14-101433Electrical
Permit #: 14 -101433 -00 -EL
Inspection Request Line: (253) 835-3050
Project Name: KING COUNTY LIBRARY @ SOUTH 320TH STREET
Project Address: 848 S 320TH ST
Project Description: 1144516 Install (3) LED wallpacks at employee entry
Parcel Number: 082104 9222
Owner
Al2RIlican
City of Federal Way
KING COUNTY LIBRARY SYSTEM
Community & Econ. Dev. Services
FILE
33325 8th Ave S
PRIME ELECTRIC INC
Federal Way, WA 98003
ISSAQUAH WA 98027-2702
Ph: (253) 835-2607 Fax: (253) 835-2609
13301 SE 26TH ST
Electrical
Permit #: 14 -101433 -00 -EL
Inspection Request Line: (253) 835-3050
Project Name: KING COUNTY LIBRARY @ SOUTH 320TH STREET
Project Address: 848 S 320TH ST
Project Description: 1144516 Install (3) LED wallpacks at employee entry
Parcel Number: 082104 9222
Owner
Al2RIlican
Contractor
KING COUNTY LIBRARY SYSTEM
JEREMY STEEB
PRIME ELECTRIC INC
960 NEWPORT WAY NW
PRIME ELECTRIC INC
PRIMEEI134BT (1/30/15)
ISSAQUAH WA 98027-2702
13301 SE 26TH ST
13301 SE 26TH ST
BELLEVUE WA 98005
BELLEVUE WA 98005
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Service greater than 999 Amps? .............................No
Electrical Fixtures
Circuits - CommerciaL................... 1
Is Use Educational or Institutional?.......................No
PERMIT EXPIRES Saturday, September 27, 2014
Permit Issued on Monday, March 31, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ^ w 11 I ki C Date:
■ ■ V LM
<FjNq�FO
CrFV �F 400I&I-m
Federal Way
PERMIT #:
14 -101433 -00 -EL
THIS CARD IS TO MAIN ON-SITE
Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
Address: 848 S 320TH ST
Project: KING COUNTY LIBRARY SYSTEM FEDERAL WAY, WA 98003-5346
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
Service (4235)
Feeders/Sub-panels (4045)
Final Electrical
Approved
Rough Electrical (4225)
0
Approved
rBy
Approved
Date
Approved
By
Date
Date
By
Date
Ceiling Cover (4020) Final - Electrical (4055)
Approved Approved
By Date Dat_ l
Rough Electrical
Approved
Final Electrical
Approved
0
Right of Way —�
Approved
By
Date
By
Date
By
Date