13-103664r Ekdrical
City of Federal Way
Community & Econ. Dev. Services Permit #: 13 -103664 -00 -EL
33325 8th Ave S
Federal Way, WA 98003 nest Inspection Re Line: 253
Ph: (253) 835-2607 Fax: (253) 835-2609 FILE p Q ► 835-3050
Project Name: FITNESS EVOLUTION
Project Address: 1211 S 320TH ST Parcel Number: 150050 0030
Project Description: Adding and relocating fire alarm devices on existing system.
,Owner
Anolicant
Contractor
MGP IX SUNSET SQUARE LLC
DANIEL ERNSTING
WESTERN STATES FIRE PROTECTION
425 CALIFORNIA ST FLOOR 11
WESTERN STATES FIRE PROTECTION
WESTESF136QF (1/19/15)
SAN FRANCISCO CA 94104
14690 NE 95TH ST SUITE #101
7102 180TH AVE NE SUITE A105
REDMOND WA 98052
REDMOND WA 98052
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional?....................... No
Service greater than 999 Amps? .............................No
Electrical Fixtures
Low Voltage - Fire Alarm (Comme 18
PERMIT EXPIRES Monday, February 17, 2014
Permit Issued on Wednesday, August 21, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
FINALED
CITY OF s
Federal Way
i IHIS CARD IS TO DOMAIN ON-SITE
Construction Ins ection Record
INSPECTION REQUE TS: (253) 835-3050
PERMIT #: 13 -103664 -00 -EL Address: 1211 S 320TH ST
Project: MGP IX SUNSET SQUARE LLC FEDERAL WAY, WA 98003-5339
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
ti Final - Electrical (4055)
Approved
Date U V2� 1
❑
UFER Ground (4295)
Ditch cover (4030)
Final Electrical
Approved
Slab/Concrete Floor (4255)
❑
Approved
Temporary Power (4275)
Approved
Pool Bonding (4195)
Approved to place concrete
By
Date
By
Date
By
Date
ti Final - Electrical (4055)
Approved
Date U V2� 1
❑
Rough Electrical
Approved
❑
Final Electrical
Approved
❑
Service (4235)
Temporary Power (4275)
Date
Pool Bonding (4195)
By
Approved
By
Approved
Approved
By
Date
By
Date
By
Date
❑
Ceiling Cover (4020)
Rough Electrical (4225)
Feeders/Sub-panels (4045)
Approved
Approved
Approved
By
Date
B
Date
By
Date
ti Final - Electrical (4055)
Approved
Date U V2� 1
❑
Rough Electrical
Approved
❑
Final Electrical
Approved
❑
Right of Way
• Approved
By
Date
By
Date
By
Date