14-105708 • `1Vlehanical
City of Federal Way w
Community&Econ.Dev.Services Permit #: 14-105708-00-M E
333258th Ave S
W
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609 Flia. p G
Project Name: CHASTAIN
Project Address: 32849 38TH AVE S Parcel Number: 614360 0070
Project Description: Install ductless heat pump system
Owner Applicant Contractor
JAMES A CHASTAIN ASHLEY BOUCK GREENWOOD HEATING(GENERAL)
JANE E CHASTAIN GREENWOOD HEATING AND A/C GREENHA922U7(2/03/15)
32849 38TH AVE S 825 S STACY ST 825 S STACY ST
EDERAL WAY WA 98001-9665 SEATTLE WA 98134 SEATTLE WA 98134
Additional Permit Information
Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Compressors/Heat Pumps 1
PERMIT EXPIRES Saturday, May 2, 2015
Permit Issued on Monday, November 3, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
R
THIS CARD IS TO ON-SITE
CITY •OF
' Construction In ction Record
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 14-105708-00-ME Address: 32849 38TH AVE S
Project: JAMES A CHASTAIN FEDERAL WAY, WA 98001-9665
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) El Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test / Approved ���
By Date By Date By �f°A Date���l �-
•
El Rough ElectricalCI Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date