Loading...
17-105650 • • Mechanical City oYFederal Way Permit #:17-105650-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 FILE Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: HENRY Project Address: 31730 5TH AVE S Parcel Number:794170 0360 Project Description: Replacing gas furnace Owner Applicant Contractor AMANDA HENRY VANESSA STEPHENSONWASHINGTON WASHINGTON ENERGY SERVICES CO 31730 5TH AVE S ENERGY SERVICES CO (GENERAL 01) FEDERAL WAY WA 3909 196TH ST SW WASHIES851NS(9/7/19) 98003-5205 LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Mechanical Work Valuation? 3700 Is this an Online or O.T.C.application Yes Furnaces 1 PERMIT EXPIRES Monday,21 May,2018 Permit Issued on Wednesday,November 22,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: NJ L I N E Date: r ' . THIS CARD IS TO REMAIN ON-SITE ��� Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 105650 00 Address: 31730 5TH AVE S Project: AMANDA HENRY FEDERAL WAY WA 98003-5205 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough-in(4165) 0 Gas Piping(4125) Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date a- t)-1 2. D. 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date