Loading...
16-101431 • E1et" titia c1 City of Community&Econ.Federal Permit #: 16-101431-00-EL 33325 8th Ave S Federal Way,WA 96003 FILEInspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p q Project Name: VILLAGE AT REDONDO-CLUB HOUSE C Project Address: 28300 18TH AVE S Parcel Number: 894444 0006 Project Description: New 200 amp panel Owner Applicant Contractor VILLAGE AT REDONDO LLC PATTY FULLER FULLER ELECTRIC(ELECTRICAL) 6440 HALEY LOOP RD NE FULLER ELECTRIC INC FULLEEI027BK(1/12/18) BAINBRIDGE ISLAND WA 98110 1220 S 356TH ST SUITE A-5 • 37107 12TH AVE S SUITE A-5 FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Additional Permit Information Electrical Work Valuation 3750 Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps9 No Electrical Fixtures Alt.Serv./Feeder:0 to 200 amps(Is I PERMIT EXPIRES Friday, March 24, 2017 Permit Issued on Thursday, March 24, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington d the City of Federal Way. n OE Owner or agent Date: THIS CARD IS TO t , I ON-SITE "TM • Construction In' ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 16-101431-00-EL Address: 28300 18TH AVE S Project: VILLAGE AT REDONDO LLC FEDERAL WAY, WA 98003-9284 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground(4295) ❑ Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding(4195) 0 Temporary Power(4275) ❑ Service(4235) Approved Approved Approved By Date By Date By t Date 3..31..l to O Feeders/Sub-panels(4045) . ❑ Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date ,,A 1--tio, By Date By Date ❑ Final-Electrical(4055) Approved By Q.14... Date 3-3t--1 b 0 Rough Electrical1:1 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date