Loading...
13-103362 4 i •uilding -_Com*mercial City of Federal Way7.4 Permit 13 103362-00-CO Community&Econ.Dev.Services i i #: - 33325 8th Ave S �`= I Federal Way,WA 98003 lia . Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: COMMONS APARTMENTS(fka PANTHER RIDGE 4PLEX) . l 5 Project Address /01 5 334 (fact, Parcel Number: 132203 0010 Project Description: ADD-Install new 15'tall kinetic sculpture. Owner Applicant Contractor Lender FAOF PANTHER RIDGE LLC WENDY GIBSON HEATH NORTHWEST(GENERAL) 4685 MACARTHUR CT SUITE 400 HEATH NORTHWEST(GENERAL) HEATHNI981JE(3/23/14) NEWPORT BEACH CA 92660 727 S 96TH ST 727 S 96TH ST SEATTLE WA 98108 SEATTLE WA 98108 Census Category: 437- Commercial alt/add/conversion Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq.ft.) 0 0 0 0 Additional Permit Information Mechanical to be Included? No Number of Stories. 1 Permit for Building Shell Only? No Plumbing to be Included? No New/Additional Sq.Feet-Total 0 No Fixtures Associated With This Permit I! PERMIT EXPIRES Tuesday, March 4, 2014 Permit Issued on Thursday, September 5, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington �r and the City of Federal Way. Owner or agent Date: q ` 5. i3 (7\2 (11141 (7 0 ° i3 J l'2(' / 1( FINALED • 44116. , THIS CARD IS TO MAIN ON-SITE e , CITY OF • Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-103362-00-CO Address: 100 S 334TH ST Project: THE COMMONS APARTMENTS FEDERAL WAY, WA 98003-6245 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. SWM Precon Site Mtg(4400) ❑ Initial Erosion Control(4365) Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By %M Date 1 o 124 113 �JJ Foundation Wall(4115) 0 Drainage/Downspout(4040) ElRe-steel(4215) Approved to place concrete Approved to backfill Approved to place concrete or grout By Date By Date By Date O Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By. Date ' Shear Walls(4245) 0 Roof Sheathing(4220) Fire/Draft Stops(4095) Approved to install siding Approved to install roofing Approved By Date By Date By Date O Interim Erosion Control(4370) Prior to scheduling a Framing inspection; ❑ Framing(4120) Approved Approved to insulate Electrical,Plumbing&Mechanical Rough in and Fire/Draft Stop inspections must be signed-off and By Date approved. IBC 109.3.4 By Date O Insulation(4150) 0 Gypsum Wallboard Nailing(4130) ❑ Suspended Ceiling Grid(4265) Approved to install wallboard Approved to install mud&tape Approved to drop tile By Date By Date By Date • Final-Fire Department(4060) 0Final-Planning ❑ Final Erosion Control(4375) Approved Approved Approved By Date By Date By Date El Final-Building(4050) , Approved C Date.-L--?✓(- 1 I 1 El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date