10-101753 411
/1P1 gib Mechanical
City of Federal Way Permit #: 10-101753-00-ME
Community Development Services
P.O.Box 9718
Federal Way,WA 98063-9719 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: MOORE
Project Address: 30019 2ND PL SW Parcel Number: 720530 0200
Project Description: Replace gas water heater
Owner Applicant Contractor
JOHN R MOORE NORTHWEST PERMIT INC WASHINGTON ENERGY SERVICES CO
30019 2ND PL SW 1345 W GULF RD (GENERAL)
FEDERAL WAY WA 98023-3568 POINT ROBERTS WA 98281 WASHIES9710B(9/2/11)
2800 THORNDYKE AVE W
SEATTLE WA 98199
Mechanical Valuation 750.00 Is this an Online or O.T.C.application? Yes
Hot Water Tanks 9:
PERMITEXPIRES Wednesday, October 27, 2010
Permit Issued on Friday,April 30, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
O and the City of Federal Way. 4/3c40
Owner or agent:
NIP(Nie° Date:
��M1L,eD jo id
THIS CARD IS T MAIN ON-SITE
CI;,roF Construction I ection Record
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 10-101753-00-ME Address: 30019 2ND PL SW
Owner: JOHN R MOORE FEDERAL WAY, WA 98023-3568
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) El Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Date S /Il I a
-1
[ I I i —
El Rough Electrical Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date