13-101311.r- - •
City of Federal Way
Community &Econ. Dev. Services FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HERITAGE CONDOMINIUMS UNIT E
Project Address: 119 S 340TH ST Unit E
Project Description: Panel Change and dryer circuit
0
Electrical
Permit #: 13 -101311 -00 -EL
Inspection Request Line: (253) 835-3050
Parcel Number: 325945 0410
Owner
Applicant
Contractor
ALAN LEE DRAKE
RICHARD DUNNIHOO
BOWIE ELECTRIC SERVICE & SUPPLIES
CHARLENE F DRAKE
BOWIE ELECTRIC SERVICE & SUPPLIES INC
INC
119 S 340TH ST UNIT E
2232 NW MARKET ST 1 -
BOWIEES024DE (3/5/14)
FEDERAL WAY WA 98003
SEATTLE WA 98107
2232 NW MARKET UNIT I
SEATTLE WA 98107
Additional Permit Information
Is this an Online or O.T.C. application?.................Yes Is Use Educational or Institutional? ....................... No
Service greater than 999 Amps? .............................No
Electrical Fixtures
Alt. Serv./Feeder: 0 to 200 amps @ 1 Circuits - Multi -family ................... 1
PERMIT EXPIRES Saturday, March 21, 2015
Permit Issued on Thursday, March 21, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
a/r.5-AaL.
D
Cr" CW
Fedeiral Way
PERMIT #:
Project:
TIIIS CARD IS TO MAIN ON-SITE
Construction In ection Record
INSPECTION REQU TS: (253) 835-3050
13 -101311 -00 -EL Address: 119 S 340TH ST Unit E
ALAN LEE DRAKE FEDERAL WAY, WA 98003-6614
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
a
LIFER Ground (4295)
Ditch cover (4030)
Temporary Power (4275)
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
a
Pool Bonding (4195)
Temporary Power (4275)
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Ceiling Cover (4020)
Rough Electrical (4225)
Feeders/Sub-panels (4045)1:1
Approved
Approved
Approved
By
Date
By
Date
By
Date
0 Final - Electrical (4055)
Approved
By Date 2Y— %5-A
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date