12-100807Electrical
CaFederal Way Permit #: 12-100807-00-E L
Community
& Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FINK
Project Address: 1002 S 312TH ST Unit 124 Parcel Number: 414260 0100
Project Description: Repair defective panel bussing
Additional Permit Information
Is Use Educational or Institutional? ....................... No
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 amps (F 1
PERMIT EXPIRES Thursday, February 20, 2014
Permit Issued on Tuesday, February 21, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent:1; Date:a-
kr'(X"� Xkc') Z1r4o1(2w
Owner
Applican
Contractor
AILEEN L FINK
KAREN HANSON
BOYER ELECTRIC
1002 S 312TH ST UNIT 124
Electrical Contractor
BOYERECIO1LE (6/5/12)
FEDERAL WAY WA 98003-4774
830A N 127TH ST
830A N 127TH ST
SEATTLE WA 98133
SEATTLE WA 98133-8030
Additional Permit Information
Is Use Educational or Institutional? ....................... No
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 amps (F 1
PERMIT EXPIRES Thursday, February 20, 2014
Permit Issued on Tuesday, February 21, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent:1; Date:a-
kr'(X"� Xkc') Z1r4o1(2w
TMS CARD IS TOMAIN ON-SITE
CITY OF 41 Construction Inlection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 12 -100807 -00 -EL Address: 1002 S 312TH ST Unit 124
Project: AILEEN L FINK FEDERAL WAY, WA 98003-4774
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Ceiling Cover (4020)Final - Electrical (4055)
Approved Approved
By Date By 0 Date _ a
Service (4235)
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
1:1Approved
Approved
By
Approved
Approved
By
Date
By
Date
By
Date
Ceiling Cover (4020)Final - Electrical (4055)
Approved Approved
By Date By 0 Date _ a
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date