16-102033City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
• Meehanicai
Permit #: 16 -102033 -00 -ME
Inspection Request Line: (253) 835-3050
Project Name: FEDERAL NATIONAL MORTGAGE ASSN
Project Address: 547 S 330TH PL '
Project Description: Change out of existing gas furnace
Parcel Number: 132140 0090
Owner
AR lid
Contractor
FEDERAL NATIONAL MORTGAGE ASSN
PETR PETROVICH MIRONETS
HOME COMFORT HTNG/COOLING LLC
14523 SW MILLIKAN WAY SUITE 200
HOME COMFORT HTNG/COOLING LLC
HOMECCH856D4 (3/24/17)
BEAVERTON OR 97005
16106 SE LAKE MONEYSMITH RD
16106 SE LAKE MONEYSMITH RD
AUBURN WA 98092
AUBURN WA 98092
Additional Permit Information
Mechanical Work Valuation?.................................800 Is this an Online or O.T.C. application? ................. Yes
Mechanical Fixtures
Furnaces ......................................... 1
PERMIT EXPIRES Wednesday, October 26, 2016
Permit Issued on Friday, April 29, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
d hpCi KfFideral Way.
Owner or agent: Date:
THIS CARD IS TO IN ON-SITE
crry OF Construction In ection Record,
Federal Way INSPECTION REQUE Ts: (253) 835-3050
PERMIT #: 16 -102033 -00 -ME Address: 547 S 330TH PL
Project: FEDERAL NATIONAL MORTGAGE FEDERAL WAY, WA 98003-5900
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
Gas Piping (4125)
El
Final - Mechanical (4065)
1:1Approved
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date 1.
Rough Electrical
Approved
Final Electrical
Approved
1:1Approved
Right of Way
By
Date
By
Date
By
Date