15-100120Mechanical
Permit #: 15 -100120 -00 -ME
Inspection Request Line: (253) 835-3050
i $7
Project Name: FIELD
Project Address: 1724 S 340TH ST Parcel Number: 212104 9041
Project Description: Adding gas pipe to home and a new gas furnace.
Owner
ARRlican
City of Federal Way
ILA FIELD
Community & Econ. Dev. Services
A A A HEATING & AIR CONDITIONING INC
33325 8th Ave S
FILE
Federal Way, WA 98003
FEDERAL WAY WA 98003-6834
Ph: (253) 835-2607 Fax: (253) 835-2609
22653 83RD AVE NW
Mechanical
Permit #: 15 -100120 -00 -ME
Inspection Request Line: (253) 835-3050
i $7
Project Name: FIELD
Project Address: 1724 S 340TH ST Parcel Number: 212104 9041
Project Description: Adding gas pipe to home and a new gas furnace.
Owner
ARRlican
Contractor
ILA FIELD
JORDAN CARASA
A A A HEATING & AIR CONDITIONING INC
1800 S 340TH ST
A A A HEATING & AIR CONDITIONING INC
AAAHTRI971LW (6/19/15)
FEDERAL WAY WA 98003-6834
22641 83RD AVE S
22653 83RD AVE NW
KENT WA 98032
KENT WA 98032
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes
Mechanical Fixtures
Furnaces......................................... 1 Gas Piping ...................................... 1
PERMIT EXPIRES Saturday, July 11, 2015
Permit Issued on Monday, January 12, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: iftamn MftMllllllllll Date:
UNLINIt
��J
cITY tlF 4Ai�
Federal Way
PERMIT #:
Project:
THIS CARD IS TO MAIN ON-SITE
'Construction In ection Record
INSPECTION REQ TS: (253) 835-3050
15 -100120 -00 -ME Address: 1724 S 340TH ST
ILA FIELD FEDERAL WAY, WA 98003-6833
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Rough Electrical Final Electrical Right of Way
Approved Approved F1 Approved
By Date By Date By Date
Mechanical Rough -in (4165)Gas
Piping (4125)
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date1_ ^�,�
By
Date
Rough Electrical Final Electrical Right of Way
Approved Approved F1 Approved
By Date By Date By Date