Loading...
11-101350 0 • Mechanical,City of Federal Way , Community Development Services Permit #: 11-101350-00-M E P.O.Box 9718 FILE Federal Way,WA 98063-9718 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253) 8355-3050 Project Name: ROBBINS Vettl4 Project Address: 2505 S 284TH ST Parcel Number: 332204 9215 Project Description: Replace furnace like to like Owner Applicant Contractor MARK ROBBINS DEREK BRAZINSKAS CODE MECHANICAL INC 2505 S 284TH ST CODE MECHANICAL INC CODEMI*932KQ(5/18/11) FEDERAL WAY WA 98003 26319 149TH ST E 26319 149TH ST E BUCKLEY WA 98321 BUCKLEY WA 98321 • .. ,.: r44,',: 4g-:11,,,i 'iIfoay id6. ',t . '---,'‘,:i-,ti � a Mechanical Valuation 3000 Is this an Online or O.T.C.application? Yes a .,2,,".. .. ,w...,. '�Te,o .. , . � .,.,'e`er.. `t? e, o. 'a 1-kou'< 4 :v,,,4,. Furnaces 1 PERMIT EXPIRES Saturday, October 8, 2011 Permit Issued on Monday, April 11, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 014 K Date: il (11 FIN4LF":) 4/(4/ II THIS CARD IS TO REMAIN ON-SITE , CITY OF 0 Construction I ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 11-101350-00-ME Address: 2505 S 284TH ST Project: MARK ROBBINS FEDERAL WAY, WA 98003-3312 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date24-4Cr --- Dats,4—S- i/ FILE 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date