Loading...
15-102058City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FIDE ,. . w 0 Mechanical Permit #: 15 -102058 -00 -ME Inspection Request Line: (253) 835-3050 Project Name: HAESEKER -�&5t,*7 Project Address: 2637 S 304TH ST Parcel Number: 092104 9081 Project Description: Replace gas furnace and gas water heater Owner Ap Iu ican Contractor EDWARD J HAESEKER JAIME HOW BRENNAN HEATING & A/C LLC ELAINE HAESEKER BRENNAN HEATING & A/C (GENERAL) 2637 S 304TH ST 4601 S 134TH PL BRENNHA971R9 (12/29/15) FEDERAL WAY WA 98003-4811 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical' Fixtures Furnaces ......................................... 1 Hot Water Tanks............................ 1 PERMIT EXPIRES Monday, October 26, 2015 Permit Issued on Wednesday, April 29, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: rNK11 Date: Too XX4 N% `' " THWCARD IST MAIN ON-SITE CITY OF Construction Iection Record Federal Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 15 -102058 -00 -ME Address: 2637 S 304TH ST Project: EDWARD J HAESEKER FEDERAL WAY, WA 98003-4811 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. Mechanical Rough -in (4165)Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) 1:1Approved Approved By Approved to release test Approved By Date By Date By V -q3 Date 5-�— Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way By Date By Date By Date