Loading...
14-105486Ml6chanical City & Federal way Permit #: 14-105486-00-M E CommunityEcon. ev. Services FILE 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph. (253) 835-2607 Fax: (253) 835-2609 Project Name: TURETT Project Address: 29337 2ND AVE SW Parcel Number: 119600 1365 Project Description: Replace gas hot water tank. Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Hot Water Tanks ............................ 1 PERMIT EXPIRES Saturday, April 18, 2015 Permit Issued on Monday, October 20, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington ON-LINE City of Federal Way. Owner or agent: Date: Owner Al2In ican Contractor KIM & GAIL TURETT KIM & GAIL TURETT OWNER IS CONTRACTOR 29337 2ND AVE SW 29337 2ND AVE SW FEDERAL WAY WA 98023 FEDERAL WAY WA 98023 Additional Permit Information Is this an Online or O.T.C. application?.................Yes Mechanical Fixtures Hot Water Tanks ............................ 1 PERMIT EXPIRES Saturday, April 18, 2015 Permit Issued on Monday, October 20, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington ON-LINE City of Federal Way. Owner or agent: Date: f CITY OF VAI� Federal Way PERMIT #: Project: THIS CARD IS TOMAIN ON-SITE. Construction In ection Record INSPECTION REQUE TS: (253) 835-3050 14 -105486 -00 -ME Address: 29337 2ND AVE SW KIM & GAIL TURETT FEDERAL WAY, WA 98023-3525 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough -in (4165) Gas Piping (4125) Final Electrical 'nal - Mechanical (4065) 1:1Approved Approved By Approved to release test A roved By Date By Date BI Dat es l T7 Rough Electrical Approved 1:1Approved Final Electrical 1:1Approved Right of Way By Date By Date By Date