13-101258 •
• Mechanical
City Federal Way •
Permit #: 13-101258-00-ME
Community&3&E8Dee.Services FILE
33325 8thth Ave S
Federal Way,WA 98003 Inspection Request Line: 253 835-3050
Ph:(253)835-2607 Fax(253)835-2609 p q
Project Name: MAHAN (ol(
Project Address: 1309 S 290TH PL Parcel Number 516210 0150
Project Description: Install furnace,heat pump and generator.
Owner Applicant Contractor
ROBERT MAHAN TAYLER MILLER ADVANCED FILTER&MECHANICAL INC
1309 S 290TH ST ADVANCED FILTER&MECHANICAL (GENERAL)
FEDERAL WAY WA 98003 418 NW VALLEY AVE ADVANFM044RD(12/29/14)
PUYALLUP WA 98371 418 VALLEY AVE NW SUITE B115
PUYALLUP WA 98372-2503
Additional Permit Information
Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Compressors/Heat Pumps 1 Furnaces 1 Gas Piping
CONDITIONS:
A permanently installed generator is not allowed to be placed within required yards(setbacks). See Bulletin
#150 for placement details.
PERMIT EXPIRES Sunday, September 15, 2013
Permit Issued on Tuesday, March 19, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent ONI.1NE Date:
4fee/13
• ' THIS CARD IS TOOMAIN ON-SITE .
CITY OF *` Construction Inspection Record
Federal Way INSPECTION REQUESTS : (253)835-3050
PERMIT#: 13-101258-00-ME Address: 1309 S 290TH PL
Project: ROBERT MAHAN FEDERAL WAY,WA 98003-3760
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ Mechanical Rough-in(4165) ❑ Gas Piping(4125) ❑ Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Q 1/4_ Date - az._1-3 , ,By q, Date - ���I
Rough Electrical Final Electrical Right of Way
ElApproved ElRough
IDApproved
By Date By Date By Date