12-101749 wilding - Commercial
City ofFederal Way - Permit #: 12-101749-00-CO
Community&EcoEcon.Dev.Services
33325 8th Ave S
Federal Way,WA 98003
Ph:(253)835-2607 Fax (253)835-2609 Inspection Request Line: (253)835-3050
Project Name: TAMU FOODS INC
Project Address: 1112 S 344TH ST SUITE 304 Parcel Number: 926480 0080
Project Description: TI-Construction of new partition walls and suspended ceiling grid for new food
preparation tenant,no plumbing or mechanical.****THIS PERMIT IS TO COMPLETE
FINAL APPROVAL OF PREVIOUS PERMIT#07-105633-00 CO***
Owner Applicant Contractor Lender,
HARSCH INVESTMENTS JAMES GITHUI 2805 SW 342ND ST JAMES GITHUI
PROPERTIES LLC 2805 SW 342ND ST FEDERAL WAY WA 98023 2805 SW 342ND ST
13010 20TH ST NE SUITE 450 FEDERAL WAY WA 98023 FEDERAL WAY WA 98023
BELLEVUE WA 98005
Census Category: 437 -Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class: B
Construction Type:
Occupancy Load:
Floor Area(sq.ft.) 1,339 0 0 0
Additional Permit Information
Existing Sprinkler System in Building? No Mechanical to be Included No
Number of Stories 1 Permit for Building Shell Only? No
Plumbing to be Included? No New/Additional Sq.Feet-Total 0
Occupancy#1-Use Factory-Moderate Zoning Designation CE
Hazard
No Fixtures Associated With This Permit!!
,.; 4k4/1Z
CONDITIONS:
Subject to field inspection without plans.
• PERMIT EXPIRES Tuesday, October 16, 2012
Permit Issued on Thursday,April 19, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and t e will be in accordance with the laws, rules and regulations of the State of Washington
7))�� ` and the City of Federal Way.
/ 1 1Owner or agent: . Date: �� � I Z
CITY OF • THIS CARD IS T MAIN ON-SITE
Construction I ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 12-101749-00-CO Address: 1112 S 344TH ST SUITE 304
Project: HARSCH INVESTMENTS PROPER' FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) El Footings/Setback(4110)
Approved To be done prior to breaking ground Approved to place concrete
By Date By Date By Date
El Re-steel(4215) ❑ Slab/Concrete Floor(4255) 0 Underfloor Framing(4285)
Approved to place concrete or grout Approved to place concrete Approved to sheath floor
By Date By Date By Date
,
El Floor Sheathing(4105) Fire/Draft Stops(4095) Interim Erosion Control(4370)
Approved to install flooring Approved Approved
By Date By Date By Date
.
Prior to scheduling a Framing inspection; 0 Framing(4120) El Insulation(4150)
Electrical,Plumbing&Mechanical Rough-in and Approved to insulate Approved to install wallboard
Fire/Draft Stop inspections must be signed-off and
approved. IBC 109.3.4 By Date By Date
0 Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid(4265) 0 Final-Fire Department(4060)
Approved to install mud&tape Approved to drop tile Approved
By Date By Date By Date
0 Final Erosion Control(4375) El Final-Building(4050)
Approved Approved
By Date BYO, t Date ,,a
❑ Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date