Loading...
12-105401City of Federal Way Community 8 Econ. ev. Services L E 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 U Wchatical Permit #: 12 -105401 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: CARLTON 3b 6 I ( Project Address: 903 S 317TH ST Project Description: Gas to gas water heater replacement Parcel Number: 858800 0320 Owner Annlicant Contractor PATRICIA L CARLTON WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO 31718 8TH AVE- S NORTHWEST PERMIT/ WESCO (GENERAL) FEDERAL WAY WA 98003-5323 1345 W GULF RD WASHIES9710B (9/2/13) POINT ROBERTS WA 98281 2800 THORNDYKE AVE W SEATTLE WA 98199 Additional Permit Information Mechanical Valuation............................................950 Hot Water Tanks ............................ 1 Is this an Online or O.T.C. application?.................Yes PERMIT EXPIRES Wednesday, May 29, 2013 Permit. Issued on Friday, November 30, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington nd the Cltv of Federal Way. HL 0 Owner or agent: Date: THIS CARD IS TO MAIN ON-SITE C,noFAConstruction I ection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 12 -105401 -00 -ME Address: 903 S 317TH ST Project: PATRICIA L CARLTON FEDERAL WAY, WA 98003-5333 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 7 Mechanical Rough -in (4165)Gas Piping (4125) Final - Mechanical (4065) Approved Right of Way Approved to release test Approved By Date By Date Date r-=/ 7 Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date