Loading...
15-101962 • Electrical City ofEFederal.D Way FILEPermit 15-1O1962-00-EL Community 8 Econ.Dev.Services #: 33325 8th Ave S Federal Way,WA 98003 Inspection Request Ph:(253)835-2607 Fax:(253)835-2609 pe q est Line: (253)835-3050 Project Name: TRIPP Project Address: 2380 S 284TH CT Parcel Number: 326081 0150 Project Description: Installing A/C and Gas Furnace • Owner Applicant Contractor NEAL TRIPP JAIMIE HOW BRENNAN HEATING&A/C LLC RUTH E TRIPP BRENNAN HEATING&A/C (ELECTRICAL) 2380 S 284TH CT 4601 S 134TH PL BRENNHA962DU(3/31/16) FEDERAL WAY WA 98003 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit information' Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Electrical Fixtures Circuits-Residential 2 Thermostat. 1 PERMIT EXPIRES Monday, October 19, 2015 Permit Issued on Wednesday,April 22, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLII\IE Date: 1 JtiJ 0 •.. 40,1&, THIN CARD IS T MAIN ON-SITE CITY OF Construction I ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 15-101962-00-EL Address: 2380 S 284TH CT Project: NEAL TRIPP FEDERAL WAY, WA 98003-2975 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground(4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding(4195) '0 Temporary Power(4275) '0 Service(4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels(4045) 0 Rough Electrical(4225) 0 Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date Final-Electrical(4055) Approved By Date Vi .b —1' 0 Rough Electrical El Final Electrical Right of Way Approved Approved Approved By Date By Date By Date