13-102865. wilding Muld Family
City of Federal Way 0 Permit #: 1302865 -00 -MF 1
Community& Econ. Dev. Services A
� �
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: 253 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609 ' P q
Project Name: PARK 16 APARTMENTS -`BUILDING S
Project Address: 35703 16TH AVE S Bldg'S Parcel Number: 292104 9107
Project Description: NEW - Construction of a new 3 -story, 3457 square foot duplex above a 1624 square foot
6 -car garage, including plumbing and mechanical.
Owner
Applican
Contractor
Lender
PARK 16 LLC
DEVCO INC
HEARTLAND CONSTRUCTION
OWNER IS LENDER
11100 MAIN ST SUITE 301
11100 MAIN ST SUITE 301
HEARTCI052Q7 (1/3/16)
BELLEVUE WA 98004
BELLEVUE WA 98004
11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Census Category: 103 - New Two -Family Building
Includes:
#1 #2 #3 #4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load
Floor Areas . ft.
1,659 0 0 0
Additional Permit lnfQli�on
New / Additional Sq. Feet - 2nd Floor...................1659
Building Pre -con. Meeting Required?....................No
Mechanical to be Included?....................................Yes
Permit for Building Shell Only? .............................No
Special Inspection(s) Required?.............................Yes
Occupancy # 1 -Use ............................................... Residence (1 or 2
family)
Zoning Designation...............................................RM 2400
New / Additional Sq. Feet - 3rd Floor....................1798
New / Additional Sq. Feet - Garage .......................1624
Number of Stories.................................................3
Plumbing to be Included? ....................................... es
New / Additional Sq. Feet - Total .......................... 5081
Sensitive Areas? (Wetlands/Slopes, etc)................Yes
Bathtubs ......................................... 6 Dishwashers................................... 2 Laundry Washer Outlets................ 2
Lavatories ....................................... 6 Sinks............................................... 2 Water Closets................................. 6
Water Heaters ................................. 2
CONDITIONS:
Public Works: Prior to Building Final and/or Certificate of Occupancy:
1)The TRACT X Agreement for future roadway alignment shall be fully executed and recorded
2)All off-site street improvements shall be completed
Planning: Prior to Certificate of Occupancy
3) Prior to the issuance of a certificate of occupancy for any building on the subject site, all on-site
improvements related to the proposed development must be installed, inspected, and approved by the city.
On-site improvements include, but are not limited to, storm drainage system; utilities; parking stalls and
drive aisles; interior parking lot landscaping; bicycle parking facilities; perimeter landscaping; pedestrian
walkways; common recreational open space and tot lot play areas; minor improvements within wetland
buffer area and associated buffer mitigation; ;garbage and recycling facilities; and parking lot and pedestrian
area lighting.
4) Prior, t4;i! suance of a certificoMf occupancy for any residential buildin n the site, a Transportations e
Demand Management (TDM) p hat addresses how the site managemexam will encourage the use of
alternative modes of transportation shall be submitted to the city for review and approval.
5) Prior to issuance of certificate of occupancy for any residential building on the subject site, the applicant
shall provide written evidence that a site inspection with the City of Federal Way's Crime Prevention Analyst
has been done to ensure that site and building lighting, video surveillance, and security fencing limiting access
to the wetland buffer area trail to daylight hours meets minimum Crime Prevention Through Environmental
Design (CPTED) standards for personal safety.
6) Prior to issuance of certificate of occupancy for any residential building on the subject site, the applicant
shall record an affordable housing covenant, that has been approved by the city, that identifies a minimum of
five percent of the residential units (minimum of 15 units) will be affordable for the life of the project to
households earning no more than 50 percent of the median income in King County.
PERMIT EXPIRES Wednesday, January 14, 2015
Permit Issued on Friday, July 18, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date: '-I
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed by_fy staff.
Tenant Name: PARK 16 APARTMENTS - BUILDING S Permit #: 13 -102865 -00 -MF
Address: 35703 16TH AVE S B1dgS
Includes:
41 42 #3 #4
Occupancy Class:
R-3
Construction T
Type V - B
Occupancy Load
Floor Area (sq. ft.)
1,659 1 0 0 0
Owner Name: PARK 16 LLC
Owner Address: 11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Building Official
Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severly affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor
warrants to the owner /occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
INSPECTOP
i
EA AND TYPE C - INSPECTION
S
G rcgd- � Sd�l
[S 14'
�'
PI'4k�Ttati !2E-ST��L � • 1..1NE
14
13
-qt - %S
c y4- -
iL
k) 4- LOT 0t -Af-
2g;�-AL
C9
ti
CITY OF
Federal Way
PERMIT #:
Project:
• THIS CARD IS TOAIN ON-SITE
Construction In ection Record
INSPECTION REQU TS: (253) 835-3050
13 -102865 -00 -MF Address: 35703 16TH AVE S Bldg S
PARK 16 LLC FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Footings/Setback (4110)
Foundation Wall (4115)
Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
Dat _`
>y Dat?
Re -steel (4215) 1 Plumbing Groundwork (41ll
a /0) Slab/Concrete Floor (4255)
Approved to place concrete or grout Approved to cover Approved to place concrete
By Date t 0 — � -s— Date _ ` _. ` By Date
Underfloor Framing
Approved to sheath floor
By Date
Floor Sheathing (4105)
Approved to install flooring
By Date
Shear Walls (4245)
Approved to install siding
Date
Roof Sheathing (4220) Rough Plumbing (4230) ❑ Mechanical Rough -in (4165)
Approved to install roofing Approved Approved
By f A L Date Date _.e _ZG _ B Date ,
Gas Piping (4125)
Approved to release test
By Date
Framing (4121
Approved to insulate
Date1A — � — `
Fire/Draft Sta
Approved
Date _
❑ Insulation (4150)
Approved to install wallboard
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved IBC 109.3.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
Date _t-�_ 1
Final - Public Works (4080) 0 Final - Mechanical (4065)
Approved Approved
By Date B S Date
Final - Building (4050)
Approved
Date
Final - Plumbing (4075)
Approved
Date _
Rough Electrical Final Electrical Right of Way
Approved Approved F1 Approved
By Date By Date By Date
Suspended Ceiling Grid (4265)
Final - Fire Department (4060)
Final - Planning
Approved to drop tile
Approved
Approved
By
Date
By
Date
By
Date
Final - Public Works (4080) 0 Final - Mechanical (4065)
Approved Approved
By Date B S Date
Final - Building (4050)
Approved
Date
Final - Plumbing (4075)
Approved
Date _
Rough Electrical Final Electrical Right of Way
Approved Approved F1 Approved
By Date By Date By Date
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 9, 2015
City of Federal Way
Attn: Bldg Dept
33325 8b Ave S.
Federal Way, WA 98003
RE: Final Letter
Park 16 Apartments
16m Avenue S. & S. 3561b Street — Federal Way, Washington
To Whom It May Concern:
KA No. 066-14052
RECEIVED BY
COMMUNITY & ECONOMi
AF-VELOPMENT DEPARTMENT
JUN A zo15
In accordance with our clients request and authorization, we have performed special testing and
inspection services for the above referenced project. Work was performed on the following permit
numbers:
13 -102842 -00 -MF
13 -102858 -00 -MF
13 -102863 -00 -MF
13 -102867 -00 -MF
13 -102872 -00 -MF
13 -102876 -00 -MF
13 -102895 -00 -MF
13 -102850 -00 -MF
13 -102860 -00 -MF
13 -102864 -00 -MF
13 -102868 -00 -MF
13 -102873 -00 -MF
13 -102877 -00 -MF
13 -102899 -01 -CO
13 -102852 -00 -MF
13 -102861 -00 -MF
13 -102865 -00 -MF
13 -102869 -00 -MF
13-102874-WMF
13 -102892 -00 -MF
13 -102900 -00 -CO
The special inspections involved with this project were:
• Reinforcing Steel
• Cast in Place Concrete
• Proprietary Anchors
• Lateral Framing
13 -102857 -00 -MF
13 -102862 -00 -MF
13 -102866 -00 -MF
13 -102870 -00 -MF
13 -102875 -00 -MF
13 -102893 -00 -MF
• Structural. Steel Welding
To the best of our knowledge, all work has been tested and inspected and has been found to be in general
accordance with the approved plans and specifications, and engineering revisions, and chapter 17 of the
2012 international Building Code. If you have any questions, or if we can be of further assistance, please
do not hesitate to contact our office at (253) 939-2500.
Respecy subnm tied,
C S, INC
William Throne
Puyallup Operations Manager
CC: Heartland Construction
With Offices Serving The Western United States
922 — Valley Avenue NW Suite 101 • Puyallup, WA 98371 • (253) 939-2500 • Fax: (253) 939-2556
i� •
4Q-�y� FIELD
�l aZa 1& Ass o c i ate s, Inc. REPORT NO.: 14052DFRO40115-MM
Geotechnical Engineering . Environmental Engineering
Construction Testing and Inspection
DATE: 4/1/2015 CONTRACTOR: Heartland
PROJECT #: 06614052 PERMIT #: see below
PROJECT: Park 16 Aeartments INSPECTOR: Martin Mundy
LOCATION: 357U3 1 6rhvenue out JURISDICTION: I-ecleral way
KA P.M.: Bill Throne WEATHER: Overcast TEMP: 50'
On site for proprietary anchor inspection.
Verified that the Simpson Strong -Tie Wedg-all (5/8" x 10") galvanized expansion anchors in
Buildings L, M, Q, R, S, T, and AA were embedded into the concrete the required four inches
and were tensioned to 90 ft/lbs (per manufacturer's recommendation).
Building permit numbers
Building L
13 -102874 -00 -MF
Building M
13 -102875 -00 -MF
Building Q
13 -102877 -00 -MF
Building R
13 -102864 -00 -MF
Building S
13 -102865 -00 -MF
Building T
13 -102866 -00 -MF
Building AA
13 -102895 -00 -MF
Reviewed By:
ASTM Test #:
Equipment/Asset Number(s):
To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements.
Su perintendent/Representative:
Technician:
Offices Serving the Western United States
Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Puyallup (253) 939-2500
Daily Field Report Revision 8 Effective 02/13/2013
The inf etien provided on chis rcprm is pre -i fm the arclusive use of the diem. This report may not be rcpmducd in any format withom the written pmnission of the dicot end Kmun d: Aswcutn. This report indiuW our inspttlon observation end teeing rcsuas bests on site conditions and wntrector
aconnn. This information is subject m review prior to Gnel wbmittal. By signing this report our inspector don not accept rnponsibiliry for validiry of results. The same information hes been provided by othcm on s�tc.
Mw et `
Federal loh3f
RE&IVED
JUN 2 S 2013
•
PERMIT APPLICATION
CITY OF FEDERAL WAY
CDS
PBRIMN11 3- 1 0 2 8 6 5- M F T.NGVfD„„=
RV
errs Auoyaaa a0tls/vyti Buildina
35703 16th Avenue South, Federal Way, WA 98093
rM0Aw •AM%w w sows ssraCON'rAi/sARM •
t 2 9 2 1 0 4 9 0 9 5
$'fc16 A 2 9 2 1 0 4- 9 1 0 7
two/
TTPx OF
® Bumaxo 13 PwwNo ❑ ulcmmcn 0 Dcuounox C3 ENoi Emmo ❑ Fum Phesvehmox
NAMS OF PIMA CT
Park 16, Buildin j BUILDING S
PRDJz T� u qfuwkn
New Construction of a Duplex over a 6 -car onAm
3 -story, type V -B buildingcontaining 2 units.
be 6whided on Wepvrrnit only
PEOPURIT own=
sm
Dominion Holding4 LLC
sasust!sass
253-735-2000
■ARAS 3570316th Avenue South
Seim jesse03tfab.com
ail I
Federal Way
NUMB
WA
sfr
98093
sms
Heartland Construction, Inc.
VMMs
425453-9551
MARASAaeasfs 11100 Main Street. #►301
tneubauerodevcoa ts.com
CONTRACTOR
qrY
Bellevue
WAX2
WA
av
98004
/As
425-453-9566
waw N&M aaretuaratY. LUMMIfs •
saO Mff a ais
lae®eL qT sfiawa t oes •
C
/ 23 /
-
NARM
Park 16, LLC
laws!rsass
425453-9551
ausasAaffnaea 11100 Main Street. #301
tneubaueredevcoa ts.com
APPLICANT
CUT
Bellevue
WAis
WA
ss
98004
sA:
425-453-9566
PROD T CONTACT
NAts
CPH Consultants Matt Ho
rfatfAw/ kers
425-285-2390
arAaereAwsM
733 7th Avenue, Suite 100
mattocPhconsultantLcom.
(Me indiuednal to receive
respond to al! awreVondence
concerning gppHoadwo
conthea
ccaw_VAX
Kirkland
WA
as 98033
425-285-2389
SWT FINANCING
o0 Pending
® aWNwwAXCED(currently)
Required vahm *f A000 or mon
(RCW 19.27.094
MARAS Aaaoto„ ail. *fAT% W
lw-
1 eMllb awMloneft elhNrjeey that I sin the paparty *w w or awthertser agent of the ley owner. I eeryy that b the bed
4f my hnew8e04 tb 4wrwaNew swbn~ to swjWwt 4tfthb permit apNestlew is bwa mLt sernet l Goto that 1 OW ees" VIM
att "wade b City $ )rdwst wdy ray-tdbwe yertwome to the werft mdhwtaer by the teewsuve K - p m& I Ywrent-wr that the
iswrsnes b thly pnwft rive not peeepw an eww✓s nqpew ribift jbr emoVAmee with teeslr ems, or 1bdw4d Imre rMandbM
sewebYdtew er ewellwwwestst tawa
1Jlrthw agree fa MW harwhess the Cy aDwml ttrag o to mW etvlw Mweituddy 0001; vpewevti mer etternegW Yee iwswrrer in
the tnvedfyen— -sur do— $ such vides whish wag be wade by My Msw% inabdim the undwakn*4 andNw womw the aft
int esu* who ,waft oil" mteve ewe of an wit -waw N the dy inehm W ib seas Md ayteyw8% wwt the esswu t► of U"
iryYwatbw en"tivd to the aft se ap .* dgot
GWATUM DATs
P74M NAM Tom Neubauer
Bulkdn 0100 -Immy 1, 2013 Page 1 of k Wmdout0amit Application
--- vALuaaP�Aenrac wbrac
MECHANICAL PERIvnT (� C � ,) 2 L000
bulkote how mmx greach two of rawe to be &uMxRW or nDooatsd as part of this ymint Do not bwh e gymnafagums a nmw L
AIR HANDLING UNITS I Q FANS OAS PIPE OUTLETS OTHER (DencrMO
AIR CONDITIONER FIREPIaCE INSIMTS HOODS (aessrtd.A
BOQSRS FURNACES HOT WATER TANKS p.y
COBGWI390RB L OAS IAO SETS REFRIOERATION SY9T
DUCTING tar—�S OAS PIPING WOODSTOVES
GENERAL. INFORMATION
METWAL A4 os PEOPORM
WASR41sRr4lelt
VAT XOPPLUIt M MW
PLUMBING PERMIT
(Q
�1,1 ���'! t 1�
10" D6 -Y3
Jndicots how asamy ofeach two
ofAymm
to be instoAod or nloautad as part of" proJect, Do not kchidowdstinalidurms to nanaim
BATHTUBS („r,s/wwwc-mw ALL
LAVS Psrdamo ToMsT9
�, WATER PWM
DISHWASHERS
o Yes ❑ No
RAINWATER SYSTEMS URINALS
OTHER (Desalt)
DRAINS
SHOWERS VACUUM BREAttERs
DRI NKINO FOUNTAINS
SINKS w ars _2 WATER HEATERS (wenq
HOSE &88e
SUMPS WASHING MACHINES
TOTAL FaTMENS
GENERAL. INFORMATION
METWAL A4 os PEOPORM
WASR41sRr4lelt
s411a1t 1saoRle►4
TAM 01 >� av4olamtts
Yea
Lakehaven
Lakehaven
11000.000
wv�=S
Las aO ps sqr F-4
2XWt1 t6 Fm4 slmm ols:sat*
!4010630 sas.osrRO.o....raer
Steel Fabricator
o Yes ❑ No
R Yes o No
RESIDENTIAL - NEW OR ADDITION va g�
ABTA DUCYarMTt On square ZZUMNQ pmopo� TOTAL FOUR OFFICI! um
FIRST FLOOR(or Mob&Homo 1659 +1798 =3457
SECOND 1'r MP
COVES ENTRY IndudW 1624 garage
DEW kAuded
omAoz)t cARPolrr o
4T sR 4 D.F=R
Area Totals
ESTMATED SEUINO PRICE N/A T OF BEDROOMS
COMMERCIAL — NEW/ADDITION Nhv
ARMDIItC1RIFTiOTI in Ana Feed 0Z 1W.saF Oao� C t10 Of Additlosal Ishrmatlon
3slllld :. .. . -
ApneDOat
COMMERCIAL — REMomArENANT IMPROVEMENTS N/A
ARM Ana in at==Foot Oeeal�7 FIM Commotion Ty"t 0 Of a Additional IntasmaHoa
TIT AL ; M
TaxART AREA anT
?Aoi18tSTAM ally'
Bulletin #100 — Jamu" 1.2013 Page 2 of 3 lc1HandoutslPemdt Application