17-104742 Electrical
City erFederal Way Permit #:17-104742-00-EL
Community Development Dept.
33325 8th Ave S FILE
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: STEEL LAKE PRESBYTERIAN CHURCH
Project Address: 1829 S 308TH ST Parcel Number:092104 9134
Project Description: Changing out old light pole heads,changing broken bollards lights,adding 4 new light poles,
changing out flood lights on perimeter,adding flood lights to gym.
Owner Applicant Contractor
STEEL LAKE PRESBYTERIAN CHURCH VIKTOR GRUY OWNER IS CONTRACTOR
1829 S 308TH ST 29630 22ND AVE S
FEDERAL WAY WA 98003 FEDERAL WAY WA 98003
Additional Permit Information
Is this an Online or O.T.C.application? Yes
Circuits-Commercial 2
PERMIT EXPIRES Thursday,4 October,2018
Permit Issued on Wednesday,October 4,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: (DI\ILINE Date:
c _
s
,
THIS CARD IS TO REMAIN ON-SITE
°� Construction Inspection Record
F@Cleral VNay INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 104742 00 Address: 1829 S 308TH ST
Project: STEEL LAKE PRESBYTERIAN CHI FEDERAL WAY WA 98003-4820
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
1❑ UFER Ground(4295) 2❑ Ditch cover(4030) 1:1 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
�By Date ABy C 1 Date tt, tg.Z-1 �jBy Date
® Pool Bonding(4195) El Temporary Power(4275) ® Service(4235)
Approved Approved Approved
By Date By Date By Date
•,
7❑ Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020)
Approved Approved Approved
By Date ).By 0., u4 Date ) o_lit_11 By Date
El Final-Electrical(4055)
Approved
By Q \A. Date \e__________,..\_.9...._,. _, R. t&
0 Rough Electrical 0Final Electrical 0 Right of Way
Approved Approved Approved
By Date By Date By Date