Loading...
13-100554 • , • •uilding - M;ilti Family City of FederalWay Community Econ.& Dev.Services Permit #: 13-100554-00-MF 33325 8th Ave S Federal Way,WA 98003 25 Inspection RequestLine: Ph:(253)835-2607 Fax:(253)835-2609 p ( 3)835-3050 1 \s—e Project Name: FEDERAL WAY TOWNHOMES-BUILDING, Project Address: 31408 28TH AVE S BLDGA Parcel Number: 092104 9142 Project Description: NEW-Construction of a 9,016 square foot 7-unit townhouse building with 3,934 square feet of garage space. Includes plumbing& mechanical. Owner Applicant Contractor Lender BIKRAM-ONE LLC EDI LINARDIC GENERATION CONSTRUCTION OWNER IS LENDER 1932 S 320TH CT LDG ARCHITECTS GENERCL977MB(8/19/15) FEDERAL WAY WA 98003 1319 DEXTER AVE SUITE 245 202 FRONTAGE RD N SEATTLE WA 98109 PACIFIC WA 98047 . Census Category: 105 -New 5- or More Family Building Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq. ft.) 12,950 0 0 0 Additional Permit Information New/Additional Sq.Feet- 1st Floor 322 New/Additional Sq.Feet-2nd Floor 4466 New/Additional Sq.Feet-3rd Floor 4228 Existing Sprinkler System in Building? Yes New/Additional Sq.Feet-Garage 3934 Mechanical to be Included? Yes Number of Stories. 3 Permit for Building Shell Only? No Plumbing to be Included? Yes New/Additional Sq.Feet-Total 12950 Occupancy#1 -Use Residence(1 or 2 Zoning Designation RM 2400 family) Mechanical Fixtures Ducting 1 Fans 39 Fireplace Inserts 7 Furnaces 7 Gas Pipe Outlets 7 Plumbing Fixtures Bathtubs 18 Dishwashers 7 Laundry Washer Outlets 7 Lavatories 24 Sinks 7 Water Closets 24 Water Heaters 7 Hose Bibbs 7 CONDITIONS: Prior to commencing with any construction activities,a pre-construction meeting-must be held with Public Works.Contact Kevin Peterson at(253)835-2734 to schedule the meeting. Prior to Building Final and/or C.of 0.,a street lighting plan shall be submitted to Public Works for review and approval.All street lights shall be installed and operational prior to C.of O.or building final. Prior to Building Final and/or C.of O.all street frontage improvements shall be complete and accepted by the PW inspector. Prior to Building Final and/or C.of O.,9.00 feet of property shall be dedicated to the City for right of way along 28th Ave S. Fire spriniker system required. Prior to Building C.of O.landscape inspection is required. Contact Becky Chapin at 253-835-2641 once landscaping has been installed for building 3.A final landscape inpection will be required once all units are built,see Building 1 plan set for proved landscape plans. • PERMIT EXPIRES Saturday, February 15, 2014 Permit Issued on Monday, August 19, 2013 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: 6 'Z'"f City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: FEDERAL WAY TOWNHOMES - BUILDING 1 Permit#: 13-100554-00-MF Address: 31408 28TH AVE S BLDG1 Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq. ft.) 12,950 0 0 0 Owner Name: BIKRAM-ONE LLC Owner Address: 1932 S 320TH CT FEDERAL WAY WA 98003 L `l � , _ Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severly affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. DATE INSPECTOR AREA AND TYPE 0 VSPECTION \\ , x61.-1'3 11 ''-t a ... v� \k 1 ' -> L ia.-.- -a � r t —\\-1 5- i.t -\L ci : t� �r \\y :>1ne6-v' 5- b t Cil W aAg 0%.*a c'�.a INC [ 2:3 I . +i&i L€ - P4141 WO S 2ha J r� L-A, l 1 M ie c Yl A..22 • THIS CARD IS T .MAIN ON-SITE Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-100554-00-MF Address: 31408 28TH AVE S BLDG 1 Project: BIKRAM-ONE LLC FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ID Footings/Setback(4110) El Foundation Wall(4115) El Drainage/Downspout(4040) Approved to place concrete Approved to place concrete Approved to backfill By LA- Date \ v I y- 'By --Date ' ' 1-- 1k By Date •0 Re-steel(4215) ❑ Plumbing Groundwork(4190) El Slab/Concrete Floor(4255) Approved to place concrete or grout Approved to cover Approved to place concrete By C_ . Date 1 a , By - Date 1�,` By j Date` 3�� rDate❑ Underfloor Framing(4285) Floor Sheathing(4105) Shear Walls(4245) Approved to sheath floor Approved to install flooring Approved to install siding By By Date y;S�� t By 0._ 1_ Date q At Roof Sheathing(4220) E3Rough Plumbing(4230) *❑ Mechanical Rough-in(4165) Approved to install roofing Approved Approved By \_-\\t _ Date • By Date `By Date Gas Piping 4125 ❑ Fire/Draft Stops(4095El )g ) ( P ( ) Prior to scheduling a Framing inspection; Approved to release test Approved Electrical,Plumbing&Mechanical Rough-in and Fire/Draft Stop inspections must be signed-off and By Date By C Date l n—ls 1 1 - k approved. IBC 109.3.4 El Framing(4120) E3 Insulation(4150) ypypsum Wallboard Nailing(4130) Approved to insulate Approved to install wallboard Approved to install mud&tape B Date 1 ,1 `` By %..� Date LC.v u--14 By 0 �� Date Y t1-11-) 1-1 Suspended Ceiling Grid (4265) 'El Final-Fire Department(4060) Final-Planning Approved to drop tile Approved By rDate By Date By Date Final-Public Works(4080) 0 Final-Mechanical(4065) El Final-Plumbing(4075) Approved Approved Approved By Date By ,, , Date > 1 By Date Final-Building(4050) Approved By Date ‘__.1 .1,__, .S D Rough Electrical Final Electrical Right of Way Approved Approved Approved 1 y Date By Date By Date • • ai U C . N Pin :*-03_ fel .^ HI o v Ct 0 atO coCZ \ 6 °; v ciao a w c U III A ° a ›.4 oU O;.4 O I4 ^ ""C2 O ICti .r U 7, CA tit Liz 'W C z n ,°. U po -O 7-CCI V ,Ci C.... c'9,� a) O (:Iii) S ,,t g cu cn (111111) '''' y d � N 3'', F ' ILL)...) C a Qrvv..)' Y A C ..Th.,:g..iv) en Ccl a) Vc� cn C4 ' ,.4 L, ;ii CLq C a> C4 ›.1 '''''" -A ct3 a3 E ,:i, EE o Q O N"~ avb Ucp < r, O vccqj Ell* H .17:3' _ U Cies) Cl3 -C3 ci_ cu REoIVED CITY Of FEB 06 2013 PERMI APPLICATION Federal Way CITY OF FEDERAL WAY CDS PERMIT NUMBER 3 _ , ^" _ / 0 5 5 — TARGET DATE `' ' SITE ADDRESS SUITE/UNIT# 31408 28TH AVE S — BUILDING ONE PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $ 9180, 000 RM 09 2 1 0 4 — 9 1 4 2 TYPE OF PERMIT /I BUILDING N PLUMBING 11 MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION -I NAME OF PROJECT FEDERAL WAY TOWN HOMES — BUILDING ONE NEW THREE STORY RESIDENTIAL TOWNHOMES — 7 UNITS PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER BIKRAM—ONE LLC : ATTN RAVI MAILING SE 320TH CT E-MAIL CMDERAL WAY ST E 9 18 0 0 3 NAME WH PHONE TBD MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# / / NAME PRIMARY PHONE LDG ARCHITECTS — EDI LINARDIC APPLICANT MAILING ADDRESS E-MAIL 1319 DEXTER AVE NO #245 CITY STATE ZIP FAX SEATTLE WA 98109 NAME PRIMARY PHONE PROJECT CONTACT EDI L I NARD I C 206 284 4764 (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence 1319 DEXTER AVE NO #245 ED@LDGARCHITECTS .COM concerning this application) CITY STATE ZIP FAX SEATTLE WA 98109 NAME PROJECT FINANCING a OWNER-FINANCED Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to id harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in the investigation an '.efense of such claim), which may be made by any person,including the undersigned,and filed against the city, but only where su-J claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information suppl, to the city as a part of this application. SIGNATURE: ' /{ DATE —�"1.--& PRINT NAME: C..-"114414"...- b? l X14' j)I (.14.-2L4( L" Bulletin#100—January 1,2013 Page 1 of 3 k:AHandouts\Permit Application • VALUE OF MECHANICAL WORK MECAANICAL PERMIT 70, 000 Indicate how many of each type offixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS FANS / GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER —r FIREPLACE INSERTS HOODS(commercial( BOILERS 7 FURNACES HOT WATER TANKS(Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ 105, 000 Jndicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. 1 R BATHTUBS(or Tub/Shower combo) 3 2 LAYS(Hand Sinks) 2 4 TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS 7 SINKS(Kitchen/Utility) 7 WATER HEATERS(Electric( 7 HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS LAKEHAVEN LAKEHAVEN ,b 500, 000 EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? VACANT 91, 167 ❑Yes o No Yes o No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) 3 2 2 SECOND FLOOR 4466 COVERED ENTRY DECK GARAGE Pi CARPORT 0 3 9 3 4 OTHER(describe) THIRD FLR 4228 EXISTING PROPOSED TOTAL Area Totals 12 , 950 **NEW HOMES o1VLY** ESTIMATED SELLING PRICE$ 140, 000 #OF BEDROOMS 2-3 COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet Type Stories NEW BUILDING ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet Type Stories TOTAL BUILDING TENANT AREA ONLY PROJECT AREAONLY Bulletin#100-January 1,2013 Page 2 of 3 k:AHandouts\Permit Application