13-102876City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003 ILE
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PARK 16 APARTMENTS - BUILDING P
Project Address: 35703 16TH AVE S Bldg P
wilding - M. inti Family
Permit #: 13 -102876 -00 -MF
Inspection Request Line: (253) 835-3050
Parcel Number: 292104 9107
Project Description: NEW - Construction of a new 3 -story, 18 -unit, 21254 square foot multifamily building,
including plumbing and mechanical. Includes 570 square feet of decks.
Owner
ARRlican
Contractor
Lender
PARK 16 LLC
DEVCO INC
HEARTLAND CONSTRUCTION
OWNER IS LENDER
I 1100 MAIN ST SUITE 301
11100 MAIN ST SUITE 301
HEARTCI052Q7 (1/3/16)
21824
BELLEVUE WA 98004
BELLEVUE WA 98004
11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Census Category: 105 - New 5- or More Family Building
Includes:
#1 #2 #3 #4
Occupancy Class:
R-2
Construction Type:
Type V - A
Occupancy Load
Floor Area . ft.
21,254 0 0 0
Additional Permit, Information
New / Additionfl Sq. Feet - 1 st Floor ....................
7198
New / Additional Sq. Feet - 3rd Floor....................7028
New / Additional Sq. Feet - Deck ..........................
570
Number of Stories.................................................3
Plumbing to be Included?.......................................Yes
New / Additional Sq. Feet - Total ..........................
21824
Sensitive Areas? (Wetlands/Slopes, etc)................Yes
New / Additional Sq. Feet - 2nd Floor...................7028
Building Pre -con. Meeting Required?....................Yes
Mechanical to be Included?...................................Yes
Permit for Building Shell Only? .............................No
Special Inspection(s) Required?.............................Yes
Occupancy#1 -Use...............................................Apartment House
Zoning Designation...............................................RM 2400
C JS u�� - '^�'�CONDITIONS: H NALE
Public Works: Prior to Building Final and/or Certificate of Occupancy:
1)The TRACT 3( Agreement for future roadway alignment shall be fully executed and recorded
2)All off-site street improvements shall be completed
Planning: Prior to Certificate of Occupancy
3) Prior to the issuance of a certificate of occupancy for any building on the subject site, all on-site
improvements related to the proposed development must be installed, inspected, and approved by the city.
On-site improvements include, but are not limited to, storm drainage system; utilities; parking stalls and
drive aisles; interior parking lot landscaping; bicycle parking facilities; perimeter landscaping; pedestrian
walkways; common recreational open space and tot lot play areas; minor improvements within wetland
buffer area and associated buffer mitigation; garbage and recycling facilities; and parking lot and pedestrian
area lighting.
4) Prior to issuance of a certificate of occupancy for any residential buildings on the site, a Transportation.
Demand Management (TDM)that addresses how the site managem team will encourage the use of
alternativewinbdes of transportWn shall be submitted to the city for revWand approval.
5) Prior to issuance of certificate of occupancy for any resi*Aift ti` ilding on the subject site, the applicant
shall provide written evidence that a site inspection with thf Q il'64 Federal Way's Crime Prevention Analyst
has been done to ensure that site and building lighting, v'ide'o urvellance, and security fencing limiting access
to the wetland buffer area trail to daylight hours meets minimum Crime Prevention Through Environmental
Design (CPTED) standards for personal safety.
6) Prior to issuance of certificate of occupancy for any residential building on the subject site, the applicant
shall record an affordable housing covenant, that has been approved by the city, that identifies a minimum of
five percent of the residential units (minimum of 15 units) will be affordable for the life of the project to
households earning no more than 50 percent of the median income in King County.
PERMIT EXPIRES Wednesday, November 26, 2014
Permit Issued on Friday, May 30, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date: 5 _ 1--k) — I
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed bye staff.
Tenant Name: PARK 16 APARTMENTS - BUILDING P Permit #: 13 -102876 -00 -MF
Address: 35703 16TH AVE S B1dgP
Includes:
#1 #2 #3 44
Occupancy Class:
R-2
Construction Type:
Type V - A
Occupancy Load
Floor Area (sq. ft.) 1
21,254 1 0 1 0 0
Owner Name: PARK 16 LLC
Owner Address: 11100 MAIN ST SUITE 301
BELLEVUE WA 98004
Building Official
Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most sevedy affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neitherguarantees nor
warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
INSPECTOR AREA AND TYPE Of
Ch
to zZ 14
�S
O -� iz 3
!,�L
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TMAIN ON-SITE
Construction IAlection Record
INSPECTION REQUTS: (253) 835-3050
13 -102876 -00 -MF Address: 35703 16TH AVE S Bldg P
PARK 16 LLC FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Footings/Setback (4110)
❑ Foundation Wall (4115)
E] Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
B S Date L _-�_ `
B SS Date - z. 57--i4By
V4 Date -1
E]
Re -steel (4215)
1:1Approved
Plumbing Groundwork (4190)
Slab/Concrete Floor (4255)
Right of Way —�
Approved
Approved to place concrete or grout
Date
Approved to cover
Approved to place concrete
By
Date - '_
B3t::TT Date - _
By'C� Date t-2_ t� I
Underfloor Framing (4285)
Floor Sheathing (4105)
Shear Walls (4245)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
> (S Date\ kI Q- 4
❑
Roof Sheathing (4220)
Rough Plumbing (4230)
Mechanical Rough -in (4165)
Approved to install roofing
Approved
Approved
Dat ��_
Bye S Date I
B, _�e_ Date �Z rt
1
❑
Prior to scheduling a Fra=Rough-in
Gas Piping (4125)
Approved to release test
Fire/Draft Stops (4095)
Approved
Electrical, Plumbing & Mechire/Draft
Date
B�
Date (Z
\'1 (
Stop inspections mBy
approved. IBC
Framing (4120)
Insulation (4150)
Gypsum Wallboard Nailing (4130)
Approved to insulate
Approved to install wallboard
Approved to install mud & tape
B
C Date 2 `( t
— Date t Z Z 2 1
By Date 3_ Z
Suspended Ceiling Grid (4265)
Final -Fire Department 4 60)
0 Final - Planning
Approved to drop tile
Approved
Approved
By
Date
By
Date
By Date
Final - Public Works (4080)
❑
Final - Mechanical (4065)
® Final - Plumbing (4075)
Approved
Approved
Approved
By
Date
Date 3—��—(
B Date
Final - Building (4050)
Approved
Bq�
��-- Date
Rough Electrical
Approved
1:1Approved
Final Electrical
Right of Way —�
Approved
By
Date
By
Date
By
Date
T C
RECED
•
anal " 2 8 20 3 PERMIT APPLICATION
Federal�Y JUN
CITY OF FEDERAL WAY
CDS
P=w Numm 1 3- 1 0 2 8 7 6- M F zipr DAMS N/A
smAtxD11iM
*
35703 16th Avenue South, Federal Way, WA 98093
�swsjuwr
Building P
FROAM vAL1tAT
S 1( 700,0 0
sera
�u/
2? 9 r� * 1 0 4 9 0 9 f
z 9 2 g 4- 9 1 0 7
TYF3 OF P2313w
® BUILDING ❑ PLumo itoo ❑ MUHAmcAL ❑ Dnwu noN ❑ ENoim& RING ❑ F1Rs Pxcvw 1oN
AAMN OF PROMM
Park 16, Building P
FRO11= DNW1!<IIrri01!<
w Cons 3-s V-A WhIing conWriing 18
Detal7ed desa"ien of woric to
be &u*aW on this perneit only
NAM
rlrerttur tncaxs
PROPsw 1r owxttae
Dominion Boldings, LLC
253-735-2000
>rAtsuroA 35703 16th Avenue South
jessaostfab.com
an
Federal WayWA
owner
an
98093
NASO
Heartland Construction, Inc.
t
425-453-9551
rare Aoal�aa
11100 Main Street, #301
slutx.
tneubauerodevcoa is com
cON72AC OR
CUT
Bellevue
xrmm
WA
ser
98004
sAs
425-453-9566
WA NTATZ CORTltkalO" tietoss 1
ARTCIO52OZ
VATS
12 / 23 / 13
TfONUL RAT sttasao t r
'40-BI—
xAats
snorAltT 9�atrrt
Park 16, LLC
425-453-9551
>rAa.aro A.elvs 11100 Main Street. #301
tneubauerodevcoa ts.com
APMCANT
creT7—&-rm—R-7
Bellevue
WA
ser
98004
TAX
425-453-9566
rAoJZCT CONTACr
xAtas
CPH Consultants(Matt Ho
7110M
425-285-2,390
733 7th Avenue, Suite 100
mattocphconsultantLcom
jl'he induddteal to recahm and
nwpo„d to all sanders,
crrT
Kirkland
ora"
WA
sts
98033
PAs
425-285-2389
concerning"application)
PRCJI= FWANCUO
xA1lxPendin
® Owss"WASMO(currently)
Required vats of $AWO or more
(Rcxr 19.27.0!3)
llAmnto Atenma, arrT, frAT; xt*
trews
I ewtW underpwtwty ey perjury that I ewer tAe props y owner or auther med agent $ the property owner. ! aertb then b the knot
of aw tatatsteey% Ma inftr tatloa sm ntutaet in mrpw t of Mis penult eeypueatieet is blue and owvvmL I wrto that I udn aw opy uftk
aft Ci 4/ I11 regulations p��b wr
l the h authorised AW the iawuanw y a pwma r understand than the
poundt dos nal romwee the names nwp.awWtt lir► ssupnonew ukh tea; stag, or fodwut taes rqutatfwg
owtsbuds" orwbenwiff" taws
I farMw apw to hold haradwav the Cit o/Awden d 1ftW aw to any stales Rnehullag caste, &V&ws , and agsueg jbw insunvil in
by aug psrwet,, iwahWbW the uwdwsyno4 andfiled iled ayaiast Ma aft
taut sty twhse suahy, in *-'&* its o flacrs and seytag-% upa the aeauna * of Ms
inr-ns"MSup~
the ineasryatist end ?777
JUGNATUM "Ts /� 3
rwmm >tAtam Tom Neubauer
Bulletin #100 - laratuy 1, 2013 Paye I of 3 kAHandoutsVen dt Application
GENERAL INFORMATION
CRITIC" ANN" os !nouns
wii— lonsssan
VALUE OFADEMANICAL atm
MECHANICAL PERMIT
Yes
Lakehaven
$
25! Ltoo
Indicate how mmw ofeadL type o"
to be vtatalled or relocated as
this Do not include
to rernavi
AIR HANDLING UNITS
FANS
OAS PIPE OUTLETS
OTHER (Describe)
AIR CONDITIONER
FIREPLACE INSERTS
HOODS (cem..,e;.q
VACUUM BREAKERS
BOILERS
FURNACES
HOT WATER TANKS (ono
COMPRESSORS
GAS LOG SETS
REFRIGERATION SYST
WATER HEATERS (e b.4
DUCTING W►w'17
GAS PIPING
WOODSTOVES
WASHING MACHINES
GENERAL INFORMATION
CRITIC" ANN" os !nouns
wii— lonsssan
VALUE OFPLU11t8M WbRK - --
PLUMBING PERM
Yes
Lakehaven
$
Indicate how nway o each type 09v
to be Installed or rokmated as Part offius Project, Do not veelUde to rernauL
BATHTUBS (.T b/$M. ca.W
LAVS (x.aa &,am
TOILETS
�C WATER FEMO
DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS
MOWERS
VACUUM BREAKERS
DRINKING FOUNTAINS
SINKS p t*./uauy(
WATER HEATERS (e b.4
%
HOSE BUM
SUMPS
WASHING MACHINES
� TOTAL FERTU t 0
GENERAL INFORMATION
CRITIC" ANN" os !nouns
wii— lonsssan
eaanaR ssRtsia=
VALos OF sams0 n rea
Yes
Lakehaven
Lakehaven
8 11000,000
ssannroiras wus ass
LOT stss pe ft-- 7-1
sasaTo o sm( � swrant
neon s eai slwalar sssTaarr
Steel Fabricator
7-2'1 Yb 3
❑ Yes ❑ No
E Yes ❑ No
v AllJU DZSC>ttOPMN stars Ireet D"UpsfO: Gresi(s) Coasto tlos tomos Addiftiond 11110 satdon
In Ik011m 25 v
wn»T�t
CommRCIAL — REMODEL ITENANT IMPROVEMENTS N/A
Air"Cs:tteoottss dot
AMA D�CIItT�?=N ,_ A
�l�s7 �l1st ,ter .�...r�. Additisnal Iabsstats
b
Bulletin #100 — January 1, 2013 Pate 2 of 3 k\HandoutAPemit Application
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 9, 2015
City of Federal Way
Attn: Bldg Dept
33325 8b Ave S.
Federal Way, WA 98003
RE: Final Letter
Park 16 Apartments
16m Avenue S. & S. 3561b Street — Federal Way, Washington
To Whom It May Concern:
KA No. 066-14052
RECEIVED BY
COMMUNITY & ECONOMi
AF-VELOPMENT DEPARTMENT
JUN A zo15
In accordance with our clients request and authorization, we have performed special testing and
inspection services for the above referenced project. Work was performed on the following permit
numbers:
13 -102842 -00 -MF
13 -102858 -00 -MF
13 -102863 -00 -MF
13 -102867 -00 -MF
13 -102872 -00 -MF
13 -102876 -00 -MF
13 -102895 -00 -MF
13 -102850 -00 -MF
13 -102860 -00 -MF
13 -102864 -00 -MF
13 -102868 -00 -MF
13 -102873 -00 -MF
13 -102877 -00 -MF
13 -102899 -01 -CO
13 -102852 -00 -MF
13 -102861 -00 -MF
13 -102865 -00 -MF
13 -102869 -00 -MF
13-102874-WMF
13 -102892 -00 -MF
13 -102900 -00 -CO
The special inspections involved with this project were:
• Reinforcing Steel
• Cast in Place Concrete
• Proprietary Anchors
• Lateral Framing
13 -102857 -00 -MF
13 -102862 -00 -MF
13 -102866 -00 -MF
13 -102870 -00 -MF
13 -102875 -00 -MF
13 -102893 -00 -MF
• Structural. Steel Welding
To the best of our knowledge, all work has been tested and inspected and has been found to be in general
accordance with the approved plans and specifications, and engineering revisions, and chapter 17 of the
2012 international Building Code. If you have any questions, or if we can be of further assistance, please
do not hesitate to contact our office at (253) 939-2500.
Respecy subnm tied,
C S, INC
William Throne
Puyallup Operations Manager
CC: Heartland Construction
With Offices Serving The Western United States
922 — Valley Avenue NW Suite 101 • Puyallup, WA 98371 • (253) 939-2500 • Fax: (253) 939-2556
COMMUNITY & ECONOMIC
• • DEVELOPMENT DEPARTMENT
FEB 17 2015
1- W
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
February 12, 2015
City of Federal Way
Attn: Bldg Dept
33325 8"' Ave S.
Federal Way, WA 98003
RE: Final Letter
Park 16 Apartments (Bldg.'s D, E, F, G, J, K, P)
160i Ave S & S 3560' St.
Federal Way, WA 98003
To Whom It May Concern:
KA No. 066-14052
Permit No. 13 -102857 -00 -MF
13 -102858 -00 -MF
13 -102860 -00 -MF
13 -102861 -00 -MF
13 -102872 -00 -MF
13 -102876 -00 -MF
13 -102873 -00 -MF
In accordance with our clients request and authorization, we have performed special testing and
inspection services for the above referenced project. The special inspections for this project were:
• Reinforcing Steel
• Cast in Place Concrete
• Proprietary Anchors
• Lateral Framing
• Structural Steel Welding
To the best of our knowledge, all work has been tested and inspected and has been found to be in general
accordance with the approved plans and specifications, and engineering revisions, and chapter 17 of the
2012 international Building Code.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our
office at (253) 939-2500.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC
William Throne
Operations Manager
Puyallup
CC: Heartland Construction
With Offices Serving The Western United States
922 — Valley Avenue NW Suite 101 • Puyallup, WA 98371 • (253) 939-2500 • Fax: (253) 939-2556