Loading...
16-101455 Electrical CityCommunity o,Federal way Permit #: 16-10145500-EL= Community&Econ.Dev.Services 33325 8th Ave S Federal Way,WA 98003 Request Inspection Re t Line: 253 Ph:(253)835-2607 Fax:(253)835-2609 P q 835-3050 Project Name: STATE FARM INSURANC LE Project Address: 32001 32ND AVE S Unit 305 Parcel Number: 215465 0010 Project Description: INSTALL(2)LOW VOLTAGE T-STATS Owner Applicant Contractor STERLING REALTY ORG DARLA DOLL MACDONALD MILLER FAC SOL INC 600 106TH AVE NE SUITE 200 MACDONALD MILLER FAC SOL INC (ELECTRICAL) BELLEVUE WA 98004 (ELECTRICAL) • MACDOMF972BF(1/6/17) 7717 DETROIT AVE SW 7717 DETROIT AVE SW SEATTLE WA 98198 SEATTLE WA 98106 Additional Permit Information Electrical Work Valuation 800.00 Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Thermostat. 2 PERMIT EXPIRES Friday, March 24, 2017 Permit Issued on Thursday, March 24, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington d t 'ty eral Way. Owner or agent: Date: . I THIS CARD IS TO MAIN ON-SITE arrcn C• o In ection Record Federal Way INSPECTION REQU TS: (253)835-3050 PERMIT#: 16-101455-00-EL Address: 32001 32ND AVE S Unit 305 Project: STERLING REALTY ORG FEDERAL WAY, WA 98001 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground (4295) ❑ Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding(4195) El Temporary Power(4275) ❑ Service(4235) Approved Approved Approved By Date By Date By Date . .❑ Feeders/Sub-panels(4045) 0 Rough Electrical(4225) 0 Ceiling Cover(4020) Approved Approved Approved By Date By Date By ,L Date .. _2 8-1 4 ❑ Final-Electrical(4055) Approved Bycs—vN.... Date _2 .0.F . El Rough ElectricalEl Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date