13-102893{ i 1 It Family
C Federal Way ifuilding - 8Permit #: 13 -102893 -00 -MF
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-30L50 )
Ph: (253) 835-2607 Fax: (253) 835-2609 FILE
Project Name: PARK 16 APARTMENTS - BUILDING X
Project Address: 35703 16TH AVE S Bldg X Parcel Number: 292104 9107
Project Description: NEW Construction of a new 3 -story, 24 -unit, 33107 square foot multifamily building,
including plumbing and mechanical. Project includes 904 square feet of decks.
Owner
ARRI11can
Contractor
Lender
PARK 16 LLC
DEVCO INC
HEARTLAND CONSTRUCTION
OWNER IS LENDER
11100 MAIN ST SUITE 301
11100 MAIN ST SUITE 301
HEARTCI052Q7 (1/3/16)
BELLEVUE WA 98004
BELLEVUE WA 98004
11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Census Category: 105 - New 5- or More Family Building
Includes:
# 1 #2 #3 #4
Occupancy Class:
R-2
Construction Type:
Type V - A
Occupancy Load
Floor Areas . ft.
33,107 0 0 0
Additional Permit Information'
New / Additional Sq. Feet - l st Floor....................11006
New / Additional Sq. Feet - 3rd Floor....................5448
Building Pre -con. Meeting Required?....................Yes
Mechanical to be Included?....................................Yes
Permit for Building Shell Only?............................No
Special Inspection(s) Required?.............................Yes
Occupancy#1 -Use...............................................Apartment House
Zoning Designation...............................................RM 2400
New / Additional Sq. Feet - 2nd Floor...................10912
New / Additional Sq. Feet - Basement...................5741
New / Additional Sq. Feet - Deck ..........................904
Number of Stories.................................................3
Plumbing to be Included?.......................................Yes
New / Additional Sq. Feet - Total .......................... 34011
Sensitive Areas? (Wetlands/Slopes, etc)................Yes
r
Ducting........................................... 24 Fans................................................ 96
Plumbing Fixtures
Bathtubs ......................................... 48 Dishwashers................................... 24 Laundry Washer Outlets................ 24
Lavatories ....................................... 48 Sinks............................................... 24 Water Closets................................. 48
Water Heaters ................................. 24
CONDITIONS:
Public Works: Prior to Building Final and/or Certificate of Occupancy:
1)The TRACT X Agreement for future roadway alignment shall be fully executed and recorded
2)All off-site street improvements shall be completed
Planning: Prior to Certificate of Occupancy
3) Prior to the issuance of a certificate of occupancy for any building on the subject site, all on-site
improvements related to the proposed development must be installed, inspected, and approved by the city.
On-site improvements include, but are not limited to, storm drainage system; utilities; parking stalls and
drive aisles; interior parking lot landscaping; bicycle parking facilities; perimeter landscaping; pedestrian
walkways; common recreational open space and tot lot play areas; minor improvements within wetland
buffer area and associated buffer mitigation; garbage and recycling facilities; and parking lot and pedestrian
area lighting.
4) Prior td'iAuance of a certifiof occupancy for any residential build' on the site, a Transportatiolf
Demand Management (TDM) 0 that addresses how the site managemeam will encourage the use of
alternative modes of transportation shall be submitteche iew and approval.
X:
5) Prior to issuance of certificate of occupancy for any X, clen b g on the subject site, the applicant
shall provide written evidence that a site inspection w#b tog,Q typf F eral Way's Crime Prevention Analyst
has been done to ensure that site and building lighting, video surveillance, and security fencing limiting access
to the wetland buffer area trail to daylight hours meets minimum Crime Prevention Through Environmental
Design (CPTED) standards for personal safety.
6) Prior to issuance of certificate of occupancy for any residential building on the subject site, the applicant
shall record an affordable housing covenant, that has been approved by the city, that identifies a minimum of
five percent of the residential units (minimum of 15 units) will be affordable for the life of the project to
households earning no more than 50 percent of the median income in King County.
PERMIT EXPIRES Wednesday, November 26, 2014
Permit Issued on Friday, May 30, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: f Date: — 36 —/C/
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed byCity staff.
Tenant Name: PARK 16 APARTMENTS - BUILDING X Permit #: 13 -102893 -00 -MF
Address: 35703 16TH AVE S BIdgX
Includes:
#1 #2 #3 #4
Occupancy Class:
R-2
Construction Type:
Type V - A
Occupancy Load
Floor Area (sq. ft.) 1
33,107 0 0 0
Owner Name: PARK 16 LLC
Owner Address: 11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Building Official Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severly affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor
warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
DAT E
INSPECTOR
s ' rOY'NSPECTION
— 2— I
�3
1 ��"t�� i - '�bWw ���� -�e-{-i r• o�,� W Grp- �.
t
�)—•
-te- t
►,(y,
�J
1 )
re-c2� w� �►,� t�_C
t
a; S: , Z. �r A 0
— (
10oc� I
__
9—
�Vaw►�� G �SU e
u._►,--
�
Nt t-c s �� G
IN VA� 4 MAON-SITE r .
CITY OF
Way Construction Iection Record
INSPECTION REQU TS: (253) 835-3050,'
PERMIT #:
Project:
13 -102893 -00 -MF Address: 35703 16TH AVE S Bldg X
PARK 16 LLC FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Footings/Setback (4110)
Foundation Wall (4115)
Drainage/Downspout (4040)
Approved to place concrete
Approved to concrete
Approved to backfill
By Date L; _
B Date �� /
— Date
Re -steel (4215)
Approved to place concrete or grout
Date ( (r t-1 !i 11
® Underfloor Framing (4285)
Approved to sheath floor
By Date
Plumbing Groundwt
Approved to cover
Dat e_
0 Floor Sheathil
Approved to install
By Date
Slab/Concrete Floor (4255)
Approved to place concrete
By Date
Shear Walls (4245)
Approved to install siding
By i pw Date Z — q _ i 4'
❑ Framing (4120)
Approved to insulate
BLL_
Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final - Public Works (4080)
Approved
By Date
Final - Building (4050)
Approved
B
Date—_ Z�<
Insulation (4150)
Approved to install wallboard
Date � / 2 —(s
Final - Fire Department (4060)
Approved
By Date
❑ Final - Meehan
Approved
Date
0 Gypsum Wallboard Nailing (4130)
Approved to install rpud & tape
f e;nlpltif e -
By FA L Date 3 . ,2 .� I
Final - Planning
Approved
By Date
Final - Plumbi
Approved
Date (— _70_
®
Roof Sheathing (4220)
Rough Plumbing (4230)
0 Mechanical Rough -in (4165)
Approved to install roofing
Approved
Date
Approved
By
By
PR 1-• Date 12_—(3 ._14
g��
S Date 27-2, (
Date
Date 3 — /2—
2. -Gas
Gas Piping (4125)
Approved to release test
Por o scheduling a Framing inspection;
rl Fire/Draft Stops (4095)
Approved
JrFirc1DirZfftt'tStop
clPlumbing & Mechanical Rough -in and
By
Date
Byz Date ' Z
inspections must be signed -off and
approved. IBC 109. .4
❑ Framing (4120)
Approved to insulate
BLL_
Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final - Public Works (4080)
Approved
By Date
Final - Building (4050)
Approved
B
Date—_ Z�<
Insulation (4150)
Approved to install wallboard
Date � / 2 —(s
Final - Fire Department (4060)
Approved
By Date
❑ Final - Meehan
Approved
Date
0 Gypsum Wallboard Nailing (4130)
Approved to install rpud & tape
f e;nlpltif e -
By FA L Date 3 . ,2 .� I
Final - Planning
Approved
By Date
Final - Plumbi
Approved
Date (— _70_
®
Rough Electrical
Approved
Final Electrical
Approved
Right of Way—�
Approved
By
Date
By
Date
By
Date
Federal Way
REPEIVED
JUN 2 8 202
CITY OF FEDERAL WAY
CDS
M
PERMIT APPLICATION
1 3- 1 0 2 8 9 3- M F TA31=r DA=
N/A
STT= Aoalaa
martwom t
35703 16th Avenue South, Federal Way, WA 98093
Building X X
PROJIM VALUATION
$ 2 501&00
zowdn'ro
�r"l- 01400
Agasw2 t STA9 rA�ec2 .• I 0 4 9 0 9 5
2 9 2 1 0 4 - 9 1 0 7
tea' OF Psalm
® BwumNO 0 Pun=No 0 mwjmMCAL 0 DEMOUTION 0 ENOINZZMNO 0 Fmz PREY mom
NA3ti OF PRO.TRCT
Park 16, Building X
PROJI= DlsCRQTiON
New Construction of a 3-3to V-A building containing 24 units.
Detalisd deserodon of work to
be included on this point only
P=Pxwff owxxK
sAtis
Dominion Holdin s. LLC
rnorA=T r=o==
253-735-2000
WAVAM
3570316th Avenue South
sauo. )ease@stfab.com
CLTT
Way
aTATi
WA
wFederal 98093
RAM
Heartland Construction, Inc.
425-453-9551
KANMOAo 11100 Main Street, #301
tneubauer@devcoa ts.eom
CONTRAiCYOR
cr"
Bellevue
or&T=
I WA
or
98004
PA=
425453-9566
VA ffMM c0HTXAR 0WS'[ I
=1QOIAtI01t VA=
ripnR— VAT 39811=N UCQu a
CC I052 7
1 23
20-13-102125-00-B
NAM
P99MA=! rams
Park 16 LLC
425-453-9551
11100 Main Street, *301
to ubauer@devcoapts.com
APrr'ieAltT
My
Bellevue
I WAT= I
WA
sv
98004
TAX
425-453-9566
1AM
rra7lA=T rawir=
PDO.IHCT CONTACT
CPH Consultants Matt Hou
425-285-2390
rAnoro �
733 7th Avenue, Suite 100
sawn
matt@cphconsultants.com
Mw individual to receive and
respond to an correvondence
cm
Kirkland
STATS
WA
=
98033
VAX
425-285-2389
concerning Oda app9cation)
PROizat "NANCtlta
RAM Pending
® Own s MIZAxcso(Currently)
Reputed whre of $S Wo or mors
(RCW 19.27.094
ftAnQO AWNWN, aff STAT=. UP -T
17[01=
I eery* URAW pemoft eJpwjwv that'r a the pf"wty Owner or awhwtwd wood of ties 0rrper4 0wow. ! am"& that ter the "a
of xw hnewh die. the frVbraaefen suis"" in aatrport of thbParma appHeatiew to bw a" sanest. I eortrg that I Was emptr With
alf appffe"Is Cfly of lbdnel Why rgrrraltesa pwtatidap to the wrh adhortsod iy the is vasa of a panwfl: I undarstand that Uw
isaaasee of this per" dem set r"ww the ornar4 ewpawlitlky for eesyltaaso aath fees; atde. or J4dera1 tars ngu& Mp
asatrrwden o►aabenows el w"
I ferther arrw to heW haradas the Cft of lodend way w to awy afaba (Meladfy wet% arpeaaes, a" aaenwjw fe" inarme f in
ON taratyatbw sad dybaae of—" -%IA -W M sada b -v Moen. WftdMff U- . —diu" oqpninst tits aft
irrt ewd rrtrare awh ass" arta" oat of the of the am& i- u x" its oaloero nerd agrft-m w- the as --W of the
fq/erarattere sepptlad b tho altD P—
GI25/,�
.ItiltATifiRlis DAT:
irf WT MAN& Torn Neubauer _
&dletin #100 - January 1. 2013 Page 1 of 3 k:\Handouts\Permit Application
X4 l
U
VAGUE OFAiECNANICAL Idt=
MECHANICAL PERMIT Is Zem
Indicate host mmm ofeach ftme affiem to be vumged or mboawl as Pan of Ode pm,4wt Do not include am n/na*L
AIR HAND=G UNITS FANS GAS PIPE OUTIZIS OTHER (Dame)
AM CONDITIONER FIREPLACE INSERTS HOODS mwm rc4
BOILERS FURNACES HOT WATER TANKS row
COd�SES.90R9 GAS LOG SETS REFRIGESATION SM
DUCTING GAS PIPING wOODsrovEs
GENERAL LwoRMAnm
CRITICAL A 1 oil lYJDPZK Ts
wnTa P03LVETon
VALUE OF PLUMBING Wbil?!l
PLUMBING PERMIT
Yes
Lakehaven
$
I Wr cm
I how mmimy of each tupe
qtfta to be uistaQed or rebcafid as
this Do rte include
to nsrnain
BATHTUBS I.Tubj..awC.60
LAYS hemsoww
TOILETS
X WATERPIN NG
DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS
SHOWERS
VACUUM BREAKERS
DRINK]NO FOUNTAINS
SINKS t /uuw
WATER HEATERS (rawmwi
D
HOSE BIDES
SUMPS
WASHING MACHINES
TOTAL FZXT�
GENERAL LwoRMAnm
CRITICAL A 1 oil lYJDPZK Ts
wnTa P03LVETon
VAL= OR aslrfrais uvilo�ramrtR
Yes
Lakehaven
Lalcehaven
$ 1,000,000
Z=§Tmoirsswooa tlaR
Goo aois P. ems..."
aaazalo rm armin:Rs ala9mv
rRo.o.Rs ruRi.usrsawoir.�ssalr
Steel Fabricator
, 2q( 03
o Yes o No
XYes o No
Bulletin #100 — January 1, 2013 Page 2 of 3 LAHandoutAPandt Application
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 9, 2015
City of Federal Way
Attn: Bldg Dept
33325 8b Ave S.
Federal Way, WA 98003
RE: Final Letter
Park 16 Apartments
16m Avenue S. & S. 3561b Street — Federal Way, Washington
To Whom It May Concern:
KA No. 066-14052
RECEIVED BY
COMMUNITY & ECONOMi
AF-VELOPMENT DEPARTMENT
JUN A zo15
In accordance with our clients request and authorization, we have performed special testing and
inspection services for the above referenced project. Work was performed on the following permit
numbers:
13 -102842 -00 -MF
13 -102858 -00 -MF
13 -102863 -00 -MF
13 -102867 -00 -MF
13 -102872 -00 -MF
13 -102876 -00 -MF
13 -102895 -00 -MF
13 -102850 -00 -MF
13 -102860 -00 -MF
13 -102864 -00 -MF
13 -102868 -00 -MF
13 -102873 -00 -MF
13 -102877 -00 -MF
13 -102899 -01 -CO
13 -102852 -00 -MF
13 -102861 -00 -MF
13 -102865 -00 -MF
13 -102869 -00 -MF
13-102874-WMF
13 -102892 -00 -MF
13 -102900 -00 -CO
The special inspections involved with this project were:
• Reinforcing Steel
• Cast in Place Concrete
• Proprietary Anchors
• Lateral Framing
13 -102857 -00 -MF
13 -102862 -00 -MF
13 -102866 -00 -MF
13 -102870 -00 -MF
13 -102875 -00 -MF
13 -102893 -00 -MF
• Structural. Steel Welding
To the best of our knowledge, all work has been tested and inspected and has been found to be in general
accordance with the approved plans and specifications, and engineering revisions, and chapter 17 of the
2012 international Building Code. If you have any questions, or if we can be of further assistance, please
do not hesitate to contact our office at (253) 939-2500.
Respecy subnm tied,
C S, INC
William Throne
Puyallup Operations Manager
CC: Heartland Construction
With Offices Serving The Western United States
922 — Valley Avenue NW Suite 101 • Puyallup, WA 98371 • (253) 939-2500 • Fax: (253) 939-2556