13-102670r a
ARRlican
Contractor
THANH PHAM
City of Federal Way
wow
Community & Econ. Dev. Services
LM
FIL"
33325 8th Ave S
TACOMA WA
Federal Way, WA 98003
BRENNHA971R9 (12/29/13)
Ph: (253) 835-2607 Fax. (253) 835-2609
SEATTLE WA 98168
Project Name: PRAM
Project Address: 505 S 310TH PL
Project Description: replace existing gas furnace
0 { Mechanical
Permit #: 13 -102670 -00 -ME
Inspection Request Line: (253) 835-3050
3 u�7S-7
Parcel Number: 241330 0060
Owner
ARRlican
Contractor
THANH PHAM
JAIMIE HOW
BRENNAN HEATING & A/C LLC
1918 HILLSIDE DR NE
BRENNAN HEATING & A/C
(GENERAL)
TACOMA WA
4601 S 134TH PL
BRENNHA971R9 (12/29/13)
98422
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Furnaces ......................................... 1
PERMIT EXPIRES Sunday, December 15, 2013
Permit Issued on Tuesday, June 18, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
ral Way.
Owner oragent: ONLINE Date:
�
CITY OF 6
Federal Way
PERMIT #:
13 -102670 -00 -ME
THIS CARD IS TO MAIN ON-SITE 4
Construction I ection Record
INSPECTION REQ TS: (253) 835-3050
Address: 505 S 310TH PL
Project: THANH PHAM FEDERAL WAY, WA 980034028
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
1:1Rough
Mechanical Rough -in (4165)Gas
Piping (4125)
0
Final - Mechanical (4065
Approved
By
Approved to release test
Approved
By
Date
By
Date
BDate
I 1�k
1:1Rough
Electrical
Approved1:1
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date