Loading...
18-102032City of Federal Way Applicant Community Development Dept. S8th Ave S OPM Federalal W Way, WA 98003 FILL Ph: (253) 835-2607 Fax: (253) 835-2609 29630 22ND AVE S Project Name: STEEL LAKE PRESBYTERIAN CHURCH Project Address: 1829 S 308TH ST Electrical Permit #:18 -102032 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 092104 9134 Project Description: Adding 2 low voltage motors to front entrance gates, and low voltage controlls Owner Applicant Contractor STEEL LAKE PRESBYTERIAN CHURCH VIKTOR GRUY OWNER IS CONTRACTOR 1829 S 308TH ST 29630 22ND AVE S FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes a. "x s ii() �:.. .� E;K c' '� 5"A,� ,�sy " }v:.-� ,€` �� y;�' �lr. €ysy,,,�. ,r, .( � „€�� CommercialCircuits - 1 1 1 PERMIT EXPIRES Saturday, 11 May, 2019 Permit Issued on Fridav, May 11, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 6NLINE hing on and t C' deral Way. Owner or agent: Date: FINALED errr CW V& Federal Way PERMIT #: 18102032 00 THIS CAki IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 1829 S 308TH ST Project: STEEL LAKE PRESBYTERIAN CHI FEDERAL WAY WA 98003-4820 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. In UFER Ground (4295)2❑ ® Ditch cover (4030) ® Slab/Concrete Floor (4255) Approved Right of Way Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) 5 Approved By Date By Temporary Power (4275) ® Service (4235) Approved Approved Date By Date 0 Final Electrical Approved , Feeders/Sub-panels (4045) ® Rough Electrical (4225) ® Ceiling Cover (4020) Approved Right of Way Approved Approved Approved By Date By Date By Date 0 Final Electrical Approved , Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By - Date