17-101556 r r ;
Mechanical
City y Federal Way ' •
CommuaityDevelopment Dept. Permit #.17-101556-60-ME
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: DAVIS
Project Address: 29846 24TH PL S Parcel Number:768220 0100
Project Description: Replace furnace
Owner Applicant Contractor
CEDRIC DAVIS TAYLER MILLERADVANCED FILTER& ADVANCED FILTER&MECHANICAL
29846 24TH PL S MECHANICAL INC(GENERAL)
FEDERAL WAY WA 98003 418 NW VALLEY AVE ADVANFM044RD(12/29/18)
USA PUYALLUP WA 98371 910 VALLEY AVE NW SUITE 104
PUYALLUP WA 98371
Additional Permit Information
Mechanical Work Valuation? 1100.00 Is this an Online or O.T.C.application Yes
xr
Furnaces 1
PERMIT EXPIRES Monday,2 October,2017
Permit Issued on Wednesday,April 5,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: II I N F Date:
F
INALED
40
•
THIS CARD IS TO REMAIN ON-SITE
REMAI4064 N ON-SITInspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 101556 00 Address: 29846 24TH PL S
Project: CEDRIC DAVIS FEDERAL WAY WA 98003-4203
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ID Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date •� �S Date
• 1,
•
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date