Loading...
15-103763 S' ` Mechallical City of Federal Way 00�Permit #: 15�103763� M E Community&Econ.Dev.Services 33325 8th Ave S R Federal way,WA 98003 Inspection Request Line: Ph:(253)835 2607 Fax:(253)835-2609 p q (253)835-3050 Project Name: GUENTHER Project Address: 1334 S 290TH PL Parcel Number: 516210 0340 Project Description: relocation of gas meter Owner, Applicant Contractor DONALD GUENTHER COREY ALEXANDER INFRASOURCE SERVICES LLC KYUNG H GUENTHER INFRASOURCE SERVICES LLC INFRASL871C2(2/22/17) 1334 S 290TH PL 13330 STONE AVE N 14103 STEWART RD FEDERAL WAY WA 98003-3760 SEATTLE WA 98133 SUMNER WA 98390 Additional Permit Information Is this an Online or O.T.C.application? Yes Mechanical Fixtures Gas Pipe Outlets • 1 PERMIT EXPIRES Monday, January 25, 2016 Permit Issued on Wednesday, July 29, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington oNnith f ral Way. Owner or agent: Date: THIS CARD IS TOMAIN ON-SITE orliz*.Ntt,, CITY OF Construction Inlection ection Record a Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 15-103763-00-ME Address: 1334 S 290TH PL Project: DONALD GUENTHER FEDERAL WAY, WA 98003-3760 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough-in(4165) ❑ Gas Piping(4125) '❑ Final-Mechanical(4065) Approved Approved to release test Approved By Date 'II) (( 5 Date 0,Zx_, ) 'By Dateq ) i 11-- El Rough ElectricalCI Final Electrical CI Right of Way Approved Approved Approved By Date By Date By Date