Loading...
13-104934 Mechanical City of&FedeEcon ev. y S Permit #: 13-104934-OO-M E Community&Econ.Avev.Services 33325 8th vS Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835 2609 Project Name: RUSSO Project Address: 407 S 308111 ST Parcel Number: 241330 0840 Project Description: Replacing Gas Furnace with New Gas Furnace Owner Applicant Contractor LUIZ C RUSSO CHARLIE NESLER ANDERSON NESLER COMPANY INC 407 S 308TH ST ANDERSON NESLER COMPANY ANDERNC921.1P(4/18/14) FEDERAL WAY WA 98003-4025 136 STEWART RD SE SUITE 1G PO BOX 597 PACIFIC WA 98047 MILTON WA 98354 Additional Permit Information Is this an Online or O.T.C.application? Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Saturday, May 3, 2014 Permit Issued on Monday, November 4, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agentopi Date: THIS CARD IS TtMAIN ON-SITE 11Nr CITY of il r � Construction Inspection Record - Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 13-104934-00-ME Address: 407 S 308TH ST Project: LUIZ C RUSSO FEDERAL WAY, WA 98003-4025 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as ' possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4185) 0 Gas Piping(4125) EI Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date • El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date