Loading...
11-100018 t414 N l Building - Multi F arnily City of Federal Way Community Development Services Permit #: 11-100018-00-MF P.O.Box 9718 Federal Way,WA 98063-9718 Inspection Request Line: (253)835-3050 Ph.(253)835-2607 Fax:(253)835-2609 P q if I L.E Project Name: WESTBORO APARTMENTS-BLDG 28 UNITS B & D Project Address: 110 S 329TH PL Bldg 28 Parcel Number: 172104 9130 Project Description: REP-Replace 1st-and 2nd-floor,stacked decks on Units B&D and downstairs stairs access. Owner Applicant Contractor Lender WINTER HOLLY LTD PARTNERS JON ABRAHAMSON 130 S 329TH PL APT B PO BOX 688 130 S 329TH PL APT B FEDERAL WAY WA 98003 MERCER ISLAND WA 98040-0688 FEDERAL WAY WA 98003 Census Category: 434 -Residential alt/add-no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-1 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 0 0 0 0 New/Additional Sq.Feet-Deck 192 Mechanical to be Included........... ...i... No Permit for Building Shell'Only No Plumbing to be Included? No , New/Additional Sq.Feet-Total 192 Zoning Designation RM 2400 <.. 11 _;._ fel CONDITIONS: Subject to field inspection with plans. PERMIT EXPIRES Monday, July 4, 2011 Permit Issued on Wednesday, January 5, 2011 I hereby certify that the bove informa *on is correct d that the construction on the above described property and the occupancy and th use will be i ac rdance wit the laws, rules and regulations of the State of Washington a and the of Federal Way. _ Owner or age J Date: S �G`� it FD4AU41) /e411' _' ' ' THIS CARD IS TO REMAIN ON-SITE ant°� • Construction InsAtion Record Federal Way INSPECTION REQUESTS: 253 835-3050 REQUESTS: (253) PERMIT#: 11-100018-00-MF Address: 110 S 329TH PL Bldg 28 Project: WINTER HOLLY LTD PARTNERS FEDERAL WAY, WA 98003-6304 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg(4400) ID Initial Erosion Control(4365) Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By Date O Foundation Wall(4115) 0 Drainage/Downspout(4040) El Re-steel(4215) Approved to place concrete Approved to backfill Approved to place concrete or grout By Date By Date By Date ❑ Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Shear Walls(4245) El Roof Sheathing(4220) 0 Fire/Draft Stops(4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date O Interim Erosion Control(4370) .❑ Framing Prior to scheduling a Framing inspection; (4120) Approved Electrical,Plumbing&Mechanical Rough-in and Approved to insulate Fire/Draft Stop inspections must be signed-off and ��— By Date y approved. IBC 109.3.4 By Date /�/f/f/ El Insulation(4150) 0 Gypsum Wallboard Nailing(4130) ❑ Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud&tape Approved to drop tile By Date By Date By Date ❑ Final-Fire Department(4060) El Final-Planning 0 Final Erosion Control(4375) Approved Approved Approved By Date By Date By Date O Final-Building(4050) Approved By /if- Date //MI II ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date