Loading...
15-101726 • Mechanical City of Federal wet Permit #: 15 101726 00 ME Community&Econ.Dev.Services 33325 8th Ave S ' Federal Way,WA 98003 L E Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)8353050 Project Name`MATY Project Address: 28546 20TH AVE S Parcel Number: 422200 0200 Project Description: Install NG line for generator Owner Applicant Contractor MICHAEL G MATY JAMIE MERCER LEGACY TELECOMMUNICATIONS INC 28546 20TH AVE S LEGACY TELECOMMUNICATIONS INC (GENERAL) FEDERAL WAY WA 98003-3233 15051 KAY GRESETH AVE SE LEGACTI005KD(6/1/15) OLALLA WA 98359 PO BOX 360 BURLEY WA 98322 Additional Permit Information Is this an Online or O.T.C.application? Yes Mechanical Fixtures Gas Piping 1 Gas Pipe Outlets 1 CONDITIONS: A permanently installed generator is not allowed to be placed within required yards(setbacks). See Bulletin #150 for placement details. PERMIT EXPIRES Tuesday, October 6, 2015 Permit Issued on Thursday,April 9, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent Date: . THIS CARD ISTMAIN ON-SITE - CITY OF Construction In ection Record Federal Way INSPECTION REQ TS: (253)835-3050 PERMIT#: 15-101726-00-ME Address: 28546 20TH AVE S Project: MICHAEL G MATY FEDERAL WAY, WA 98003-3233 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date Byp/ Date -I 5.--i1 T' By PAI,,,, Date 5 -2,8,1 3 ❑ Rough Electrical El Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date