Loading...
12-101384 • • 3uilding - Cr mmercial Community&f Econ.City32FederalDev.Services Permit #: 12-101384-00-CO 33325 8th Ave S Federal Way,WA 98003 fE :7NInspection Request Line: (253) 835-3050 'h:(253)835-2607 Fax:(253)835-2609 fra -� pecq Project Name: COMMUNITY GARDEN AT TRUMAN HIGH SCHOOL Project Address: 31455 28TH AVE S Parcel Number: 092104 9054 Project Description: ADD-Construction of approximately 196 square foot storage/tool shed. Owner Applicant Contractor Lender FEDERAL WAY COMMUNITY FEDERAL WAY COMMUNITY OWNER IS CONTRACTOR GARDENS FOUNDATION GARDENS FOUNDATION 32135 32ND AVE SW 32135 32ND AVE SW FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 i Census Category: 437 - Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: • U Construction Type: Occupancy Load: Floor Area(sq.ft.) 196 0 0 0 Additional Permit Information Mechanical to be Included? No Number of Stories 1 New/Additional Sq.Feet-Other 196 Permit for Building Shell Only? No Plumbing to be Included? No New/Additional Sq.Feet-Total 196 Occupancy#1 -Use Sheds Zoning Designation CC-F No Fixtures Associated With This Permit !! CONDITIONS: Subject to field inspection with plans. PERMIT EXPIRES Wednesday, October 10, 2012 Permit Issued on Friday, April 13, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and, he City of Federal Way. ., . .. Owner or agent: Date: _ / -- 20/2- RA10100122/2_ 4.15A3 1�r • THIS CARD IS TO .,MAIN ON-SITE CITY OF �� "^° b"j6 Federal WayConstructlon In ection Record INSPECTION REQUE TS: (253) 835-3050 PERMIT#: 12-101384-00-CO Address: 31455 28TH AVE S Project: FEDERAL WAY COMMUNITY GARI FEDERAL WAY, WA 98003-5003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El SWM Precon Site Mtg(4400) El Initial Erosion Control (4365) Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By M Date 7�2d 12'- By iti,e5 Date 7..--.7,-70._ By r'e'f Date & =/(-3 ❑ Foundation Wall(4115) El Drainage/Downspout(4040) 'El Re-steel(4215) Approved to place concrete Approved to backfill Approved to place concrete or grout By Date By Date By Date • o Slab/Concrete Floor(4255) 'El Underfloor Framing(4285) ElFloor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By DateBy (1 Date 6_(t-2,767,, By Date LI Shear Walls (4245) ❑ Roof Sheathing(4220) LI Fire/Draft Stops(4095) Approved to install siding Approved to install roofing Approved By `�if� Date 1°-2 c//Z By Date 1p •2_,./. (Z By Date • ❑ Interim Erosion Control(4370) Framing(4120) Prior to scheduling a Framing inspection; Approved Electrical,Plumbing&Mechanical Rough-in and Approved to insulate Fire/Draft Stop inspections must be signed-off and By 7)0 Date /Q.5D /Z approved. IBC 109.3.4 By /j Date '?-5:/> ElInsulation (4150) '❑Gypsum Wallboard Nailing(4130) ❑ Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud&tape Approved to drop tile By Date By Date By Date '❑ Final-Fire Department(4060) 0 Final-Planning 'ID Final Erosion Control(4375) Approved Approved Approved By Date By Date By Date • 'LI Final-Building(4050) Approved By /,%/—':--- Date /3 El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date "e„,,V arr ov \r� a Feder 11ERMIT St1ME COP LICATION PT 253-835-2607.FAR 253-835-2 � ,�, OF*�atr v5 SITE ADDRESS��� SUITE/UNIT# 3 /1-75S- 2$ 7771 svc.J. PROJECT VALUATION ZONING ASSESSOR'S TA t/PARCEL# 3Dav �-- F Q 0 a t C _ aj 0 5 TYPE OF PERMIT CL'-BUILDING ElPLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT (Tenant Name/Homeowner Last Name) Tr/ , , K roV � �� PROJECT DESCRIPTION oma` G`!, FO CC/y� L ,t:� �j /ire'?&Af Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER Cg.ff G- C.t i'7' `'J I c./C S C ht )OGS 2 3 9v6--2,000 MAILING ADDRESS E-MAIL 3 j 3 c? 2f v7+4 ve 50u7 w,PwRs 044 CITY STATE ZIP Fer 6-Ye/)L e.,t_t e W14- 9 2c)(:) NAME ' PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# NAME #`":70 477.,c.I PHONE Fcc7e (A-J Ay OA ge ax,s ;253 -279-C yy 3 APPLICANT MAILING ADDRESS E-MAIL /�•o. gvx �2Yv'iZ CITYSTATE ZIP FAX r� � CITY "' W,' 9sd93 PROJECT CONTACT NAME PHONE (The individual to receive and 141 /CH4&Z 5 A L Ey .253 -279-G, 9 93 MAILING ADDRESS E-MAIL respond to all correspondence N® t!S/�+�%. concerning this application) 3;2/3c 3 5' o'• `N/C li Ae2._5 i4„,cyy CITY STATE ZIP FAX re),e7zdz. u.4--r u%q 9go--3 ALTERNATE CONTACT NAME: PHONE E-MAIL PROJECT FINANCING NAME111 OWNER-FINANCED Required value of$5,000 or more (RCW 19.27.095) MAILING ADDRESS,CITY,STATE,ZIP PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. �J SIGNATURE: 1C;� e DATE � ( 'lid I Z PRINT NAME: 01a C/'I 422 57 . 'Y Bulletin#100—January 1,2011 Page 1 of 3 k:ANandouts\Permit Application • • MECHANICAL FIXTURES VALUE OF MECHANICAL WORK $_ _ (a copy of bid or estimate must be provided) Indicate how many of e. h type of fixture to be installed or relocated as part of this project. Do nqt include existing fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(comm BOILERS FURNACES HOT • R TANKS(Gas) COMPRESSORS LOG SETS RIGERATION SYST DUCTING GAS PI• WOODSTOVES , R.' � s r;�,-0a � ` •i _„,-.- ': °C mss`, Indicate how many of each type of fixture to •- installed or relocated as pa • this project. Do not include existing fixtures to remain. BATHTUBS(or Tub/Shower Combo) LAVS(Rand Sinks) TOI WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAK• ' DRINKING FO • AINS SINKS(Ki«hen/utilin) WATER HEATERS(Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL 1NEOR a SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS CRITICAL AREAS ON PROPERTY? 1 WATER PURVEYOR EXISTING/Pli(JIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRIN ER SYSTEM? PROPOSED FIRE SUP ESS N SYSTEM? ❑Yes No Yes • RESCbE w OR' ` AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE FIRST FLOOR(or Mobile Home) ,,Sge9ND FLOOR COVERED ENTRY DECK GARAGE LI CARPORT O OTHER(describe) - 4,- _. EXISTING PROPOSED TOTAL Area Totals »"NEW HOMES ONLY*' ESTIMATED SELLING PRICE$ # OF BEDROOMS _ ?r �E't`€'/DD1T AREA DESCRIPTION Area Occupancy Group(s) Construction # of Additional Information in S.uare Feet Type Stories ADDITION COMMERCIAL-RE1IODEI./TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(s) Construction # of I Additional Information in Square Feet Type Stories 1„TOT NG — --- TENANT AREA ONLY 1111*, ' < s p ClNLY Bulletin#100—January 1,2011 Page 2 of 3 k:\Handouts\Permit Application