Loading...
11-104293 • Mechanical City of Federal Way Community Development Services Permit #: 11 -104293-00-ME P.O.Box 9718 Federal Way,WA 98063-9718 Insection Request Line: 25 Ph:(253)835-2607 Fax (253)835-2609 RLE p Q 3) 835-3050 Project Name: PIERSON 14.)� Project Address: 132 S 294TH PL Parcel Number: 543720 0120 Project Description: GAS TO GAS WATER HEATER REPLACEMENT Owner Applicant Contractor KEN R PIERSON WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 717 INDUSTRY DR NORTHWEST PERMIT/WESCO (GENERAL) SEATTLE WA 98188 1345 W GULF RD WASHIES971OB(9/2/13) POINT ROBERTS WA 98281 2800 THNE TTLEORWADYK98199AVE W SEA . s .,.,: .. :. .c! ,., au'.,Skt, ,: >.4,.;..as'3 ::s:.,, i;. .. ,x:,:, •.S? • W .:a : ,.., "a Mechanical Valuation 950.00 Is this an Online or O.T.C.application? Yes • t;41/44*0A10). \ f'.; rtrripilir-3 Hot Water Tanks 1 PERMIT EXPIRES Wednesday, April 18, 2012 Permit Issued on Friday, October 21, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington City of Federal Way. agent: 9 Owner or a ONLINEhe Date: { I ( II JJ lOIN 'i THISCARD IS TO REMAIN ON-SITE r CITM'pF Construction I ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 11-104293-00-ME Address: 132 S 294TH PL Project: KEN R PIERSON FEDERAL WAY, WA 98003-3625 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in (4165) El Gas Piping(4125) 'El Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By / / Date /0 3/-/4 El Rough Electrical El Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date