10-100694 Mechanical
•
City of Federal Way
Community Development Services Permit #: 10-100694•00-M E
P.O.Box 9718
Federal Way,WA 98063-9718
Ph:(253)835-2607 Fax (253)835-2609 Inspection Request Line: (253)835-3050
(1. ILE
Project Name: ANDREWS
Project Address: 927 S 294TH PL Parcel Number: 515240 0110
Project Description: Replace gas furnace and install 3 ton a/c
Owner Applicant Contractor
MICHAEL&DEANNE ANDREWS JAIMIE HOW BRENNAN HEATING&A/C LLC
927 S 294TH PL BRENNAN HEATING&A/C (GENERAL)
FEDERAL WAY WA 98003-3714 4601 S 134TH PL BRENNHA971R9(12/29/11)
SEATTLE WA 98168 4601 S 134TH PL
TUKWILA WA 98168
•
et•v4 ✓ emy � � ,,.. .✓.,,,( /...:,.,,. a. ., a . .,... e"-"pp-,0).. 4
)1,3 -;i44-0Af4a •.. cqp'ty;-`4,',F,
&,s•:',3,,,.. .,`„r.
Mechanical Valuation 6000 Is this an Online or O.T.C.application? Yes
hi
Air Conditioners- Stand Alone Un 1 Furnaces ` 1
PERMIT EXPIRES Saturday, August 21, 2010
Permit Issued on Monday, February 22, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and thity of Federal Way.
Owner or agent: 19 I.)11I'1 Date: •-i re
3 3 to
THIS CARD IS TO REMAIN ON-SITE •
CITY OF 0 Construction I ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 10-100694-00-ME Address: 927 S 294TH PL
Owner: MICHAEL & DEANNE ANDREWS FEDERAL WAY, WA 98003-3714
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) 0 Gas Piping(4125) ❑ Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date Bye a Date
El Rough Electrical ❑ Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date