Loading...
17-105446 Mechanical City or Federal Way Permit #:17-105446-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253) 835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: NW KIDNEY CENTER-FEDERAL WAY WEST Project Address: 501 S 336TH ST Parcel Number:926480 0240 Project Description: Demolition of existing ductwork and installation of new ductwork,(2)2 exhaust fans and Data Room A/C for new tenant. Owner Applicant Contractor RANDY THOMPSONNORTHWEST KIDNEY ACCO ENGINEERED SYSTEMS ACCO ENGINEERED SYSTEMS CENTER (GENERAL) (GENERAL) 700 BROADWAY 835 N CENTRAL AVE SUITE 132 • ACCOESI971DU(10/17/19 SEATTLE WA 98122 KENT WA 98032 835 N CENTRAL AVE SUITE 132 KENT WA 98032 Additional Permit Information Mechanical Work Valuations 87410 Is this an Online or O.T.C.application'? No Air Conditioners-Stand Alonl 1 Ducting 1 Fans 2 PERMIT EXPIRES Tuesday, 19 June,2018 Permit Issued on Thursday,December 21,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ashington and the City of Federal Way. �j �2 ) Owner or agent: J`� Date: 1�- /1/ THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record Federal Way INSPECTION REQUESTS : (253)835-3050 PERMIT#: 17 105446 00 Address: 501 S 336TH ST Suite 110 Project: RANDY THOMPSON FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) 2❑ Gas Piping(4125) Q Final-Mechanical(4065) Approved Approved to release test Approved By AN Date 3 61 j X By Date By Atc\ Date 4/(R//,Fr ❑ Rough Electrical El Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date s AIRTEST Co., Inc. Ng BD Certified Test, Adjust and Balance Report Project: NW Kidney Center - Federal Way West Address: 501 S. 336th St. Federal Way, WA 98003 Engineer: Bellevue Mechanical, Inc. Mechanical Contractor: Bellevue Mechanical, Inc. Address: 5300 Denver Ave S Seattle, WA 98108 TAB Supervisor: Dustin Polly NEBB Certification: 3000 Date: April 11 , 2018 corn n tkitert ) 7 --A5qt-4 F -0D '91r end H d�'� P.O.Box 86•Issaquah,Washington 98027• (425)313-0172•Fax(425)313-5735 Page 1 of 21 f "_J AIRTEST Co., Inc , NES BB Table of Contents Certification 4 NEBB Certificates 5 AIRTEST Company, Inc. Warranty 7 Calibration Report 8 Test and Balance Summary 9 Field Note Report 10 Existing RTU-01 Report 11 Existing RTU-OINAV-01 11 Existing RTU-O 1 NAV-02 12 Existing RTU-OINAV-03 13 Existing RTU-O l NAV-04 13 Existing RTU-OINAV-05 14 Existing RTU-OINAV-06 14 Existing RTU-0l NAV-07 15 Existing RTU-O I NAV-08 15 Existing RTU-OINAV-09 16 Existing RTU-0INAV-10 16 Existing RTU-OINAV-11 17 FCU-1 Report 18 Fan Unit Reports 19 EF-1 19 Page 2 of 21 AIRTEST Co., Inc. NE BB EF-2 20 Numbered Floor Plan 21 Page 3 of 21 AIRTEST Co., Inc . NEC BB CERTIFICATION PROJECT: NW Kidney Center- Federal Way West ADDRESS: Federal Way, WA THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING,ADJUSTING,AND BALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIES, WHICH EXCEED NEBB TOLERANCES,ARE NOTED IN THE TEST-ADJUST-BALANCE REPORT PROJECT SUMMARY. NEBB TAB FIRM: AIRTEST CO., INC. REG. NO. 3000 CERTIFIED BY: DUSTIN POLLY DATE: April 11,2018 SUBMITTED &CERTIFIED BY: NEBB TAB FIRM: AIRTEST CO., INC. TAB SUPERVISOR: DUSTIN POLLY TN 1 Mr --'r • REG. NO. 3000 SIGNATURE: CERTIFICATION EXPIRATION DATE: March 31, 2019 X51 Go wan 40 Q 4114 �gc „"11,1 0.4 4P 44.$fid Hyde P.O. Box 86•Issaquah,Washington 98027• (425)313-0172•Fax(425)313-5735 Page 4 of 21 p F., A atre o w z I '"" COpa wcia az 1 Z CO 1 z z 1—.4 w Ze o w C4 W .rs Ze a* I gA ZIzi1It g .4 Ze az Ze imml µ f , w u (n�_y,,. r te "O" E 4. � .,i a a .:•-• ~ Q 4.4O �+ .a - t ` ,,;,* • cia te (/) co *C31 Page 5 of 21 v w u = Lc L CQ U c o �\ u L .4,, ,.., O i L 4 . d ice o ;'`�i i w e 1k A C 73 Vi t f"11= LIN U E^ CC V L CC C71, CI I. Cf) v m ' \N ce 5 _ u Z a COct 4 .4 '7 "0 = W E" c c L � c d CA � L w 4-: a Z o O a. �y4 0.1 p l�1 'L7 u u +" OS T a -.1.4.1,1 ,� ^i.r� O d O 't........, U a ed .amu° m eEn.Ct t m o to W • W a C e= tr Ei.141 y 10 u 0 14 71 vy u_ O +" L ;11 U u TO(U C° ;:) = W ,.... w — , cCu ucn a A4c..) ' CV > L C W �� L CP c.) c cc et h CO w = ca a G u Ci) ;4 L Z N N `cco f;a} • yi,A. °'�wA"r 'y�F t . Iu .,I .,T ,'-' `•' w Ir)VMJ ' cc Lt E lVvn " V a N C.' e.. .. ca :4 , 1. }1 d; # ,4,,:..-,;fir► 4. I S 'IYgYW4Y 'Y.{' v FT.,. rc ..P e • i?^ * 7 has _ ( F- C, , ,,''I.•f Page 6 of 21 AIRTEST Co Inc - Inc. NE BB Warranty of TAB Services PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA TECHNICIAN: Luke Holmen PROJECT#: 18-3025-1 Warranty of TAB Services: AIRIEST Co., Inc. warranties the TAB work performed on this project for one year from the date of the first published report. AIRIEST Co., Inc. reserves the right to correct errors or omissions in the collection of data, and issue amended TAB reports. This Warranty covers all Test and Balance services provided by AIRTEST unless otherwise stated in writing. When any balancing issues or concerns arise, AIRTEST Co., Inc. will dedicate resources to understand the issue or question. This may include a return trip(s)to the project site, or other appropriate methods of resolving the issue. A return trip(s)to the site, if necessary, will involve verification of system adjustments and adherence to reported values. No charges will be issued for any work found to be in compliance with the reported data, however if AIRIEST Co., Inc. is directed to make adjustments that result in differences from the reported data (i.e. Comfort Balancing), charges may be incurred. Repeated requests for Warranty services may incur charges if the TAB work is found to be in compliance with the reported data. Voided Warranty and Additional Charges: When issues arise due to mechanical equipment failure, control or maintenance related causes, the return trip may be subject to a service charge not covered under warranty. AIRTEST Co., Inc. reserves the right to resolve any TAB issues. Actions by others to resolve a warranty issue before AIRTEST Co., Inc. is notified, or allowed sufficient time to respond, will result in a voided project warranty. Any return trip(s)to the jobsite as a result of such actions are subject to charges. A purchase order will be required before returning to the jobsite if such conditions exist. Document Archiving: An electronic copy of the test data will be provided at no charge for the warranty period. Electronic copies of the project test data may be available after the warranty period, at no charge. Printed/ bound copies will be subject to a fee. Page 7 of 21 AIRTEST Co. Inc. NE1BB- Calibration Report PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA TECHNICIAN: Luke Holmen PROJECT#: 18-3025-1 CALIBRATION INSTRUMENT/SERIAL NUMBER APPLICATION DATES OF USE THRU TEST DATE Pacer DA410/1017008 Velocity Apr-18 8/17 Evergreen Telemetry CH-15D/1700294 CFM Apr-18 8/17 Evergreen Telemetry S-PVF-1/1700314 Pressure Apr-18 8/17 Shimpo DT-205LR/C1720062R RPM Apr-18 9/17 Fluke 323/36940058WS Electrical Apr-18 9/17 Evergreen Telemetry PR-T-1/1700235 Temperature Apr-18 7/17 Evergreen Telemetry S-DP-125/1700154 Hydronics Apr-18 10/17 SYMBOLS&ABBREVIATIONS ADJ=Adjustable Fan Speed LD x=Linear Diffuser where"x"is number of slots CD=Ceiling Diffuser N/A=Not Available CFM=Cubic Feet per Minute NI=Not Installed D/A=VAV Inlet Dimension in Inches NR=Not Required DD=Design Data NPSH=Net Positive Suction Head EG=Exhaust Grille RG=Return Grille E.S.P.=External Static Pressure RPM =Revolutions per Minute F/C=VAV Calibration Factor SF=Motor Service Factor FCD=Field Collected Data S.P.=Static Pressure FG=Floor Grille SWG=Side Wall Grille FLA=Motor Full Load Amps T.S.P.=Total Static Pressure GPM=Gallons per Minute VAR=Variable Fan Speed HP=Horsepower Hz=Hertz in.Hg.=Inches Mercury in.w.g.=Inches Water Gauge LD=Linear Diffuser Page 8 of 21 AIRTEST Co. Inc. NES BB r r Test and Balance Summary PROJECT: NW Kidney Center- Federal Way West DATE: April 11, 2018 LOCATION: Federal Way,WA TECHNICIAN: Luke Holmen PROJECT#: 18-3025-1 Test and balance was done based upon NEBB procedural standards and Washington State Energy Code. Items of note are listed in the "Field Note Report" and in the "Note" section under each piece of equipment throughout the report. Unable to test all equipment under design day conditions due to ambient conditions at time of balance. Shut-Off VAV's: Drove the VAV's to their primary max flow, outlets were read out using a flow hood and box was calibrated at that point. Outlets were then proportioned using the volume dampers. This procedure was also done for the dual duct VAV's, in order to calibrate heating primary flow, the cooling primary was closed 100% to accurately display heating primary only. In cooling the primary damper of the heating side is designed to close fully. EF-1: Unit was read out using a flow hood and diffusers were proportioned using volume dampers. Fan speed was adjusted using a speed controller. EF-2: Unit was read using a flow hood. Fan speed is only adjustable using motor sheave which was factory set at mid position. Page 9 of 21 AIRTEST Co. Inc . Ng BB Field Note Report PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Poll Test System/Unit Name Date Contact Notes/Comment Logs Fan Unit EF-1 9-Apr-18 Luke Holmen Unit nameplate is covered up by Sealer Fan Unit EF-2 9-Apr-18 Luke Holmen No motor installed for OSA damper, manually opened damper to set airflow on exhaust fan. Fan Coil FCU-1 9-Apr-18 Luke Holmen Mini split wall unit, no balancing required VAV Box Existing RTU-01/VAV-01 9-Apr-18 Luke Holmen Stat labeled as VAV-102 6-Apr-18 Luke Holmen Design Heat is the max primary heating 9-Apr-18 Luke Holmen Primary damper at 100%. Proportioned grilles to 82%of flow total,and calibrated box. RTU is a constant speed unit and does not have a duct static set point to increase primary flow. RTU is not in scope of work VAV Box Existing RTU-01/VAV-02 6-Apr-18 Luke Holmen Design Heat is the max primary heating 9-Apr-18 Luke Holmen Stat labeled as VAV-103 9-Apr-18 Luke Holmen Primary damper at 100%. Proportioned grilles to 88%of flow total,and calibrated box. RTU is a constant speed unit and does not have a duct static set point to increase primary flow. RTU is not in scope of work VAV Box Existing RTU-01/VAV-03 6-Apr-18 Luke Holmen Schedule did not match outlet total, balanced unit to outlet total and proportionally lowered cooling primary min 9-Apr-18 Luke Holmen Stat labeled as VAV-104 6-Apr-18 Luke Holmen Design Heat is the max primary heating VAV Box Existing RTU-01/VAV-04 9-Apr-18 Luke Holmen Stat labeled as VAV-105 6-Apr-18 Luke Holmen Design Heat is the max primary heating VAV Box Existing RTU-01/VAV-05 9-Apr-18 Luke Holmen Stat labeled as VAV-118 6-Apr-18 Luke Holmen Diffuser in corridor was moved to VAV-9, adjusted primary min and max to outlet total design VAV Box Existing RTU-01/VAV-06 9-Apr-18 Luke Holmen Stat labeled as VAV-117 VAV Box Existing RTU-01/VAV-07 9-Apr-18 Luke Holmen Stat labeled as VAV-117 6-Apr-18 Luke Holmen Schedule did not match outlet total, balanced unit to outlet total and proportionally lowered cooling primary min 6-Apr-18 Luke Holmen Primary min will not be able to reach 40 CFM design due to the damper being closed fully and still achieving 125 CFM VAV Box Existing RTU-01/VAV-08 9-Apr-18 Luke Holmen Stat labeled as VAV-122 VAV Box Existing RTU-01/VAV-09 9-Apr-18 Luke Holmen Stat labeled as VAV-126 6-Apr-18 Luke Holmen Box serves fourth diffuser in the hallway, adjusted primary max and min to match outlet total VAV Box Existing RTU-01/VAV-10 6-Apr-18 Luke Holmen Box serves third diffuser in the hallway, adjusted primary max and min to match outlet total 9-Apr-18 Luke Holmen Stat labeled as VAV-125 VAV Box Existing RTU-01/VAV-11 , 9-Apr-18 Luke Holmen Stat labeled as VAV-127 AIRTEST Co., Inc. Page 10 of 21 ria 1 AIRTEST Inc. NE BB Co., Roof Top Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: Existing RTU-OINAV-01 Tested By: Luke Holmen AREA: Entry/Wait Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Heat 500 CFM Model Number 55XX 800 Actual Heat 520 CFM Controls System Distech Design Primary Max CFM 990 CFM VAV Type Dual Duct Actual Max Primary CFM 815 CFM Box Inlet Size 8 RD Cooling/6 RD Heating Design Primary Min.CFM 295 CFM K Factor 800 Cooling/600 Heating Actual Primary Min.CFM 300 CFM Log: Existing RTU-01/VAV-01 4/9/2018 Luke Holmen Stat labeled as VAV-102 Existing RTU-01NAV-01 4/9/2018 Luke Holmen Primary damper at 100%.Proportioned grilles to 82% of flow total,and calibrated box.RTU is a constant speed unit and does not have a duct static set point to increase primary flow.RTU is not in scope of work Existing RTU-OINAV-01 4/6/2018 Luke Holmen Design Heat is the max primary heating Existing RTU-OINAV-01 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Wheelchair Parking CD 10 x 10 330 360 265 80 Outlet-02 Entry/Wait CD 10 x 10 330 260 285 86 Outlet-03 Prep CD 10 x 10 330 245 265 80 Totals: - - 990 865 815 82 AIRTEST Co., Inc. Page 11 of 21 AIRTEST Co., Inc . N E BB Roof Top Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: Existing RTU-01/VAV-02 Tested By: Luke Holmen AREA: Consult Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Heat 300 CFM Model Number 55XX 800 Actual Heat 325 CFM Controls System Distech Design Primary Max CFM 930 CFM VAV Type Dual Duct Actual Max Primary CFM 815 CFM Box Inlet Size 8 RD Cooling/8 RD Heating Design Primary Min.CFM 280 CFM K Factor 1200 Cooling/1050 Heating Actual Primary Min.CFM 285 CFM Log: Existing RTU-OINAV-02 4/9/2018 Luke Holmen Stat labeled as VAV-103 Existing RTU-01NAV-02 4/9/2018 Luke Holmen Primary damper at 100%.Proportioned grilles to 88% of flow total,and calibrated box.RTU is a constant speed unit and does not have a duct static set point to increase primary flow.RTU is not in scope of work Existing RTU-01NAV-02 4/6/2018 Luke Holmen Design Heat is the max primary heating Existing RTU-OINAV-02 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Consult CD 10 x 10 280 380 245 88 Outlet-02 Equipment Parking CD 10 x 10 325 400 290 89 Outlet-03 Equipment Parking CD 10 x 10 325 445 285 88 Totals: - - 930 1225 820 88 AIRTEST Co., Inc. Page 12 of 21 AIRTEST Co. Inc E . NBB Roof Top Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: Existing RTU-OINAV-03 Tested By: Luke Holmen AREA: Hall Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Heat 320 CFM Model Number 55XX 800 Actual Heat 325 CFM Controls System Distech Design Primary Max CFM 1040 CFM VAV Type Dual Duct Actual Max Primary CFM 1090 CFM Box Inlet Size 8 RD Cooling/6 RD Heating Design Primary Min.CFM 305 CFM K Factor 1275 Cooling/525 Heating Actual Primary Min.CFM 310 CFM Log: Existing RTU-01NAV-03 4/9/2018 Luke Holmen Stat labeled as VAV-104 Existing RTU-01NAV-03 4/6/2018 Luke Holmen Schedule did not match outlet total,balanced unit to outlet total and proportionally lowered cooling primary min Existing RTU-01/VAV-03 4/6/2018 Luke Holmen Design Heat is the max primary heating Existing RTU-01/VAV-03 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Equipment Parking CD 10 x 10 325 440 345 106 Outlet-02 Home T/C CD 10 x 10 225 335 235 104 Outlet-03 Home Nurse 8 Quiet/Flex CD 8 x 8 110 50 100 91 Outlet-04 Open Office CD 10 x 10 380 330 410 108 Totals: - - 1040 1155 1090 105 SYSTEM/UNIT: Existing RTU-OINAV-04 Tested By: Luke Holmen AREA: Open Office Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Heat 215 CFM Model Number 55XX 800 Actual Heat 195 CFM Controls System Distech Design Primary Max CFM 510 CFM VAV Type Dual Duct Actual Max Primary CFM 520 CFM Box Inlet Size 7 RD Cooling/5 RD Heating Design Primary Min.CFM 150 CFM K Factor 1000 Cooling/448 Heating Actual Primary Min.CFM 155 CFM Log: Existing RTU-OINAV-04 4/9/2018 Luke Holmen Stat labeled as VAV-105 Existing RTU-OINAV-04 4/6/2018 Luke Holmen Design Heat is the max primary heating Existing RTU-OINAV-04 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Open Office CD 10 x 10 380 630 380 100 Outlet-02 Nurse Manager CD 8 x 8 130 35 140 108 Totals: - - 510 665 520 102 AIRTEST Co., Inc. Page 13 of 21 f _- AIRTESTCo., Inc . N E BB Roof Top Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: Existing RTU-OINAV-05 Tested By: Luke Holmen AREA: Staff Lounge Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Primary Max CFM 410 CFM Model Number 55XX 800 Actual Max Primary CFM 405 CFM Controls System Distech Design Primary Min.CFM 120 CFM VAV Type Shut-Off Actual Primary Min.CFM 125 CFM Box Inlet Size 8 RD K Factor 825 Log: Existing RTU-OINAV-05 4/9/2018 Luke Holmen Stat labeled as VAV-118 Existing RTU-01NAV-05 4/6/2018 Luke Holmen Diffuser in corridor was moved to VAV-9,adjusted primary min and max to outlet total design Existing RTU-01/VAV-05 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Staff Lounge CD 10 x 10 230 220 230 100 Outlet-02 Dialyis Supply CD 6 x 6 65 50 60 92 Outlet-03 Staging CD 6 x 6 70 55 70 100 Outlet-04 Nurse Manager CD 6 x 6 45 60 45 100 Totals: - - 410 385 405 99 SYSTEM/UNIT: Existing RTU-01/VAV-06 Tested By: Luke Holmen AREA: Private Dialysis Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Primary Max CFM 600 CFM Model Number 55XX 800 Actual Max Primary CFM 620 CFM Controls System Distech Design Primary Min.CFM 180 CFM VAV Type Shut-Off Actual Primary Min.CFM 185 CFM Box Inlet Size 7 RD K Factor 720 Log: Existing RTU-01NAV-06 4/9/2018 Luke Holmen Stat labeled as VAV-117 Existing RTU-OINAV-06 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Dialysis Treatment CD 8 x 8 200 180 220 110 Outlet-02 Private Dialysis CD 8 x 8 200 265 205 103 Outlet-03 Corridor CD 8 x 8 200 195 195 98 Totals: - - 600 640 620 103 AIRTEST Co., Inc. Page 14 of 21 AIRTEST Co., Inc . NE ,,BB Roof Top Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: Existing RTU-01/VAV-07 Tested By: Luke Holmen AREA: Dialysis Treatment Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Primary Max CFM 140 CFM Model Number 55XX 800 Actual Max Primary CFM 140 CFM Controls System Distech Design Primary Min.CFM 40 CFM VAV Type Shut-Off Actual Primary Min.CFM 40 CFM Box Inlet Size 6 RD K Factor 425 Log: Existing RTU-OINAV-07 4/9/2018 Luke Holmen Stat labeled as VAV-117 Existing RTU-01NAV-07 4/6/2018 Luke Holmen Primary min will not be able to reach 40 CFM design due to the damper being closed fully and still achieving 125 CFM Existing RTU-01NAV-07 4/6/2018 Luke Holmen Schedule did not match outlet total,balanced unit to outlet total and proportionally lowered cooling primary min Existing RTU-OINAV-07 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Reception CD 6 x 6 50 75 50 100 Outlet-02 Nurse&Meds CD 6 x 6 90 75 90 100 Totals: - - 140 150 140 100 SYSTEM/UNIT: Existing RTU-OINAV-08 Tested By: Luke Holmen AREA: Hall Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Primary Max CFM 540 CFM Model Number 55XX 800 Actual Max Primary CFM 530 CFM Controls System Distech Design Primary Min.CFM 165 CFM VAV Type Shut-Off Actual Primary Min.CFM 170 CFM Box Inlet Size 6 RD K Factor 775 Log: Existing RTU-01NAV-08 4/9/2018 Luke Holmen Stat labeled as VAV-122 Existing RTU-01/VAV-08 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Water Treatment CD 10 x 10 250 230 240 96 Outlet-02 Hall CD 6 x 6 40 100 40 100 Outlet-03 Acid&Concentrate CD 10 x 10 250 165 250 100 Totals: - - 540 495 530 98 AIRTEST Co., Inc. Page 15 of 21 . I "-' 1 AIRTEST Co., Inc . NE ,BB Roof Top Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: Existing RTU-01/VAV-09 Tested By: Luke Holmen AREA: Hall Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Primary Max CFM 430 CFM Model Number 55XX 800 Actual Max Primary CFM 420 CFM Controls System Distech Design Primary Min.CFM 130 CFM VAV Type Shut-Off Actual Primary Min.CFM 135 CFM Box Inlet Size 8 RD K Factor 950 Log: Existing RTU-01/VAV-09 4/9/2018 Luke Holmen Stat labeled as VAV-126 Existing RTU-01/VAV-09 4/6/2018 Luke Holmen Box serves fourth diffuser in the hallway,adjusted primary max and min to match outlet total Existing RTU-OINAV-09 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 PM&FSS Work CD 8 x 8 125 150 120 96 Outlet-02 Soiled Utility CD 6 x 6 75 70 70 93 Outlet-03 Coats&Masks CD 6 x 6 30 120 30 100 Outlet-04 Corridor CD 10 x 10 200 155 200 100 Totals: - - 430 495 420 98 SYSTEM/UNIT: Existing RTU-OINAV-10 Tested By: Luke Holmen AREA: Dialysis Treatment Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Primary Max CFM 600 CFM Model Number 55XX 800 Actual Max Primary CFM 645 CFM Controls System Distech Design Primary Min.CFM 195 CFM VAV Type Shut-Off Actual Primary Min.CFM 200 CFM Box Inlet Size 6 RD K Factor 1230 Log: Existing RTU-01NAV-10 4/9/2018 Luke Holmen Stat labeled as VAV-125 Existing RTU-01NAV-10 4/6/2018 Luke Holmen Box serves third diffuser in the hallway,adjusted primary max and min to match outlet total Existing RTU-01/VAV-10 Supply Outlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Dialysis Treatment CD 10 x 10 200 170 220 110 Outlet-02 Dialysis Treatment CD 10 x 10 200 130 220 110 Outlet-03 Corridor CD 10 x 10 200 315 205 103 Totals: - - 600 615 645 108 AIRTEST Co., Inc. Page 16 of 21 r AIRTEST Co., Inc . NE BB Roof Top Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: Existing RTU-OINAV-11 Tested By: Luke Holmen AREA: Open Office Date: 4/9/2018 Unit Data Air Test Data Manufacturer Trane Design Heat 150 CFM Model Number 55XX 800 Actual Heat 165 CFM Controls System Distech Design Primary Max CFM 400 CFM VAV Type Dual Duct Actual Max Primary CFM 410 CFM Box Inlet Size 10 RD Cooling/9 RD Heating Design Primary Min.CFM 115 CFM K Factor 1725 Cooling/1375 Heating Actual Primary Min.CFM 120 CFM Log: Existing RTU-01NAV-11 4/9/2018 Luke Holmen Stat labeled as VAV-127 Existing RTU-OINAV-11 Supply Outlet Summary System/Unit Area Served Outlet Size LxW I Design Prelim Final %Final Type D CFM Reading Reading Outlet-01 Open Office CD 10 x 10 200 305 215 108 Outlet-02 Open Office CD 10 x 10 200 165 195 98 Totals: - - 400 470 410 103 AIRTEST Co., Inc. Page 17 of 21 AIRTEST Co., Inc . Nig BB Fan Coil PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: FCU-1 Tested By: Luke Holmen Date: 4/9/2018 Log: FCU-1 4/9/2018 Luke Holmen Mini split wall unit,no balancing required AIRTEST Co., Inc. Page 18 of 21 AIRTEST Co., Inc . E BB r r Fan Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: EF-1 Tested By: Luke Holmen AREA: Open Office Date: 4/9/2018 Unit Data Motor Data Unit Location Open Office Motor Manufacturer Vari-Green Unit Serves 1st Floor Motor HP 3/4 HP Unit Manufacturer Greenheck Motor RPM 300-2200 RPM Model Number N/A Motor Rated Volts 120 Volts Serial Number N/A Motor Phase 1 Fan Type/Class BI/1 Motor Hertz 60 Hz Motor FL Amps 11.3 Amps Test Data Motor Service Factor 1.0 Fan RPM Actual ADJ @ 7 Speed Controller SP In Actual -0.40 in.wc Sheave Data SP Out Actual 0.23 in.wc Drive Type Direct Drive External SP Actual 0.63 in.wc Air Test Data Electrical Test Data Tot.GRD CFM Des. 710 CFM Motor Volts 1 119 Volts Tot.GRD CFM Act. 700 CFM Motor Amps 1 2.1 Amps Log: EF-1 4/9/2018 Luke Holmen Unit nameplate is covered up by Sealer EF-1 Exhaust Inlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Inlet-1 P.Toilet EG 8 x 8 110 115 115 105 Inlet-2 Private Dialysis EG 8 x 8 140 150 130 93 Inlet-3 HSK EG 6 x 6 70 75 75 107 Inlet-4 S.Toilet EG 6 x 6 90 70 85 94 Inlet-5 Staff Lounge EG 12 x 24 200 220 190 95 Inlet-6 Med Waste EG 8 x 8 100 145 105 105 Totals: - - 710 775 700 99 AIRTEST Co., Inc. Page 19 of 21 AIRTEST Co., Inc . NE EB Fan Unit PROJECT: NW Kidney Center-Federal Way West DATE: 4/11/2018 LOCATION: Federal Way,WA CONTACT: Luke Holmen PROJECT#: 18-3025-1 AUTHOR: Dustin Polly SYSTEM/UNIT: EF-2 Tested By: Luke Holmen AREA: Acid &Concentrate Date: 4/9/2018 Unit Data Motor Data Unit Location Acid&Concentrate Motor Manufacturer Greenheck Unit Serves Acid&Concentrate Motor HP 1/4 HP Unit Manufacturer Greenheck Motor RPM 1725 RPM Model Number BSQ-70-4-X Motor Rated Volts 115 Volts Serial Number 15350304 Motor Phase 1 Fan Type/Class BI/1 Motor Hertz 60 Hz Motor FL Amps 4.6 Amps Test Data Motor Service Factor 1.0 SP In Actual -0.54 in.wc SP Out Actual 0.12 in.wc Sheave Data External SP Actual 0.66 in.wc Drive Type Belt Motor Sheave 1 VP30 Electrical Test Data Motor Sheave Bore 1/2"in. Motor Volts 1 117 Volts Fan Sheave 3"OD Motor Amps 1 5.1 Amps Fan Sheave Bore 1"in. Belt Size 3L380R Belt Quantity 1 Sheave Center Line 15 in. Air Test Data Tot.GRD CFM Des. 300 CFM Tot.GRD CFM Act. 330 CFM Log: EF-2 4/9/2018 Luke Holmen No motor installed for OSA damper,manually opened damper to set airflow on exhaust fan. EF-2 Exhaust Inlet Summary System/Unit Area Served Outlet Size LxW/ Design Prelim Final %Final Type D CFM Reading Reading Inlet-01 Acid&Concentrate EG 24 x 12 300 400 330 110 Totals: - - 300 400 330 110 AIRTEST Co., Inc. Page 20 of 21 . f. • I • g 01 I 'i 11 1 Y Y , 7F''a1y_• lg :ik t Y a:: a , a 0O 1 . f.�a Y .— I�u 1 , dO I 31si (3"t Y i •in -Ir lige e n e—O.1: I K `1 �� �'b•I Ao I Y �610L T x f e g ii _ 4 pp �•I � 013t � \\ 81�Y _ n Re •4sp t u .) ?Yl I ° Via''` 1,1 "PPP" a.: IMP Si'-: _^: 4 .J 0�: b .II9G �f 411) Y ©= . FSO nip S FP' t �� 1 IIFJ Ya R YI a II f i 01�. 0 s I• `$`t c-17 04 FpC Y D f a If f U t zi zi K3 !s NKC FEDERAL WAY WEST i i ,--�•�; Bellevue Mechanical SAIUS. g O 4C g Y V 1.1121M Avenue NE Be1bn».WA 98005 g 501 S.336TH ST.,FEDERAL WAY,WA 96003 g y'1vn�ne.2s xssmw COORDINATION REVISIONS — em �m RECEIVED PERMIT APPLICATION CITY OF NOVFederal Way IvY 0 9 2017 PERMIT CENTER+33325 8th Avenue South+ Federal Way,WA 98003-6325 253-835-2607+ FAX 253-835-2609+ permitcentera,cityoffederalway.com CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT PERMIT NUMBER _ _ El `- S SLI TARGET DATE SITE ADDRESS SUITE/UNIT• 5D ( S. 336 TitS% FF-Dum.-UR-1J NA- 9'8003 ! l0 PROJECT VALUATION ZO1(ING ASSESSOR'S TAX/PARCEL I $ f 6 y 0 - 0 2 y TYPE OF PERMIT El BUILDING ❑PLUMBING XMECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT Ai /CC_ rp EAZ4 L WA Y w S PROJECT DESCRIPTION ,,DeMO c r7 pu G �'(� TOKLC 5641. N 4. I I S PA-ce• - 1 ios " Detailed description of work to (4 NFt•A1J ST S) ("-)Sy+t.t_ �)fJ R0 A4 A/G be included on this permit only s L N E_w Du c-rwn( -ri' SF U E- T-i NAME PRIMARY PHONE RN- pL41A- As roc__ PROPERTY OWNER MAILING ADDRESS E-MAIL I 1 2AS) A 06- Sri- !Fop CITY STATE ZIP SEA-rn, Wk. qr.")NAME PHONE ACGo ENGRFZ SYSTEMS %A- Ma.ewe_/wit. yZs-I/53-2/y0 MAILING ADDRESS E-MAIL CONTRACTOR /33/ /ZCo Ave fit- CITY 1d�tCN�QGLt�GS.W'K' CITY STATE ZIP FAR STA EV�E- WA- �f 5 WA STATE CONTRACTOR'S LICENSE I EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE• Acc-oc_sZ/'r1DtA /0 i f1_ / 1c7 OZ-l00030_000-00 et_ NAME PRIMARY PHONE IDSw SALl7 Cc-I qy7-525-Sq% MAILING ADDRESS E-MAIL APPLICANT 1331 at, - AE N1 - ``ba(d,cCc-i e S-C -- crrr STATE BCz>PVAX 981;05 NAME S NAME PRIMARY PHONE �/ PROJECT CONTACT "BSEP (3A L1) (C C.- yVq'52S—sq (The individual to receive and MAILING ADDRESS AE-MAIL respond to all correspondence 331 (20'7`' ✓e— n i- itachici a.«'l �cces concerning this application) CITY STATE ZIP FAX I3EU.k✓t/a- 04- QHS NAME ( PROJECT FINANCING IST OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorised agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person, including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. JJ SIGNATURE: ,4, /_-_---' PV/"."------. DATE 1 i/9/ PRINT NAME: "0-O Pft— 3A C C I Bulletin#100-January 29,2016 Page 1 of 2 k:\Handouts\Permit Application MECHANICAL PERMIT VALUEuuOFMECHANICALWORK Indicate how many of each type offvcture to be installed or relocated as part of this project.Do not include existing fixtures to remain. T AIR HANDLING UNITS Z-. FANS• GAS PIPE OUTLETS OTHER(Describe) 1 AIR CONDITIONER• FIREPLACE INSERTS HOODS(commercial) BOILERS FURNACES HOT WATER TANKS(Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING' GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT Indicate how many of each type offixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. BATHTUBS(or Tub/Shower combo) LAVS(Hand Sinks( TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS(Kitchen/Utility) WATER HEATERS(Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS $ EXISTING/PREVIOUS USE LOT SIZE lin Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑Yes ❑ No ❑Yes ❑ No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) SECOND FLOOR COVERED ENTRY DECK GARAGE ❑ CARPORT ❑ OTHER(describe) EEIS'MO PROPOSED TOTAL Area Totals **NEW HOMES ONLY** ESTIMATED SELLING PRICE$ I #OF BEDROOMS COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area in Occupancy Group(s) Construction #of Additional Information Square Feet Type Stories NEW BUILDING ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Construction #of Occupancy Group(s) Additional Information Square Feet Type Stories TOTAL BUILDING I5 v0i7 5Th4-L L. TENANT AREA ONLY 5 0 0 O C^ � sTur L PROJECT AREA ONLY 5l 3(x) Bulletin#100—January 29,2016 Page 2 of 2 k:\Handouts\Permit Application