Loading...
14-101433Electrical Permit #: 14 -101433 -00 -EL Inspection Request Line: (253) 835-3050 Project Name: KING COUNTY LIBRARY @ SOUTH 320TH STREET Project Address: 848 S 320TH ST Project Description: 1144516 Install (3) LED wallpacks at employee entry Parcel Number: 082104 9222 Owner Al2RIlican City of Federal Way KING COUNTY LIBRARY SYSTEM Community & Econ. Dev. Services FILE 33325 8th Ave S PRIME ELECTRIC INC Federal Way, WA 98003 ISSAQUAH WA 98027-2702 Ph: (253) 835-2607 Fax: (253) 835-2609 13301 SE 26TH ST Electrical Permit #: 14 -101433 -00 -EL Inspection Request Line: (253) 835-3050 Project Name: KING COUNTY LIBRARY @ SOUTH 320TH STREET Project Address: 848 S 320TH ST Project Description: 1144516 Install (3) LED wallpacks at employee entry Parcel Number: 082104 9222 Owner Al2RIlican Contractor KING COUNTY LIBRARY SYSTEM JEREMY STEEB PRIME ELECTRIC INC 960 NEWPORT WAY NW PRIME ELECTRIC INC PRIMEEI134BT (1/30/15) ISSAQUAH WA 98027-2702 13301 SE 26TH ST 13301 SE 26TH ST BELLEVUE WA 98005 BELLEVUE WA 98005 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Service greater than 999 Amps? .............................No Electrical Fixtures Circuits - CommerciaL................... 1 Is Use Educational or Institutional?.......................No PERMIT EXPIRES Saturday, September 27, 2014 Permit Issued on Monday, March 31, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ^ w 11 I ki C Date: ■ ■ V LM <FjNq�FO CrFV �F 400I&I-m Federal Way PERMIT #: 14 -101433 -00 -EL THIS CARD IS TO MAIN ON-SITE Construction In ection Record INSPECTION REQ TS: (253) 835-3050 Address: 848 S 320TH ST Project: KING COUNTY LIBRARY SYSTEM FEDERAL WAY, WA 98003-5346 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Service (4235) Feeders/Sub-panels (4045) Final Electrical Approved Rough Electrical (4225) 0 Approved rBy Approved Date Approved By Date Date By Date Ceiling Cover (4020) Final - Electrical (4055) Approved Approved By Date Dat_ l Rough Electrical Approved Final Electrical Approved 0 Right of Way —� Approved By Date By Date By Date