16-102072Mechanical
City of Federal Way
Community &Econ. Dev. Services Permit #: 16 -102072 -00 -ME
33325 8th Ave S FILE
Federal Way, WA 98003 Inspection Request Line: 253 835-3050
136: (253) 835-2607 Fax: (253) 835-2609 p q
Project Name: PATON
Project Address: 215 S 317TH PL Parcel Number: 337530 0530
Project Description: Replace gas water heater
Owner
A121211can
Contractor
MAJOR P PATON
ETHAN ONAT
WASHINGTON ENERGY SERVICES CO
CHRISTINE C PATON
WASHINGTON ENERGY SERVICES CO
(GENERAL)
215 S 317TH PL
3909 196TH ST SW
WASIHES851NS (9/7/17)
FEDERAL WAY WA 98003-5259
LYNNWOOD WA 98036
3909 196TH ST SW
LYNNWOOD WA 98036
Additional Permit Information
Mechanical Work Valuation?.................................1500
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Hot Water Tanks ............................ 1
PERMIT EXPIRES Saturday, October 29, 2016
Permit Issued on Monday, May 2, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
UNLINE
A44
CITY OF
Federal Way
PERMIT #:
16 -102072 -00 -ME
' TIIIS CARD IS TO.MAIN ON-SITE -
Construction In ection Record
INSPECTION REQU TS: (253) 835-3050
Address: 215 S 317TH PL
Project: MAJOR P PATON FEDERAL WAY, WA 98003-5259
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed asclose to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By Ata Date 51
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way_
Approved
By
Date
By
Date
By
Date