Loading...
15-102727 0 III .Electrical Community&Econ.De v Services Permit #: 15-102727-00-EL 33325 8th Ave S Federal Way,WA 98003 FILEInspection Re uest Line: 253 835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p Q i7� Project Name: JENKINS 31`." Project Address: 2009 S 301ST PL Parcel Number: 798290 0260 Project Description: Replace existing service panel with 125A main breaker panel Owner Applicant Contractor TRINITY R JENKINS RICK NESTOR WILDERNESS ELECTRIC INC 2009 S 301ST PL WILDERNESS ELECTRIC INC WILDEEI147M4(7/24/16) FEDERAL WAY WA 98003 23220 MAPLE VALLEY HWY RD SE SUITE 2( 23220 MAPLE VALLEY-BLACK DIAMOND F MAPLE VALLEY WA 98038 MAPLE VALLEY WA 98038-0250 Additional Permit Information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Electrical Fixtures Alt.Serv./Feeder:0 to 200 amps(F 1 PERMIT EXPIRES Wednesday, December 2, 2015 Permit Issued on Friday,June 5, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent NJ L I N E Date: f.Jl.r_,Le_O • THIS CARD IS TOOIAIN ON-SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 15-102727-00-EL Address: 2009 S 301ST PL Project: TRINITY R JENKINS FEDERAL WAY, WA 98003-4262 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Ditch cover(4030) 0 Service(4235) ❑ Feeders/Sub-panels(4045) Approved Approved Approved By Date `By Date .o, q _2 S . By Date ' ' 0 Rough Electrical(4225) El Final-Electrical(4055) Approved Approved By Date By Q:14.........., Date b of . is El Rough Electrical Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date