14-104103City of Federal W4y .
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
� FILE
Project Name: SONG KANG SHORT PLAT LOT 3
Project Address: 28623 30TH AVE S
AVuildi ,g,&- Single F2imily
Permit #: 14 -104103 -00 -SF
Inspection Request Line: (253) 835-3050
Parcel Number: 332204 9227
Project Description: NEW - Construction of a 2,969 square foot 2 -story single family residence with a 115
square foot covered porch and a 438 square foot attached garage. Includes plumbing &
mechanical. **5 Bedrooms; $370,000 estimated selling price***
Owner
ApRlican
Contractor
Lender
SOUNDBOLT NORTHWEST LLC
SOUNDBUILT NORTHWEST LLC
SOUNDBUILT NORTHWEST LLC
OWNER IS LENDER
PO BOX 73790
PO BOX 73790
SOUNDNL91 ICL (2/13/15)
PUYALLUP WA 98373
PUYALLUP WA 98373
PO BOX 73790
3522
PUYALLUP WA 98373
Census Category: 101- New Single Family House
Includes:
#1 #2 #3 #4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load
V - B
Floor Areas . ft.
2,969 1 0 0 0
Additional Permit Information
New/ Additional Sq. Feet - 1 st Floor....................1367
New / Additional Sq. Feet - 3rd Floor....................0
New / Additional Sq. Feet - Basement...................0
Occupancy # 1 -Construction Type ........................Type
V - B
New / Additional Sq. Feet - Garage .......................438
Plumbing Work Valuation?....................................8000
New / Additional Sq. Feet - Other ..........................115
New / Additional Sq. Feet - Total ..........................
3522
Zoning Designation...............................................RS 7.2 e\ �--�
New / Additional Sq. Feet - 2nd Floor...................1602
Occupancy #I - Area (Sq. Feet).............................2969
BasicPlan?........................................................... No
New / Additional Sq. Feet - Deck..........................0
Mechanical to be Included?....................................Yes
Occupancy # 1 - Class.............................................R-3
Plumbing to be Included?.......................................Yes
Occupancy # 1 -Use ............................................... Residence (1 or 2
family)
Ducting........................................... 1 Fans................................................ 4 Furnaces......................................... 1
Gas Piping ...................................... 1 Gas Pipe Outlets............................. 3 Hot Water Tanks............................ 1
Plumbing Fixtures'
Bathtubs ......................................... 2 Dishwashers................................... 1 Laundry Washer Outlets............... 1
Lavatories ....................................... 5 Showers.......................................... 1 Sinks...............................................
Water Closets ................................. 3 Hose Bibbs..................................... 2
PERMIT EXPIRES Sunday, March 22, 2015
Permit Issued on Tuesday, September 23, 2014
1 hereby certify t th above i rma is correct and that the construction on the above described property and
the occupant and th use w' be in ac ordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner ora nt: I A Date: q63,h4
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed byChi / staff,
Tenant Name: SONG KANG SHORT PLAT LOT 3
Address: 28623 30TH AVE S
Permit #: 14 -104103 -00 -SF
Includes:
#1 #2 #3 #4
Occupancy Class.
R-3
Construction Type:
Type V - B
Occupancy Load
Floor Area (sq. ft.) 1
2,969 1 0 1 0 0
Owner Name: SOUNDBUILT NORTHWEST LLC
Owner Address: PO BOX 73790
PUYALLUP WA 98373
Building Official Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severly affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor
warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said.structure or the land upon
which itis situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
THIS CARD IS TOrectioft
ON-SITE
CITY
OF r Construction In Record
federal Way INSPECTION REQ3) 835-3050
PERMIT #: 14 -104103 -00 -SF Address: 28623 30TH AVE S
Project: SOUNDBUILT NORTHWEST LLC FEDERAL WAY, WA 98003-7908
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Shear Walls (424
Apprgved to install siding
By// Date///
Mechanical Rough -in (4165)
Approved
B� Date tzA Lo I 14
Interim Erosion Control (4370)
Approved
By Date ,.I
Drainage/Dow
Approved to
By ,,, , e,. _ Date
Underfloor Framing (4285) '
Approved to sheath floor
By Date
Plumbing Groundwork (4190)
Alfproved to c
By
Floor Sheathing (4105)
Approved to install flooring
By Date
Rough Plumbing (4230)
Approved
Bx::5��� Date
Fire/Draft Stops (4095)
Approved
B�S Date ) 2.'t U 1 0 4
Framing (4121
Approved to insulate
By C lam_ Date NZ—I. V i
Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) Final Erosion Control (4375)
Approved to install wallboard Approved to install mud & tape ..AA .. Approved
By Date ,1 ` By �p.1, Date (L . (a 1 By rV�� Date Z _ 60`'s....
Final - Mechanical (4065) Final - Plumbing (4075) Final - Building (4050)
Approved Approved Approved
By PptL Date a - t,� �(� By ��Ir1i Date L �(�j -�� By Y4� t Date
El
SWM Precon Site Mtg (4400)
Initial Erosion Control (4365)
By
ootin s/Setback (4110)
Approved
By
To be done prior to breaking ground
Appr d to place concrete
By
Date
By
Date
B
Datelj l
Shear Walls (424
Apprgved to install siding
By// Date///
Mechanical Rough -in (4165)
Approved
B� Date tzA Lo I 14
Interim Erosion Control (4370)
Approved
By Date ,.I
Drainage/Dow
Approved to
By ,,, , e,. _ Date
Underfloor Framing (4285) '
Approved to sheath floor
By Date
Plumbing Groundwork (4190)
Alfproved to c
By
Floor Sheathing (4105)
Approved to install flooring
By Date
Rough Plumbing (4230)
Approved
Bx::5��� Date
Fire/Draft Stops (4095)
Approved
B�S Date ) 2.'t U 1 0 4
Framing (4121
Approved to insulate
By C lam_ Date NZ—I. V i
Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) Final Erosion Control (4375)
Approved to install wallboard Approved to install mud & tape ..AA .. Approved
By Date ,1 ` By �p.1, Date (L . (a 1 By rV�� Date Z _ 60`'s....
Final - Mechanical (4065) Final - Plumbing (4075) Final - Building (4050)
Approved Approved Approved
By PptL Date a - t,� �(� By ��Ir1i Date L �(�j -�� By Y4� t Date
El
Foundation (4115)
Approved to place concrete
By
Date
Right of Way
Approved
By
Slab/Concrete Floor (4255)
Approved to place concrete
By
Date
Shear Walls (424
Apprgved to install siding
By// Date///
Mechanical Rough -in (4165)
Approved
B� Date tzA Lo I 14
Interim Erosion Control (4370)
Approved
By Date ,.I
Drainage/Dow
Approved to
By ,,, , e,. _ Date
Underfloor Framing (4285) '
Approved to sheath floor
By Date
Plumbing Groundwork (4190)
Alfproved to c
By
Floor Sheathing (4105)
Approved to install flooring
By Date
Rough Plumbing (4230)
Approved
Bx::5��� Date
Fire/Draft Stops (4095)
Approved
B�S Date ) 2.'t U 1 0 4
Framing (4121
Approved to insulate
By C lam_ Date NZ—I. V i
Insulation (4150) ❑ Gypsum Wallboard Nailing (4130) Final Erosion Control (4375)
Approved to install wallboard Approved to install mud & tape ..AA .. Approved
By Date ,1 ` By �p.1, Date (L . (a 1 By rV�� Date Z _ 60`'s....
Final - Mechanical (4065) Final - Plumbing (4075) Final - Building (4050)
Approved Approved Approved
By PptL Date a - t,� �(� By ��Ir1i Date L �(�j -�� By Y4� t Date
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
VED
Federal Way
PERMIT NUMBER
PERMIT&PPLICATION
AY
C OF FEDERAL W
TARGET DATE �:
A2 iz !/
SITE ADDRESS ���jjj SD
y7�1 Q
,-
SUITE/UNIT #
PROJECT VALUATION
ZONI
F
ASSESSOR'S TAX/PARCEL #
t
TYPE OF PERMIT
.k<UILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
-
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
PROPERTY OWNER
N I PRIMARY PHONE
�tJ, 1AX, 1
NG SS MAIL
CI
STA k
ZIP
I {•Y ►"1C
NAME J PHONE
MAILING ADDRESS E-MAIL
CONTRACTOR
CITY
STATE
ZIP FAX
VWSTATE CON RACT 'S LIQ #
G
ZiTaTION DATE FEDERAL WAY BUSINESS LICENSE #
NAME PRIMARY PHONE
APPLICANT
MAILING ADDRESS E-MAIL
CITY
STATE
ZIP FAX
PROJECT CONTACT
NAME
Y'^ � p P
, t
(The individual to receive and
respond to all correspondence
G AD S MAI
—11J010 AIN � 1
CI^
ZIP ` F
-5x!6-63 i g
concerning this application)
PROJECT FINANCING
NAME j I OWNER -FINANCED
Required value of $5,000 or more
(RCW 19.27.095)
MAILING ADDRESS, CITY, STATE, ZIP PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. 1 certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such laim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplie t the city asp part oft is application.
SIGNATURE: DATE
PRINT NAME:
Bulletin #100 — January 1, 2013 Page 1 of 3 k:\Handouts\Pemrit Application
•
.1
' VALUE OF MECHANICAL WORK
MECHANICAL PERMIT $
Indicate how many of each type o re to be installed or relocated as part of this project. Do not include existing res to remain.
AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe)
AIR CONDITIONER FIREPLACE INSERTS HOODS (commercial)
BOILERS FURNACES HOT WATER TANKS (Gas)
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
DUCTING GAS PIPING WOODSTOVES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
VALUE OF PLUMBING WORK
PLUMBING PERMIT
�,
EXISTING/PREVIOUS USE
LOT SIZE (In Square Feet)
$
,fadicate how many of each kilpe of
ftx4jre to be installed or relocated as
part of this project. Do not include existirkq fixtures to remain.
BATHTUBS (or Tub/Shower combo)
LAVS (Hand Sinks)
TOILETS
WATER PIPING
DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS
SHOWERS
VACUUM BREAKERS
DRINKING FOUNTAINS
_L SINKS (Kitchen/utility)
WATER HEATERS (Electric)
HOSE BIBBS
SUMPS
WASHING MACHINES
TOTAL FIXTURES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
SEWER P�UjR/VEYOlR�/
VALUE OF EXISTING IMPROVEMENTS
�,
EXISTING/PREVIOUS USE
LOT SIZE (In Square Feet)
EXISTING FIRE SPRINKLER SYSTEM?
PROPOSED FIRE SUPPRESSION SYSTEM?
e h to�
141 )-,
❑ Yes y- No
❑ Yes k No
Bulletin #100 — January 1, 2013 Page 2 of 3 k:\Handouts\Permit Application
say
40 U-1
t"F"z 6 83S
90 oe—r—, 0,7
C4
—=-- — — — _-------
I------- — — —
3,9V8
vo
Cl) V 01
— — — — — — — — — — — — — — — —
—,LO SL
C 10-1
E)PJV>i E)NOS.
VIGO-6EG (CS;2) tXVJ
0280-848 (C92) rHd
CLE86 VM fdn'11Wnd
06LEL X09 .11'd
':)NI 'S:;WOH
i"linal Nnos
jw
C7 06- Cd 0
0,18 iT/GT/60 Zd
OZ -90-868 :V-73ONV
5--4NI IJVlNOJ
LZZ6t7OZEE #13DUVd
NOUValli-INI 01
T0086 V/%A'/,eM leJaPad
03NIIIH011 39 01 sinodsNmoo -iooa pv 'o
*a0133dSNI A110 AGJ6PZ
=J7; L-01
410E EZ98Z
kJ-NnoD ONIN
(73AOaddV SV 0311VISNI 38 01 3ON3-4 ITS Z 'J's 9t,9j =IVIOI
'03M80M 9N/3e ION N3HA4
'J'S 5h4=>1VM301S
-V
AVAA Wd�109=1
c3Hoinw 38 iiw sws o3socjx-3 ?iv *i
1�0
�v
'J's lc=-qooa
:S31ON
v3av snozAN dpvi
90 oe—r—, 0,7
C4
—=-- — — — _-------
I------- — — —
3,9V8
vo
Cl) V 01
— — — — — — — — — — — — — — — —
—,LO SL
C 10-1
E)PJV>i E)NOS.
VIGO-6EG (CS;2) tXVJ
0280-848 (C92) rHd
CLE86 VM fdn'11Wnd
06LEL X09 .11'd
':)NI 'S:;WOH
i"linal Nnos
jw