD ST Permit #: 13-103554-00-SiF Includes: # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) 0 0 0 0 THIP & NICHOLE NGONEVOLALATI Owner Name: THIP & NICHOLE NGONEVOLALATI Owner Name: Owner Address: 2002 62ND ST SE AUBURN WA 98092 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most seventy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner /occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which itis situated. Such compliance is the responsibility of the owner and/or occupant of the premises. ti C �*.. •� •J-7,fATE tiIto INSPECTOR AREA AND TYPE OF ; , Plwwal &oMjct6(,ks bk +0 POIAV N• Wath. ' '-SAI-dg -" ' S7lA,VVC w 9+k QC ^s+od I h-,6164 As Pcv f "s cft+V&Gkw Powys P'Ar owe, kd;SL G,Co+CJA P.NA S• . tobdiT ':,�. G o a, w R�act�ta ha r .�k�d T ecvv, --. IO zQ -goLT / 2 �� THIS CARD IS TO REMAE'N' ON-SITE �`r r CITY °FConstruction Inspection Record Fed-eral Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 13 -103554 -00 -SF Address: 106 S 293RD ST Project: THIP & NICHOLE NGONEVOLALAI FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg (4400) Initial Erosion Control (4365) ❑ Footings/Setback (4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By } �; Date ; V - LS Shear Walls (4245) Approved to install siding By Date -3115/), Mechanical Rough -in (4165) Approved By Date ❑ Foundation Wall (4115) Prior to scheduling a F=inspection;Framing E] Drainage/Downspout (4040) Date Zj 1,4 c-, ❑ Plumbing Groundwork (4190) Approved to place concrete By Date Approved to backfill Date Approved to cover By Date "1 1 3o f5-' By Date By Date Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) Floor Sheathing (4105) ❑ Gypsum Wallboard Nailing (4130) Approved to place concrete Final Erosion Control (4375) Approved to sheath floort�l Approved to install wallboard Approved to install mud & tape Approved to install flooring By Date Date By Date Date By Date Shear Walls (4245) Approved to install siding By Date -3115/), Mechanical Rough -in (4165) Approved By Date ❑ Roof Sheathing (4220) Prior to scheduling a F=inspection;Framing Approved to install roofing By Date Zj 1,4 c-, ❑ Gas Piping (4125) Approved to release test By Date Rough Plumbing (4230) Approved By AIJ Date Fire/Draft Stops (4095) Approved By Date El Interim Erosion Control (4370) Prior to scheduling a F=inspection;Framing (4120) Approved Electrical, Plumbing & Meand Approved to insulate Date Fire/Draft Stop inspections andBy Date By approved. IBBy By Date By Date Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) ® Final Erosion Control (4375) Approved to install wallboard Approved to install mud & tape Approved By Date By Date By Date Final - Mechanical (4065) Final - Plumbing (4075) ❑ Final - Building (4050) Approved Approved Approved By Date By Date By Date El Rough Electrical Final Electrical 1:1Approved Right of Way Approved Approved By Date By Date By Date WATE O. AREA AND TYPE O CITY OF Federal Way PERMIT #: THIS CARD IS TO REMAIN ON-SITE r Construction Inspection'Record INSPECTION REQUESTS: (253) 835-3050 13 -103554 -01 -SF Address: 106 S 293RD ST Project: THIP & NICOLE NGONEVOLALATF FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. EJ SWM Precon Site Mtg (4400) Initial Erosion Control (4365) E] Footings/Setback (4110) Approved By To be done prior to breaking ground Approved to place concrete By Date By Date By Date EJ Foundation Wall (4115) Drainage/Downspout (4040) E] Plumbing Groundwork (4190) Approved to place concrete By Approved to backfill Approved to cover By Date By Date By U ,r Date t;- Slab/Concrete Floor (4255) ❑ Underfloor Framing (4285) Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date ❑ Roof Sheathing (4220) Shear Walls (4245) Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date ❑ Mechanical Rough -in (4165) Gas Piping (4125) ❑ Fire/Draft Stops (4095) Approved Approved to release test Approved Date ._ _ By V-,5 Date i t f Y B - _ Date L'' 1 �- Interim Erosion Control (4370)prior to scheduling a Framing inspection; Framing (4120) Approved Electrical, Plumbing &Mechanical Rough -in and Fire/Draft Stop inspections be '� Approved to insul to e E w� 5 By (L_-_ Date must signed -off and approved. IBC 109.3.4 ; Vb.uY By Date_ Insulation (4150) Gypsum Wallboard Nailing (4130) E] Final Erosion Control (4375) Approved to install wallboard Approved to install mud & tape Approved B Date 3._ By Date a $ By Date Final - Mechanical (4065) Final - Plumbing (4075) ❑ Final - Building (4050) Approved Approved Approved By �-G� Date (U _ Bye_ ( Date (()-4— By_� Date t j'e �,- EJ Rough Electrical Approved ❑ Final Electrical Approved Right of Way Approved By Date By Date By Date OPCS Structural Solutions Seattle 811 First Avenue, Suite 620 • Seattle, WA 98104 - tel: 206.292.5076 Tacorna 1250 Pacific Avenue, Suite 701 • Tacoma, WA 98402 • tel: 253.383.2797 WWW PCS -S June 19, 2015 MEMO TO: Self Builder Services, Inc. ATTN: Dennis Lee FROM: Jack Pinkard, S.E. RE: Ngonevolalath Residence COMMENTS: Details 1 and 2, Sheet S3.1, show weep holes to relieve water pressure behind the concrete walls. In lieu of weep holes it is acceptable to provide footing drains near the base of the wall. The footing drains should be placed and designed to allow the water behind the wall to drain. JJPdls 13-438 13438 mem 05-19-15 jp Project: lL" b.Qw� 11_*n b4' Iob Na Subject: Sheet Name: Structural Solutions Originating Office: ❑ Seattle OTacoma Date: 71IS115 sec,--inc k) N O Tt:A-T- I ►.i �$fGS e C -T �� wrrH Q Pi o1�vt�trc !,+„ s '' 20•n A C_ Co (L AJ L2 31e- 5 P * I'-' 15 FWoTNC P*- - S3, t Seattle # 811 First Avenue, Suite 620 • Seattle, WA 98104 - tel: 206.292.5076 www.pcs-structural.com Tacorna a 1250 Pacific Avenue, Suite 701 • Tacoma, WA 98402 - tel: 253.383.2797 a s s o c i a t e d earth sciences i n c o r p o r a t e d 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com To: Nicole and Thip Ngonevolalath 2218 North Huson Street _Tacoma, WA 98406 ATTN: Dennis Lee, Dennis@selfbuilderservices.com FIELD REPORT Page 1 of 2 Date Project Name Project No. 6/2/2015 Ngonevolalath Residence_ KE1305766 Location TMunicipality Weather South 293rd Street, Federal Way, WA Federal Way Overcast Permit No. DPD No. I Report No. Engineer/Architect Client/Owner Nicole and Thip Ngonevolalath General Contractor/Superintendent Dennis Lee, Self Builder Services AS REQUESTED BY: Self Builder Services I Pile Contractor/Superintendent McDowell Pile King inc. THE FOLLOWING WAS NOTED: All nine pipe piles were successfully installed by McDowell Pile King inc. in accordance to designs by AESi (Figure 1). The nine pipe piles were 4" in diameter, driven into the ground by a hydraulic impact hammer until the correct refusal criteria was reached (Table 1). The hammer in use produced 1100 Ib/ft of pressure, which dictates a refusal rate of 1 inch every 10 seconds. All piles were cut to 5"-6" above ground level, this length is not included in the embedded depth. U, Flat`C"", c4AJca -C- Willi, V VV Figure 1: Displays locations of the nine pipe piles installed on the northwest corner of the site. Copies o: Field Rep: Peter Linton, Staff Geologist Date Mailed; Principal / PM: Bruce Guenzler, Senior Project Geologist V. 6/1 This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager AESI FIELD REPORT w To: Nicole & Thip Ngonevolalath Project Name: Ngonevolalath Residence Date: 6/2/2015 Project No.: KE130576B - -- - ----- -- -- --- — ---- ------ ------------ -. Permit DPD No. No. Page 2 of 2 Pile 1 Pile 2 Pile 3 Pile 4 Pile 5 Pile 6 Pile 7 Pile 8 Pile 9 Pile Diameter 4" 4" 4" 4" 4" 4" 4" 4" 4" Ground Level (Feet) 82.2 82.17 82.5 83.5 83.5 84 85 85 85.5 Embedded Length (Feet) 12.3 16 12.3 12.4 12.5 15 14.5 14 13.5 Tip of Pile (Feet) 69.9 66.17 70.2 71.1 71 69 70.5 71 72 Refusal Value Reached (1 YES Inch/10 sec) YES YES YES YES YES YES YES YES Table 1: Pipe pile measurements and depths. Copies To: Date Mailed: v. 6/14 Field Rep: Peter Linton, Staff Geologist Principal / PM: Bruce Guenzler, Senior Project Geologist This document is considered a DRAFT until signed or initialed by an AES/ Principal or Project Manager IlehsloRs NgonevolalaM Thip & Nichole Feng Shui Residence t S 293rd street, Federal Way Permit SM Project#*02 DEDNTOLOGY 114 ALASKAN WAY 5 SUITE 200 PARCEL # 720250012005 SEATTLE, WA 98104 206.4979603 PERMIT NUMBER %XXX tnio0deonllccom RECSVED 0 47wo� l Cl" OF AUG 13 2013 PERMIT APPLICATION Federal Way CITY OF FEDERAL WAY (% CDS /3 PERMIT NUMBER _ — TARGET DATE SITE ADDRESS SUITE/UNIT # PROJECT VALUATION ZONINGASSESSOR'S TAR/PARCEL # $ 3 5v ? o - ? — TYPE OF PERMIT BUILDING PLUMBING ECHANICAL El DEMOLITION ❑ENGINEERING El FIRE PREVENTION NAME OF PROJECT � oil e')Ilk - e.Lz s:9 -e ICe 4'F Com. 3 PROJECT DESCRIPTION Detailed description of work to Z � T3a�'�.S e _ nk wnr dr iDt be included on this permit only PROPERTY OWNER NAM Tke PRIMARY PRONS 74 19 MADJoa ADDRESS 'M k K n Gv / • /I STATE I ZIP kl7t�P1 iv V CVdl C.r.CyWCl, NAME PHONE gO ,plo a L5,,��X ZS i Z 3� -E-MAIL r t. MAILING DRESS iN Skn sc?oo Fre,�kJo@ bt,^UX.Lo.-• CONTRACTORll.�� W ZIP � � ©� FAX Ow/�' WA STAT&tczxsx # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # -/��) NAj"9166 PRIhL4LRY i I� APPLICANT ` a D �11 Ofl M N E -MAD. �I C ALL o� 7('4k., C77 'Fie sr P z>p FAx PROJECT CONTACT N ��j PRIMARY PHONE AO� ��°`^' ZS3' ZI Li . E-MAIL rr( ``7 1�`` �� I'� "L•�' -'< ti Lt.G� (The individual to receive anMAlLWq)&DI1ZSS d respond to all correspondence �ti MC STA l� Z[P G FAX �Stfl[ concerning this application)CITY PROJECT FINANCING NwMEVV 'A`-�I OWNER -FINANCED Required value 000 or more (RCW 19.9. 277. 095) PHONE I certify under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as as part oof, thisapplication. iss 7 SIGNATURE: & '� _ "G/ DATE / J PRINT NAME: Bulletin #100 —January 1, 2013 Page 1 of 3 k:\Handouts\Permit Application 40 f l ,V 0 GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS FOR OFFICE USE BASEMENT d $ .C%