13-103549City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003 ILE
Ph: (253) 835-2607 Fax: (253) 835-2609
Wuilding - Commef al
Permit #: 13 -103549 -00 -CO
Inspection Request Line: (253) 835-3050
Project Name: COLLAB HEALTH PLAN SERVICES - SUITES 100 & 201
Project Address: 32129 WEYERHAEUSER WAY S Suite 100
Parcel Number: 215484 0020
Project Description: TI - Interior remodel improvements to suites 100 & 201 to include demolition of non -load
bearing wall to create larger office,meeting room and lobby. No plumbing or mechanical.
Owner
ARRIlcant
Contractor
!moi
EAST CAMPUS TERRACE LLC
RANDY BROWN
SCHAFER CONSTRUCTION
U S BANK
C/O:PREFERRED PROP SOLUTION
SYNTHESIS PLLC
SCHAFCL938DO (3/20/15)
621 CAPITOL MALL SUITE 800
520 CAPITOL MALL SUITE 150
12503 BEL -RED RD SUITE 101
PO BOX 724
SACRAMENTO CA 95814
SACRAMENTO CA 95814
BELLEVUE WA 98005
BELLEVUE WA 98009
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1 #2 #3 #4
Occupancy Class:
B
Construction Type:
Type II - B
Occupancy Load
Floor Areas . ft.
0 0 0 0
Additional Permit Information
Existing Sprinkler System in Building?.................Yes Mechanical to be Included? .................................... No
Number of Stories.................................................2 Permit for Building Shell Only? ............................. No
Plumbing to be Included?......................................No Occupancy # 1 - Use............................................... Professional
Services/Offices
No Fixtures Associated With This Permit !!
CONDITIONS:
Separate Electrical Permit Required
PERMIT EXPIRES Sunday, February 9, 2014
Permit Issued on Tuesday, August 13, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: t P2) NT
TO S RO
Date:
Q\ ��p
Fff"JALED��LC 0 �L- ��
,
Applicant
City of Federal Way
Lender
Community & Econ. Dev. Services
33325 8th Ave S
I
Federal Way, WA 98003
E �
Ph: (253) 835-2607 Fax: (253) 835-2609
i;
4guilding - Commercial
Permit #: 13 -103549 -00 -CO
Inspection Request Line: (253) 835-3050
Project Name: COLLAB HEALTH PLAN SERVICES - SUITES 100 & 201
Project Address: 32129 WEYERHAEUSER WAY S Suite 100
Parcel Number: 215484 0020
Project Description: TI - Interior remodel improvements to suites 100 & 201 to include demolition of non -load
bearing wall to create larger office,meeting room and lobby.. No plumbing or mechanical.
Owner
Applicant
Contractor
Lender
PANATTONI DEVELOPMENT CO
RANDY BROWN
OWNER IS CONTRACTOR
OWNER IS LENDER
6840 FORT DENT WAY SUITE 350
SYNTHESIS PLLC
SEATTLE WA 98188
12503 BEL -RED RD SUITE 101
BELLEVUE WA 98005
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1 #2 #3 #4
Occupancy Class:
B
Construction Type:
Type II - B
Occupancy Load
Floor Areas . ft.
0 0 0 0
Additional Permit Information
Existing Sprinkler System in Building?.................Yes Mechanical to be Included? ................................... No
Number of Stories.................................................2 Permit for Building Shell Only? ............................ No
Plumbing to be Included?.......................................No Occupancy # 1 - Use............................................... Professional
Services/Offices
No Fixtures Associated With This Permit 11
CONDITIONS:
Separate Electrical Permit Required
PERMIT EXPIRES Sunday, February 9, 2014
Permit Issued on Tuesday, August 13, 2013
1 hereby certifIthaabove information is correct and that the construction on the above described property and
the occupance willbe in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or age Date: 60 )Z7 Z�I
CITY OR 4A�p
Federal Way
PERMIT #:
Project:
` THIS CARD IS TOIN ON-SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835-3054
13 -103549 -00 -CO Address: 32129 WEYERHAEUSER WAYS Suit
EAST CAMPUS TERRACE LLC FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Re -steel (4215)
SWM Precon Site Mtg (4400)
Slab/Concrete Floor (4255)
Initial Erosion Control (4365)
0
Footings/Setback (4110)
Approved
By
To be done prior to breaking ground
By Date
Approved to place concrete
By
Date
By
Date
By
Date
Re -steel (4215)
0
Slab/Concrete Floor (4255)
Underfloor Framing (4285)
Approved to place concrete or grout
Approved to place concrete
By
Approved to sheath floor
By Date
By
Date
By
Date
Date
Interim Erosion Control (4370)
Fire/Draft Stops (4095)
Floor Sheathing (4105)
Approved to install flooring
Approved
Approved
By Date
By
Date
By
Date
Insulation (4150)
Framing (4120)
FMMPrior to scheduling a Framing inspection;El
Electrical, Plumbing & Mechanical Rough -in and
Approved to insulate
Approved to install wallboard
Fire/Draft Stop inspections must be signed -off and
IBC 1093.4
B
Date-- ( -- ('�
By
Date
approved.
Final -Fire Department (4060)
Suspended Ceiling Grid (4265)
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
Approved to drop the
Approved
B Date 0 _ o— i 3
By
Date
By
Date
Final - Planning
Final Erosion Control (4375)
Final - Building (4050)
Approved
Approved
Approved
By Date
By
Date
y
/t
C � Date
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
A
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TOMAIN ON-SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835-3050
13 -103549 -00 -CO Address: 32129 WEYERHAEUSER WAYS Suit
PANATTONI DEVELOPMENT CO FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final - Fire Department (4060)
Approved
By Date
SWM Precon Site Mtg (4400)
0
Initial Erosion Control (4365)Footings/Setback
Final Erosion Control (4375)
(4110)
Underfloor Framing (4285)
Approved
Approved to place concrete or grout
To be done prior to breaking ground
Approved to place concrete
Approved to place concrete
By
Date
By
Date
By
Date
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final - Fire Department (4060)
Approved
By Date
Re -steel (4215)
El
Slab/Concrete Floor (4255)
Final Erosion Control (4375)
Underfloor Framing (4285)
Final - Building (4050)
Approved to place concrete or grout
Approved
Approved to place concrete
By
Approved
Approved to sheath floor
By
Date
By
Date
By
Date
By
Date
Floor Sheathing (4105)
Fire/Draft Stops (4095)Interim
Erosion Control (4370)
Approved to install flooring
Approved
Approved
By
Date
By
Date
By
Date
Mr
Prior to scheduling a Framing inspectio:n....n
Framing (4120)
Insulation (4150)
Electrical, Plumbing & Mechanical Rough-idApproved
to insulate
Approved to install wallboazd
Fire/Draft Stop inspections must be signed-od
By
Date
By
Date
approved. IBC 1093.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final - Fire Department (4060)
Approved
By Date
Final - Planning
El
Final Erosion Control (4375)
Final - Building (4050)
By
Approved
By
Approved
By
Approved
By
Date
By
Date
By
Date
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
RAIVE® 0
r
My CW 4& PERMIT APPLICATION
Federal Way AUG 13 2013
CITY OF FEDERAL WAY
PERMIT NUMBER —/3 _ / 0 9a� k -V —q _ c 0 TARGET DATE
SITE ADDRESS
iib
1altiY� .
t.H S
SUITE/UNIT N
PROJECT VALUASION
$ °(�
ZONING
ASSESSOR'S TAIL/PARCEL M
TYPE OF PERMIT
$UILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
CO TL -W S S
PROJECT DESCRIPTION
Detailed description of work to
%OV 1 S C Zr- w
y
be included on this permit only
PROPERTY OWNER
NAME PRI Y PHONE
ti 04(i Z�Q "k> -1V
MAILING ADPRESS w E-MAIL
�T/ Ill '' rcw
TY..
ATE "Its
ZA \s
/vil ►iOrPHOIE
NAME
G 1n OA
MAILING ADDRESS E-MAIL
CONTRACTOR
0
Gt
W
�P� FAX 4 - Q ft �
WA STATE CONTRACTOR'S LICENSE /
2EXPIRATION DATE`` FEDERAL WAY BUSINESS LICENSE [
NAt%1 ZS G N - tai b
MAILIN ADORE -as 24, E-MAIL
&W15 ft."q'Qv too PwK
APPLICANT
ITY ' f__._ _.. STATE ..ZIP Q ..PAX
N� 8 006 gIN
PROJECT CONTACT
WIE / PRIMARY PHONE
G �'t
E-MAIL
MAHdNG \;
(The individual to receive and
respond to all correspondence
e
CITY STATE ZIP PAX
concerning this application)
PROJECT FINANCINGNAME
OWNER -FINANCED
Required EWUe of $5,000 Of mare
(RCW 19.27.095)
MAILING ADDRESS. CITY, STATE, ZIP PHONE
I cert{/'y under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental tains.
I further agree to hold hamnless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and,oftefense of such claiml, which may be made by any person, including the undersigned, and filed against the city,
but only where su claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information suppl to th city as a Part of this application.
QQ
SIGNATURE: — DATE fl� Gv Zo1
ivi
PRINT NAME: WOW N
L
Bulletin #100 - January 1, 2013 Page I of 3 kAl-taDduuLAPermit Application
GENERAL INFORMATION
CRITICAL OH PROPERTY,
WATER PDRYEYOR ^
SEWER
VALUE OF EXISTING IMPROVEMENTS
EXIST[ NG/P OUS USE
LOT SIZE (In Square Feet)
EXISTING SPRINKLER SYSTEM?
es _ No
PROPOSED FIRE SUPPRESSION SYSTEM?
C Yes No
Bulletin #100 January 1, 2013 Page: 2 of 3 kAliandoutAPermit Application