13-102862wilding - Multi Fftmily
City of Federal Way Permit #: 13 102862 00 MF
Community &Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Liner 253 '835-3050
Ph: (253) 835-2607 fax: (253) 835-2609 " ' peca
Project Name: PARK 16 APARTMENTS - BUILDING H
Project Address: 35703 16TH AVE S Bldg H Parcel Number: 292104 9107
Project Description: NEW - Construction of a new 3 -story, 3457 square foot duplex above a 1624 square foot
6 -car garage, including plumbing and mechanical.
Census Category: 103 - New Two -Family Building
Includes:
#1 #2 #3 #4
Owner
Applican
Contractor
Lender
Occupancy Load-
oadFloor
PARK 16 LLC
DEVCO INC
HEARTLAND CONSTRUCTION
OWNER IS LENDER
11100 MAIN ST SUITE 301
11100 MAIN ST SUITE 301
HEARTC1052Q7 (1/3/16)
BELLEVUE WA 98004
BELLEVUE WA 98004
11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Census Category: 103 - New Two -Family Building
Includes:
#1 #2 #3 #4
Occupancy Class:
R-3 U
Construction T
Type V - B
Occupancy Load-
oadFloor
Occupancy #I -Use...............................................Apartment
FloorArea . ft.
3,457 1,624 0 0
New / Additional Sq. Feet - 2nd Floor .................... 1659
Building Pre -con. Meeting Required?....................No
Mechanical to be Included?....................................Yes
Permit for Building Shell Only9 .............................No
Special Inspection(s) Required?.............................Yes
Occupancy #I -Use...............................................Apartment
House
Zoning Designation...............................................RM
2400
New / Additional Sq. Feet - 3rd Floor....................1798
New / Additional Sq. Feet - Garage .......................1624
Number of Stories.................................................3
Plumbing to be Included?.......................................Yes
New / Additional Sq. Feet - Total .......................... 5081
Sensitive Areas? (Wetlands/Slopes, etc)................Yes
Ducting........................................... 2 Fans................................................ 10
Plumbing Futures
Bathtubs ......................................... 6 Dishwashers................................... 2 Laundry Washer Outlets ............... 2
Lavatories ....................................... 6 Sinks...........................................,.... 2 Water Closets................................. 6
Water Heaters ................................. 2
CONDITIONS:
Public Works: Prior to Building Final and/or Certificate of Occupancy:
1)The TRACT X Agreement for future roadway alignment shall be fully executed and recorded
2)AIl off-site street improvements shall be completed
Planning: Prior to Certificate of Occupancy
3) Prior to the issuance of a certificate of occupancy for any building on the subject site, all on-site
improvements related to the proposed development must be installed, inspected, and approved by the city.
On-site improvements include, but are not limited to, storm drainage system; utilities; parking stalls and
drive aisles; interior parking lot landscaping; bicycle parking facilities; perimeter landscaping; pedestrian
walkways; common recreational open space and tot lot play areas; minor improvements within wetland
buffer area and associated, buffer mitigation; garbage and recycling facilities; and parking lot and pedestrian
area lighting.
4) Prior to issuance of a certificate of occupancy for any residential buildings on the site, a Transportation
Demand Management (TDM) plWhat addresses how the site manageme am will encourage the uselb�'
"afternativt ones of transports shall be submitted to the city for revi nd approval.
5) Prior to issuance of certificate of occupancy for any resi4eatial,building on the subject site, the applicant
shall provide written evidence that a site inspection with the City of Federal Way's Crime Prevention Analyst
has been done to ensure that site and building lighting, video, surveillance, and security fencing limiting access
to the wetland buffer area trail to daylight hours meets minimum Crime Prevention Through Environmental
Design (CPTED) standards for personal safety.
6) Prior to issuance of certificate of occupancy foany residential building on the subject site, the applicant
shall record an affordable housing covenant, that -as been approved by the city, that identifies a minimum of
five percent of the residential units (minimum of 15 units) will be affordable for the life of the project to
households earning no more than 50 percent of the median income in King County.
PERMIT EXPIRES Wednesday, January 14, 2015
Permit Issued on Friday, July 18, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
w
Owner or agent: Dater �T
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed byi/ staff.
Tenant Name: PARK 16 APARTMENTS - BUILDING H Permit #: 13 -102862 -00 -MF
Address: 35703 16TH AVE S BldgH
Indludes:
#2 #3 #4
Occupancy Clesst
U
Construction Type:
Type V - B
Occupancy Load
Floor Area (sq. ft.)
3,457 1 1,624 1 0 0
Owner Name: PARK 16 LLC
Owner Address: 11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Building Official Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severiy affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor
wan -ants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which itis situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
r. r
IINSIIEC'I'*A AREA
,o r
k\113
oke— c
Lt-�I� ti
- 30
Unr of 4A
Federal Way
THIS CARD IS TOMAIN ON-SITE ,
Construction In ection Record
INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 13 -102862 -00 -MF Address: 35703 16TH AVE S Bldg H
Project: PARK 16 LLC FEDERAL WAY, WA 98003
`Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Footings/Setback (4110)
Foundation Wall (4115)
❑ Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
Date '-;;,_ -e -Z-
Bye -6 S Date _ 1 _'
Date tj I n ( t4
Re -steel (4215)
Approved to place concrete or grout
By
Underfloor Framing (4285)
Approved to sheath floor
By Date
❑ Roof Sheathing (4220) Rough Plumbing (4230)
Approved to install roofing Approved
By '55Date- Date ` -7//
® Gas Piping (4125) Fire/Draft Stops (4d
Approved to release test Approved
By Date By Date
Framing (4120) El Insulation (4150)
Approved to insulate Approved to install wallboard r
By/ Dat��Of/T BSS Date
Suspended Ceiling Grid (4265) Final - Fire Department (4060)
Approved to drop the Approved
By Date By <-K- GA Date Z - ZS-
Mechanical Rough -in (4165)
Approved
Date
'14
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
Final - Planning
Approved
By L ) Date Z - ( / -
Final - Public Works (4080) Final - Mechanical (4065) Final - Plumbing (4075)
Approved Approved Approved
By Date2 . S - Date B Date
El
Final - Building (4050)
Approved
B Date -z—?-&- es -
Rough
Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
Plumbing Groundwork (4190)
Slab/Concrete Floor (42 5)
Approved to cover
Approved to place concrete
By
Date1 L
By
Date
❑
Floor Sheathing (4105)
Shear Walls (4245)
Approved to install flooring
Approved to install siding
By
Date
By
Date \ ?j
❑ Roof Sheathing (4220) Rough Plumbing (4230)
Approved to install roofing Approved
By '55Date- Date ` -7//
® Gas Piping (4125) Fire/Draft Stops (4d
Approved to release test Approved
By Date By Date
Framing (4120) El Insulation (4150)
Approved to insulate Approved to install wallboard r
By/ Dat��Of/T BSS Date
Suspended Ceiling Grid (4265) Final - Fire Department (4060)
Approved to drop the Approved
By Date By <-K- GA Date Z - ZS-
Mechanical Rough -in (4165)
Approved
Date
'14
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
Final - Planning
Approved
By L ) Date Z - ( / -
Final - Public Works (4080) Final - Mechanical (4065) Final - Plumbing (4075)
Approved Approved Approved
By Date2 . S - Date B Date
El
Final - Building (4050)
Approved
B Date -z—?-&- es -
Rough
Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
• 0
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
January 12, 2015
City of Federal Way
Attn: Bldg Dept
33325 81` Ave S.
Federal Way, WA 98003
RE: Final Letter
Park 16 Apartments (Bldg A, B, C, H and Rec Bldg)
16"'Ave S&S356"'St.
Federal Way, WA 98003
To Whom It May Concern:
KA No. 066-14052
Permit No. 1310289901 -CO
1310285000 -MF
1310224200 -MF
1310286200 -MF
1310285200 -MF
In accordance with our clients request and authorization, we have performed special testing and
inspection services for the above referenced project. The special inspections for this project were:
• Reinforcing Steel • Structural Steel Welding
• Cast in Place Concrete
• Proprietary Anchors
• Lateral Framing
To the best of our knowledge, all work has been tested and inspected and has been found to be in general
accordance with the approved plans and specifications, and engineering revisions, and chapter 17 of the
2012 international Building Code.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our
office at (253) 939-2500.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC
-4
William Throne
Operations Manager
Puyallup
CC: Heartland Construction
With Offices Serving The Western United States
922 — Valley Avenue NW Suite 101 • Puyallup, WA 98371 • (253) 939-2500 • Fax; (253) 939-2556
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 9, 2015
City of Federal Way
Attn: Bldg Dept
33325 8' Ave S.
Federal Way, WA 98003
RE: Final Letter
Park 16 Apartments
1611 Avenue S. 8t S. 3561h Street – Federal Way, Washington
To Whom It May Concern:
KA No. 066-14052
RECEIVED BY
COMMUNITY & ECONOMI
At-VELOPMENT DEPARTMENT
JUN 12 2015
In accordance with our clients request and authorization, we have performed special testing and
inspection services for the above referenced project. Work was performed on the following permit
numbers:
13 -102842 -00 -MF
13 -102858 -00 -MF
13 -102863 -00 -MF
13 -102867 -00 -MF
13 -102872 -00 -MF
13 -102876 -00 -MF
13 -102895 -00 -MF
13 -102850 -00 -MF
13 -102860 -00 -MF
13 -102864 -00 -MF
13-102868-WNT-
13 -102873 -00 -MF
13 -102877 -00 -MF
13 -102899 -01 -CO—
13 -102852 -00 -MF'¢
13 -102861 -00 -MF
13 -102865 -00 -MF
13 -102869 -00 -MF
13-102874-WMF
13 -102892 -00 -MF
13 -102900 -00 -CO
The special inspections involved with this project were:
• Reinforcing Steel
• Cast in Place Concrete
• Proprietary Anchors
• Lateral Framing
13 -102857 -00 -MF
13 -102862 -00 -MF—
13 -102866 -00 -MF
13 -102870 -00 -MF
13 -102875 -00 -MF
13 -102893 -00 -MF
• Structural Steel Welding
To the best of our knowledge, all work has been tested and inspected and has been found to be in general
accordance with the approved plans and specifications, and engineering revisions, and chapter 17 of the
2012 international Building Code. If you have any questions, or if we can be of further assistance, please
do not hesitate to contact our office at (253) 939-2500.
Resp y submitted
ttr S, INC
William Throne
Puyallup Operations Manager
CC: Heartland Construction
_ With Offices Serving The Western United States
922 — Valley Avenue NW Suite 101 0 Puyallup, WA 98371 • (253) 939-2500 • Fax: (253) 939-2556
inry.'.:-..-tmo\
Federal Way
•
RECEIVED
JUN 2 8 2013
•
PERMIT APPLICATION
CITY OF FEDERAL WAY
11 3- 1 'W 2 8 6 2- M F T,t„M RATS
N/A
aas.s.Iae.eNEWMAM0 Building
35703 16th Avenue South, Federal Way, WA 98093 H
�/
maim •isa inm ioMw Aeaan Z CM 9 2 1 0 4 9 0 9 5
= yC0WO 2 9 2 1 0 4- 9 1 0 7
TM 01 MA16 a
m BmLzxxo 0 Pa uwlo 0 MzcHAmcAL 0 DEMOLMON 0 ZlloIM=No 0 Rite PRzvzwnon
SAM OW rlet>JA=
Park 16, BUILDING H
New Constrution of & Dublex 0
3 -story. V -B building containing 2 units.
FROJIM
Detaged ty,","* 60
be:uauded as Odeponnit NJy
>!!AO>rilrt! o91lIiR
xwo
Dominion HdAinIP6 LLC
edeas saw
253 -735 -2000
3570316th Avenue South
aa..s jesseostfab.com
tan Federal Way
WA I
w 98093
awe
Heartland Construction, Inc.
n■as
425-453-9551
awn st all 11100 Main Street, #301
tneubaucrodevcoaptLcom
CONTMAC,t,O*
an
Ddkv=
Rws
WA
aar
98004
ewe
425-453-9566
wN vase keMlisstera a
CC BEARTQ05207
aloaYtlw awe
12 / 23 /13
tawNL Uw ano.aek a—=—= e
20 -13 -102125 -W -BL
awe
Park 16, LLC
sterane rs.os
425-453-9551
■�a»swaw 11100 Main Street. #►301
tneubaueredevcoa ts.com
sassksrrrs
Bellevue
WA
as
98004
sea
425-453-9566
PWXWNM CONTACt
svtt�
CPH Co tt Ho
saarwr: spew
425-235-233-9-0
aanMwnwloae
733 7th Avenue, Suite 100
Sats
nsultants.com
Mw indioi hW to receive and
respond to a0 cormspandntce
esus Kirkland
WA
as 98033
us 425-285-2389
tlw
PX0J>1CT lillANUM
aw Pending
® (eumentlyl
Requiod eaauo el A000 or emote
(RCW]..?7.095)
awaaa •awa*� s**T. *ansa, >•
saiess
r wK4j s^dw twNft dam! awl sn tate p wa is Owner or snanrlk i fffint y ate r wo ff www. r ""Atha a are had
d �wr ► IA. bwrwueMw w�ikrM*ed M +yrr«t ei tlW Nrwit esrilssMsw M trw swi esrred. r seri jp� Nrkt t kdtl eakyay war
dt empon.sh c" d Awbm was "wwwwws nsr*dnbtn wars era►tt waneloei be #a temeenee of s Pam& r rnirseend flat tet
1ammonse d this renuft din not review Sim wavers respowtUft jbr sewpOwwes wai► bwl, s*k*q r jbderd lowe rggwhdhV
eweetrselien ranebenow st laws.
IJbtbr erne Is hsi herwisee the Cllr dYadWr+d R es to sero oiklw Mme/ oeeft agpw ss% seed sftworej w bwrsi in
No i--WVW- ani dV wee deed► sllmM4 WMA w>r he waft y den/srwti inshwbw are rndte ow -4 and~ codket are oft
bt ewe wrart swat skin w6wee one d art r wase d as oft bsrdbw w gdiMk ski sMlerew► wen Ow ...w.0 d tao
bybwkaaw aw"M M is are oft e• snot* d*7
a�uTo�st VATS
Toass Neubauer
DWI@" M 00 - )=my 1.2013 Pulp 1 of 1c*1a0atoutsl wMkAppladon
E
•
VALue of JatcxAxCAL Wb�c
MECHANICAL PERMIT
Indicate hoar num of each to be 6ssfaGed or rekwated as part of this omiact Do not 6tclude eAWing fudures to remain.
AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe)
AIR CONDMONER FfltZK.ACE INSERTS HOODS Icowwr=A
BOII.ERS FURNACES HOT WATER TANKS p.y
COMPRESSORS y GAS LOG SETS REFRIGERATION SYST
DUcTTNO OAS PMO WOODSTOVES
PLUMBING PERNIIT
C94�4-"
Rvu ► � i
VAUX OFPLUMW G WbRK
$ 1 O, D 60
Indicate horn num of each Um
offaftm
to be but ted or reboaW as pan of this pmjwt Do not 6u*uds &yntingfoftm to reaedn.
BATHTUBS (o.'db/sro.. C.W* ��
LAVS pi w &,&4 TOILETS
�� WATER PIPING
DISHWASHERS
nas o rra ormstse.*.IMP
RAINWATER SYSTEMS URINALS
OTHER )Describe)
DRAWS
o Yes o No
MOWERS VACUUM BREAKERS
DRINKING FOUNTAINS
�
SINKS I, --ch. ► WATER HEATERS (Devic♦
HOSE BUM
SUMPS WASHING MACHINES
TOTAL Vz9f1R0f
GENERAL INFORMATION
CIRTWAL ARM" osi 1lrasaKM
VAT= sotns*os
TAM 01 astorar0 nvaav:rmlta
Yes
Lakehaven
Lakehaven
11000,000
oas
Lm acs ps ae.... V-4
nas o rra ormstse.*.IMP
raosoa® sw.orrss..os.�.ratr
Steel Fabricator
o Yes o No
A Yes o No
Bulletin *100 — January 1, 2013 Pap 2 of 3 k W andoutsTandt Application