Loading...
14-102783r City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Ouilding - Single FanjEyYgT Permit #: 14 -102783 -00 -SF Inspection Request Line: (253) 835-3050 Project Name: SUNRISE AT WEST CAMPUS Project Address: 451 S 328TH ST UNIT 13C Parcel Number: 812125 0210 Project Description: REP - Dry wall and insulation replacement from fire damage. Owner ARRIicant Contractor Lender EUGENE GLENN BELFOR USA GROUP INC BELFOR USA GROUP INC OWNER IS LENDER 451 S 328TH ST UNIT C-13 4320 S 131ST PL SUITE 100 BELFOUG99OBJ (12/20/14) FEDERAL WAY WA 98003-6556 SEATTLE WA 98168 4320. S 131 ST PL SUITE 100 SEATTLE WA 98168 Census Category: 434 - Residential alt/add - no change in number of units Includes. # 1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load Floor Areas . ft. 0 0 0 0 Additional Permit Information New / Additional Sq. Feet - 3rd Floor....................0 Mechanical to be Included?....................................Yes Plumbing to be Included?.......................................Yes New / Additional Sq. Feet - Basement...................0 Plumbing Work Valuation?...................................450 Mechanical Fixtures Fans................................................ 2 Plumbing Fixtures' Water Heaters ................................. 1 k_ N e,— V-� CONDITIONS: Separate Electrical Permit Required PERMIT EXPIRES Tuesday, December 9, 2014 Permit Issued on Thursday, June 12, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and Lthese will Pe in accordance with the laws, rules and regulations of the State of Washington a of Federal Way. Owner or age Date: �' CITY OF Federal Way PERMIT #: Project: THIS CARD IS TOMAIN ON-SITE Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 14 -102783 -00 -SF Address: 451 S 328TH ST UNIT 13C EUGENE GLENN FEDERAL WAY, WA 98003-5897 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ® SWM Precon Site Mtg (4400) Initial Erosion Control (4365) Floor Sheathing (4105)Shear Plumbing Groundwork (4190) 1:1Approved Approved By To be done prior to breaking ground Approved to cover By Date By Date By Date ® Underfloor Framing (4285) Approved to install wallboard Floor Sheathing (4105)Shear Date 1:1Approved Walls (4245) By Approved to sheath floor Final - Mechanical (4065) Approved to install flooring Approved By Approved to install siding By Date By Date By Date ❑ E] Roof Sheathing (4220) Rough Plumbing (4230) Mechanical Rough -in (4165) Approved to install roofing Approved Approved By Date By a Date¢. S �l By Date ® Gas Piping (4125) E] Fire/Draft Stops (4095) Interim Erosion Control (4370) Approved to release test Approved Approved By Date By DateBy Date Prior to scheduling a Framing inspection; Framing (4120) Electrical, Plumbing & Mechanical Rough -in and Approved to insulate Fire/DraftStop inspections must be signed -off and approved. IBC 109.3.4 By Date I r Gypsum Wallboard Nailing (4130) Approved to install mud & tape By *_,y Date _ 4 - t -57 Final - Plumbing 4075) Approv By Date Final Erosion Control (4375) Approved By ate Final - Building (4050) Approved By 0ptL Date 1 , 2 Insulation (4150) Approved to install wallboard By Date 1:1Approved Right of Way -^ By Date Final - Mechanical (4065) By Approved By Date Rough Electrical Approved Final Electrical Approved 1:1Approved Right of Way -^ By Date By Date By Date 4 CITY OF ED Fed*aaf y JUN 112014 P ,I0fi Dg4WAY f 0 2 PERMIT RPPLICATION 0 vk�z �- COuN702_ \01� W/o NIQs _ TARGET DATE In Im- SITEADDRESS ' l -� C),1-3 TU) � q Z_ SUITE/UNIT # PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL # / TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT S-�?c �( , t PROJECT DESCRIPTION Detailed description of work to f'�✓�� �s`770N1J GCMG' � iC-��� be included on this permit only PROPERTY OWNER NAME A' y e4ue__ 6-?" PRIMARY PHONE /a$''7 MAILING XDDRESS ' _ ` ?( E-MAIL , r CIT y�,G e77/t'L'7�/ STA ZIPS^ C 9�15� NAME ,.i PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY p evie STATE ZIP FAX 05v0 WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINNESSS LICENSE # NAS, ., .._.._. PRIMARY PHONE APPLICANT MAILING ADDRESS Tpl M49 E-MAIL CITY �.� . J� STATE ZI FAX 15 61f` E PRIMARY PHONE PROJECT CONTACTfC."�� MAILING ADDRESS E-MAIL (The individual to receive and respond to all correspondence CITY T TE FAX concerning this application) PROJECT FINANCING NAME El' OWNER -FINANCED Required value of $5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied t the city a part of this app lic ion. i- �! � p4 SIGNATU DATE [ PRINTNAME: Bulletin #100 - January 1, 2013 Page 1 of 3 k:11andoutsTermit Application