13-102628 a
Y ,
• Electrical
Community&Econ of DevvaSFILE
ervices Permit #: 13-102628-00-EL
33325 8th Ave S
Federal way,Fax
Request
Ph:(253)835-2607 Fax:(253)835-2609Inspection Line: (253)835-3050
Project Name: PACKNETT III ',70`1545
Project Address: 32844 38TH AVE S Parcel Number: 614360 0550
Project Description: Adding/altering(2)circuits to repair existing septic system
,
Owner Applicant Contractor
MARVIN A PACKNETT NORM MCDONALD ALL STAR ELECTRIC
32844 38TH AVE S ALL STAR ELECTRIC ALLSTE*243B2(1/31/14)
FEDERAL WAY WA 98001-9664 11103 50TH AVE E 11103 50TH AVE E
TACOMA WA 98446 TACOMA WA 98446
Additional Permit information
Is this an Online or O.T.C.application Yes Is Use Educational or Institutional? Yes
Electrical Fixtures
Circuits-Residential 2
CONDITIONS:
Inspection approval is required prior to covering or concealing any portion of the septic electrical system,
including the pump. New septic&effluent tanks containing electrical wires and equipment MUST be
inspection and approved PRIOR to being loaded with sewage. (Per 296-46B-501-001(b)(7)WAC)
PERMIT EXPIRES Wednesday, June 17, 2015
Permit Issued on Monday, June 17, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent •
Date:
0NL.INE
- -. ,,,,--,,_o_,,
THIS CARD IS TO : , I ON-SITE • ,
CITY OF •
Construction In . •ction Record
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 13-102628-00-EL Address: 32844 38TH AVE S
Project: MARVIN A PACKNETT FEDERAL WAY, WA 98001-9664
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ UFER Ground (4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
. • •
O Pool Bonding(4195) 0 Temporary Power(4275) ❑ Service(4235)
Approved Approved Approved
By Date By Date By Date
❑ Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) ❑ Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
O Final-Electrical(4055)
//��,, Approved
By _RAS Date ( ..._94-(5
Rough Electrical Final Electrical Right of Way
❑ Approved ElApproved ElApproved
By Date By Date By Date