17-104714 Mechanical
City of Way ay Permit #:17-104714-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: DAHL
Project Address: 2353 SW 339TH ST Parcel Number:330620 0235
Project Description: Remove/replace gas water heater
Owner Applicant Contractor
MICHAEL T DAHL SALINA THAPAFAST WATER HEATER FAST WATER HEATER CO(GENERAL
2353 SW 339TH ST COMPANY 01)
FEDERAL WAY WA 98023-7730 11715 NORTH CREEK PKWY S SUITE C-106 FASTWWH948BC(1/4/18)
BOTHELL WA 98011 1715 NORTH CREEK PKWY S SUITE C-10.
BOTHELL WA 98011
Additional Permit Information
Mechanical Work Valuation? 1291 Is this an Online or O.T.C.application? Yes
,N.,,,, a+,�:, .,.�PiG,,., ;.Y'�m. a ..,,;..,.,y ,.u.,,� �.,.,.,�, 'n:'s"�'me��,��,6�:� ,,,,,s�,mi�,��. , �.„nog. ,.✓„ .1;,, ,, �, ,r �.> , „v,. .,,,,%„�,r.,�
Hot Water Tanks 1
PERMIT EXPIRES Sunday, 1 April,2018
Permit Issued on Tuesday,October 3,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ONLINE
Date:
a .
4400,AkTHIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
rederai vvay INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 104714 00 Address: 2353 SW 339TH ST
Project: JANE DAHL FEDERAL WAY WA 98023-7730
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
•
1❑ Mechanical Rough-in(4165) 0 Gas Piping(4125) �, Final-Mechanical(4065)
Approved Approved to release test Approved
By Date � By Date By JUJU Date 'Z,—5-1 g
0 Rough Electrical 0 Final Electrical 0 Right of Way
Approved Approved Approved
By Date By Date By Date