Loading...
17-101556 r r ; Mechanical City y Federal Way ' • CommuaityDevelopment Dept. Permit #.17-101556-60-ME 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: DAVIS Project Address: 29846 24TH PL S Parcel Number:768220 0100 Project Description: Replace furnace Owner Applicant Contractor CEDRIC DAVIS TAYLER MILLERADVANCED FILTER& ADVANCED FILTER&MECHANICAL 29846 24TH PL S MECHANICAL INC(GENERAL) FEDERAL WAY WA 98003 418 NW VALLEY AVE ADVANFM044RD(12/29/18) USA PUYALLUP WA 98371 910 VALLEY AVE NW SUITE 104 PUYALLUP WA 98371 Additional Permit Information Mechanical Work Valuation? 1100.00 Is this an Online or O.T.C.application Yes xr Furnaces 1 PERMIT EXPIRES Monday,2 October,2017 Permit Issued on Wednesday,April 5,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: II I N F Date: F INALED 40 • THIS CARD IS TO REMAIN ON-SITE REMAI4064 N ON-SITInspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 101556 00 Address: 29846 24TH PL S Project: CEDRIC DAVIS FEDERAL WAY WA 98003-4203 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ID Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date •� �S Date • 1, • Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date