Loading...
15-103598 ` t ! Electrial City co CommofEServices Permit #: 15-103598-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: Ph:(253)835-2607 Fax:(253)835-2609 p q (253)835-3050 Project Name: NAIMO Project Address: 2840 S 308TH LN Parcel Number: 092104 9312 Project Description: Replace existing 200 amp panel with new 200 amp panel. - , Owner Applicant Contractor SUNEET DIWAN CHRIS PEREZ N T L ELECTRIC 1900 S PUGET DR SUITE 203 704 228TH AVE NE UNIT 132 NTLEL**985M4(9/30/16) RENTON WA 98055 SAMMAMISH WA 98074 704 228TH AVE NE UNIT 132 SAMMAMISH WA 98074 Additional Permit Information Is this an Online or O.T.C.application Yes Is Use Educational or Institutional No Electrical Fixtures Alt.Serv./Feeder:0 to 200 amps(F 1 PERMIT EXPIRES Monday, January 18, 2016 Permit Issued on Wednesday, July 22, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington (f\ d the City of Federal Way. Owner or agent: (7,Ac , Date: `/' 7 f .,/fr_____ • THIS CARD IS TO RE ON-SITE CITY OF Construction Inspetlition Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 15-103598-00-EL Address: 2840 S 308TH LN Project: SUNEET DIWAN FEDERAL WAY, WA 98003-4800 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. UFER Ground (4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding(4195) 0 Temporary Power(4275) ❑ Service(4235) Approved Approved Approved By Date By Date By Date �` �L�_1.� 0 Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) ❑ Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date Final-Electrical(4055) Approved ByCom_ Date e1 , 2>.• S El Rough Electrical CI Electrical Right of Way Approved Approved •I=1Approved By Date By Date By Date - • , CITY of RECEIVED LECTRICAL Federal Way JUL 22 2015 PERMIT APPLICATION CITY OF FEDERAL WAY PERMIT NUMBER 5 _ 1 © 5 ,DI? _ SUITE/UNIT/SPACE# SITE ADDRESS: 'S 340 OJEfCT VALUATION ASQSESS�t'S TAX/PARCEL#D � - � � � 2-- CURRENT/PROPOSED USE PROJECT NAME (Tenant or Homeowner Last Name) e-e¢ ZACIRT--PAes PROJECT DESCRIPTION n�.� fpl Detailed description of work to !91 Y j /VI/OJ ti-- /9'22t. .—.., be included on this permit only NAME 52 ^ PRIMARY PHONE PROPERTY OWNER C\/)(-¢� �"_f�\�(` ( Y - Q l MAILING ADDRESS E-MAIL /' CITY STATE ZIP FAX c.� (2-7c L 0, ( ) - HAM PRIMARY PHONE ja MAILING ADDRESS �4cE-MAIL ELECTRICAL >ws_. A71 - 3Z11/ @ ..U c1) CONTRACTOR CITY SrE ZI1;:7807FAR ►YYlcr2 )r / ( ) 1 WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# NAME -���° PRIMARY PHONE APPLICANT CI r/'S -2} �, �. MAILING ADDRESS E-MAIL CITY STATE ZIP FAX ( ) NAME„---77 PRIMARY PHONE PROJECT CONTACT PZ) 2/V41,--6 2( / I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit applica tion is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal Iaws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a p s application. (idi SIGNATURE: DATE 7/7-2175— 7 • PRINT NAME: Y •• Bulletin#160—January 1,2013 Page 1 of 2 k:\Handouts\Electrical Permit Application