Loading...
16-102254 Electrical City of Federal Way ) • co unity Econ.�v:Services Permit #: 16-102254-00=EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: Ph:(253)835-2607 Fax:(253)835-2609 p q (253)835-3050 Project Name: HICKEY Project Address: 105 S 295TH PL Parcel Number: 543721 0020 Project Description: Electrical connection for gas furnace replacement. Owner Applicant Contractor SUSAN G HICKEY JAIMIE HOW BRENNAN HEATING&A/C LLC TOM F HICKEY - BRENNAN HEATING&A/C (ELECTRICAL 01) 105 S 295TH PL 4601 S 134TH PL BRENNHA962DU(3/31/18) FEDERAL WAY WA 98003 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Electrical Work Valuation 300 Is this an Online or O.T.C.application Yes Is Use Educational or Institutional? No • Electrical Fixtures Circuits Residential 1 Thermostat. 1 PERMIT EXPIRES Thursday, May 11, 2017 Permit Issued on Wednesday, May 11, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: O N L I N E Date: THIS CARD IS TO MAIN ON-SITE , CITY OF •Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 16-102254-00-EL Address: 105 S 295TH PL Project: SUSAN G HICKEY FEDERAL WAY, WA 98003-3659 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground (4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date O Pool Bonding(4195) 0 Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By Date o Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) CI Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date O Final-Electrical(4055) Approved By Gi, Date '' 2.4_j Ce:. El Rough ElectricalEl Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date