Loading...
15-103765 • 1VMech$nical city of Fc n.Dev.ay permit #: 15-103765-00-M E Community 8 Econ.Dev.Services 33325 8th Ave S Federal Way,wA 98003 Inspection Request Line: 25 Ph:(253)835-2607 Fax:(253)835-2609 p q � 3)835-3050 Project Name: HA Project Address: 1329 S 290TH PL Parcel Number: 516210 0180 Project Description: Relocation of gas meter Owner Applicant Contractor MYUNG H HA COREY ALEXANDER INFRASOURCE SERVICES LLC JAMES Y IIA INFRASOURCE SERVICES LLC INFRASL871C2(2/22/17) 1329 S 190TH PL 13330 STONE AVE N 14103 STEWART RD • FEDERAL WAY WA 98003 SEATTLE WA 98133 SUMNER WA 98390 Additional Permit Information Is this an Online or O.T.C.application Yes Mechanical Fixtures Gas Piping 1 PERMIT EXPIRES Sunday, January 31, 2016 Permit Issued on Tuesday, August 4, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 1\J L I 1'J E Date: THIS CARD IS TO MAIN ON-SITE - CITY OF 11.111.110 Construction In ection Record Federal Way INSPECTION REQU TS: (253)835-3050 PERMIT#: 15-103765-00-ME Address: 1329 S 290TH PL Project: MYUNG H HA FEDERAL WAY, WA 98003-3760 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 0 Gas Piping(4125) ❑ Final-Mechanical(4065) Approved Approved to release test Approved `By Date . 'By n Date 4 ,i 1_ By - Date !k,—1 i �. . ElRough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date