Loading...
10-104487 Electricfil City of Federal Way Community Development Services Permit #: 10-104487-00-EL P.O.Box 90 98063-9718 8 Federal Way,WA 98063 Inspection Request Line: (2 53)(253)835-2607 Fax:(253)835-2609 p q 835-3050 Project Name: THE VILLAGE AT REDONDO,BUILDING J202 Project Address: 1848 S 284TH LN UNIT J202 Parcel Number: 894444 0960 Project Description: Adding/altering(3)existing circuits in kitchen Owner Applicant Contractor VILLAGE AT REDONDO LLC 010584 GREGG BILLINGS BILLINGS ELECTRIC 290 MADISON AVE N SUITE 440 BILLINGS ELECTRIC BILLIE*066QA (11/01/12) BAINBRIDGE ISLAND WA 98110 PO BOX 681 PO BOX 681 SUMNER WA 98390 SUMNER WA 98390 ire ell' 060 a Is Use Educational or Institutional? No .. . _. ..a Circuits-Residential 3 PERMIT EXPIRES Saturday, October 22, 2011 Permit Issued on Friday, October 22, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the •ty of Federal Way. Owner or agent: (44111k1 Date: IC/Ile/it" SILv-og0 I V THIS CARD IS TO REMAIN ON-SITE crry of - • Construction Ins !ction Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 10-104487-00-EL Address: 1848 S 284TH LN UNIT J202 Project: VILLAGE AT REDONDO LLC 0105E FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. o UFER Ground (4295) 0 Ditch cover(4030) ❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date o Pool Bonding(4195) ❑ Temporary Power(4275) ❑ Service(4235) Approved Approved Approved By Date By Date By Date . 0 Feeders/Sub-panels(4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover(4020) Approved Approved Approved By Date By 649.0) Date / .2.5 .4 By Date E Final-Electrical(4055) Approved By(1,40-.../.i Date L `. --15-1. t7 FILE ❑ Rough Electrical El Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date