Loading...
18-101961a Electrical City of Federal way — Permit #:18 -101961 -00 -EL Community Development Dept. POW 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax (253) 835-2609 FILIII� Project Name: ABAM OFFICE BUILDING Project Address: 33301 9TH AVE S Parcel Number: 926501 0130 Project Description: Performing a-2 hour load bank test of emergency standby generator located in a locked bunker outside. Owner Applicant Contractor SHELBY COMPANY C/O K MATHEWS AMANDA NOKESPACIFIC POWER GROUP PACIFIC POWER GROUP LLC DBA 1201 PACIFIC AVE UNIT 1400 LLC DBA PACIFIC POWER GENERATION PACIFIC POWER GENERATION TACOMA WA 98402 5808 S 196TH ST PACIFPG867D7 (3/28/20) KENT WA 98032 805 BROADWAY ST SUITE 700 VANCOUVER WA 98660 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Temp. Service: 0 - 60 amps (A I PERMIT EXPIRES Wednesday, 8 May, 2019 Permit Issued on Tuesday, May 8, 2018 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. n Owner or agent: �' I I K I I= Date: O i - crnr of 4kAli& Federal Way PERMIT #: 1810196100 THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 333019TH AVE S Project: SHELBY COMPANY c% K MATHE` FEDERAL WAY WA 98003-2602 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground (4295) 0 Ditch cover (4030) ® Slab/Concrete Floor (4255) 0 Approved Approved Illy Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) 0 Temporary Power (4275) ® Service (4235) 0 Approved Approved Illy Approved By Date By Date By Date 7❑ Feeders/Sub-panels (4045) ® Rough Electrical (4225) Final Electrical Ceiling Cover (4020) 0 Approved Approved Illy Approved By Date By Date Approved Date Eo Final - Electrical (4055) Approved By Date Rough Electrical Final Electrical 0 Right of Way Approved Approved Approved By Date By Date . . By Date